Search


Bid Tabulations for the Letting of 5/19/2026 in District 07 - Lake Charles

Proposal:4400035308
Parish:Allen, Beauregard, Calcasieu, Cameron, Jefferson Davis
Description:RETAINER CONTRACT FOR REPAIR AND REPLACEMENT OF GUARDRAIL
Type Construction:RETAINER CONTRACT FOR REPAIR AND REPLACEMENT OF GUARDRAIL (NON-INTERSTATE ROUTES)
Estimated Construction Cost:$300,728.75
Rank License BidderConstruction Bid
150550Traffic Control Prod. Co of LA Inc.$360,451.00
251784E.L. Kirkland & Son, LLC$397,157.82
367594Traffic Commander, LLC$442,273.75


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Traffic Control Prod. Co of LA Inc.
- 2 -
E.L. Kirkland & Son, LLC
- 3 -
Traffic Commander, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 293.75  LNFT90.0026,437.50100.0029,375.00150.0044,062.50
0002704-03-00100Blocked Out Guard rail 1,931.5   LNFT50.0096,575.0040.0077,260.0020.0038,630.00
0003704-06-00200Guard Rail Bridge Attachments (Single Thrie Beam) 18.75  LNFT10.00187.50100.001,875.00100.001,875.00
0004704-07-00200Guard Rail Transitions (Double Thrie Beam) 56.25  LNFT100.005,625.0075.004,218.75125.007,031.25
0005704-10-00100Guard Rail End Treatment (Flared) 18     EACH4,500.0081,000.004,000.0072,000.003,500.0063,000.00
0006704-10-00200Guard Rail End Treatment (Tangent) 8     EACH5,000.0040,000.004,500.0036,000.003,500.0028,000.00
0007NS-MNT-01860Furnish and Replace Treated Timber Post 30     EACH100.003,000.00500.0015,000.00175.005,250.00
0008NS-MNT-01880Furnish and Replace Steel Post 6     EACH100.00600.00500.003,000.00225.001,350.00
0009NS-MNT-01900Furnish and Replace Treated Timber Block 19     EACH1.0019.00350.006,650.00150.002,850.00
0010NS-MNT-01940Furnish and Replace W Beam Guard Rail 27     EACH500.0013,500.00577.0015,579.00325.008,775.00
0011NS-MNT-02000Furnish and Replace Thrie Beam Guard Rail 2     EACH750.001,500.00650.001,300.00500.001,000.00
0012NS-MNT-02080Furnish and Replace Cable Assembly 7     EACH1.007.000.010.07225.001,575.00
0013NS-MNT-02160Furnish and Replace W Beam Anchor Rail 13     EACH500.006,500.001,500.0019,500.00425.005,525.00
0014NS-MNT-02200Furnish and Replace Guard Rail Extruder 3     EACH500.001,500.003,000.009,000.001,250.003,750.00
0015NS-MNT-02620Mobilization and Maintenance of Traffic (Each Site) 56     EACH1,500.0084,000.001,900.00106,400.004,100.00229,600.00
           
  CONTRACTOR TOTAL   360,451.00 397,157.82 442,273.75