Proposal:4400030167
Parish:Beauregard, Jefferson Davis
Description:Cross Drains Replacement
Type Construction:
Estimated Construction Cost:$515,048.36
| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $539,915.22 |
| 2 | 30774 | Progressive Construction Co., LLC | $584,341.22 |
| 3 | 46716 | BRUDD CONSTRUCTION CO., LLC | $599,477.36 |
| 4 | 27239 | Apeck Construction, LLC | $650,392.02 |
| 5 | 56994 | Matt L. Guinn Construction, LLC | $695,089.50 |
| 6 | 39155 | HD Truck & Tractor, LLC | $767,931.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - Progressive Construction Co., LLC | - 3 - BRUDD CONSTRUCTION CO., LLC | - 4 - Apeck Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 297.9 | SQYD | 15.50 | 4,617.45 | 28.00 | 8,341.20 | 9.08 | 2,704.93 | 28.00 | 8,341.20 | | 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 181 | SQYD | 17.00 | 3,077.00 | 82.00 | 14,842.00 | 14.91 | 2,698.71 | 28.00 | 5,068.00 | | 0003 | 202-02-03020 | Removal of Base – (Base Type) sand clay gravel | 175.7 | SQYD | 18.00 | 3,162.60 | 82.00 | 14,407.40 | 23.00 | 4,041.10 | 28.00 | 4,919.60 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" EQUIV. CMPA | 86 | LNFT | 23.50 | 2,021.00 | 94.00 | 8,084.00 | 27.50 | 2,365.00 | 42.00 | 3,612.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 72" Equiv. CMPA | 120 | LNFT | 19.50 | 2,340.00 | 94.00 | 11,280.00 | 30.00 | 3,600.00 | 63.00 | 7,560.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 23,500.00 | 23,500.00 | 25,000.00 | 25,000.00 | 32,000.00 | 32,000.00 | | 0007 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 425.00 | 3,400.00 | 300.00 | 2,400.00 | 500.00 | 4,000.00 | 2,300.00 | 18,400.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 749 | LNFT | 3.00 | 2,247.00 | 9.00 | 6,741.00 | 5.56 | 4,164.44 | 9.00 | 6,741.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 18.3 | CUYD | 245.00 | 4,483.50 | 150.00 | 2,745.00 | 185.00 | 3,385.50 | 321.00 | 5,874.30 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) Summary Sheet quantity | 40.6 | CUYD | 230.00 | 9,338.00 | 150.00 | 6,090.00 | 166.00 | 6,739.60 | 321.00 | 13,032.60 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 125 | CUYD | 160.00 | 20,000.00 | 150.00 | 18,750.00 | 181.00 | 22,625.00 | 270.00 | 33,750.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 227.9 | TON | 300.00 | 68,370.00 | 440.00 | 100,276.00 | 355.00 | 80,904.50 | 500.00 | 113,950.00 | | 0013 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 104 | LNFT | 180.00 | 18,720.00 | 310.00 | 32,240.00 | 337.00 | 35,048.00 | 240.00 | 24,960.00 | | 0014 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 160 | LNFT | 380.00 | 60,800.00 | 428.00 | 68,480.00 | 419.00 | 67,040.00 | 416.00 | 66,560.00 | | 0015 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 445.73 | CUYD | 253.00 | 112,769.69 | 202.00 | 90,037.46 | 215.00 | 95,831.95 | 230.00 | 102,517.90 | | 0016 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 804 | SQYD | 106.00 | 85,224.00 | 66.00 | 53,064.00 | 85.00 | 68,340.00 | 119.00 | 95,676.00 | | 0017 | 711-04-00100 | Geotextile Fabric | 804 | SQYD | 3.00 | 2,412.00 | 3.50 | 2,814.00 | 2.75 | 2,211.00 | 6.00 | 4,824.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 34,000.00 | 34,000.00 | 42,000.00 | 42,000.00 | 49,000.00 | 49,000.00 | | 0019 | 726-01-00100 | Bedding Material | 78.89 | CUYD | 182.00 | 14,357.98 | 244.00 | 19,249.16 | 162.50 | 12,819.63 | 178.00 | 14,042.42 | | 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 43,000.00 | 43,000.00 | 55,000.00 | 55,000.00 | 95,000.00 | 95,000.00 | 16,500.00 | 16,500.00 | | 0021 | 739-01-00100 | Hydro-Seeding | 0.105 | ACRE | 35,000.00 | 3,675.00 | 20,000.00 | 2,100.00 | 55,600.00 | 5,838.00 | 40,600.00 | 4,263.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,500.00 | 8,500.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | 9,200.00 | 9,200.00 | | 0023 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 960 | INLF | 2.50 | 2,400.00 | 2.50 | 2,400.00 | 3.25 | 3,120.00 | 10.00 | 9,600.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 539,915.22 | | 584,341.22 | | 599,477.36 | | 650,392.02 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Matt L. Guinn Construction, LLC | - 6 - HD Truck & Tractor, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 297.9 | SQYD | 5.00 | 1,489.50 | 23.00 | 6,851.70 | | 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 181 | SQYD | 5.00 | 905.00 | 21.00 | 3,801.00 | | 0003 | 202-02-03020 | Removal of Base – (Base Type) sand clay gravel | 175.7 | SQYD | 5.00 | 878.50 | 22.00 | 3,865.40 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" EQUIV. CMPA | 86 | LNFT | 70.00 | 6,020.00 | 58.00 | 4,988.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 72" Equiv. CMPA | 120 | LNFT | 70.00 | 8,400.00 | 93.00 | 11,160.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 35,000.00 | 35,000.00 | 58,000.00 | 58,000.00 | | 0007 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 1,000.00 | 8,000.00 | 650.00 | 5,200.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 749 | LNFT | 4.00 | 2,996.00 | 2.00 | 1,498.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 18.3 | CUYD | 150.00 | 2,745.00 | 550.00 | 10,065.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) Summary Sheet quantity | 40.6 | CUYD | 150.00 | 6,090.00 | 350.00 | 14,210.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 125 | CUYD | 115.00 | 14,375.00 | 0.01 | 1.25 | | 0012 | 502-01-00100 | Asphalt Concrete | 227.9 | TON | 500.00 | 113,950.00 | 450.00 | 102,555.00 | | 0013 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 104 | LNFT | 250.00 | 26,000.00 | 300.00 | 31,200.00 | | 0014 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 160 | LNFT | 700.00 | 112,000.00 | 450.00 | 72,000.00 | | 0015 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 445.73 | CUYD | 300.00 | 133,719.00 | 360.00 | 160,462.80 | | 0016 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 804 | SQYD | 100.00 | 80,400.00 | 130.00 | 104,520.00 | | 0017 | 711-04-00100 | Geotextile Fabric | 804 | SQYD | 2.00 | 1,608.00 | 8.00 | 6,432.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | | 0019 | 726-01-00100 | Bedding Material | 78.89 | CUYD | 150.00 | 11,833.50 | 260.00 | 20,511.40 | | 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 71,500.00 | 71,500.00 | | 0021 | 739-01-00100 | Hydro-Seeding | 0.105 | ACRE | 8,000.00 | 840.00 | 22,000.00 | 2,310.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 24,000.00 | 24,000.00 | 12,000.00 | 12,000.00 | | 0023 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 960 | INLF | 4.00 | 3,840.00 | 5.00 | 4,800.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 695,089.50 | | 767,931.55 |
|