Proposal:H.014062.6
Parish:Calcasieu
Description:LA 397: X-DRAIN REPLACEMENT
Type Construction:REMOVAL AND REPLACEMENT OF DRAINAGE STRUCTURES
Estimated Construction Cost:$324,681.10
| Rank | License | Bidder | Construction Bid |
| 1 | 39155 | HD Truck & Tractor, LLC | $298,791.90 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $305,368.31 |
| 3 | 36384 | JOHN BAILEY, INC. | $333,032.26 |
| 4 | 39104 | RMK Construction Company LLC | $338,414.00 |
| 5 | 56994 | Matt L. Guinn Construction, LLC | $542,414.15 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - HD Truck & Tractor, LLC | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - JOHN BAILEY, INC. | - 4 - RMK Construction Company LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 115.6 | SQYD | 10.00 | 1,156.00 | 20.50 | 2,369.80 | 15.00 | 1,734.00 | 20.00 | 2,312.00 | | 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 115.6 | SQYD | 10.00 | 1,156.00 | 20.50 | 2,369.80 | 45.00 | 5,202.00 | 20.00 | 2,312.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) REMOVE 3-60" CMPA | 303 | LNFT | 9.00 | 2,727.00 | 48.00 | 14,544.00 | 10.00 | 3,030.00 | 25.00 | 7,575.00 | | 0004 | 204-02-00100 | Temporary Hay Bales | 24 | EACH | 7.00 | 168.00 | 20.00 | 480.00 | 35.00 | 840.00 | 10.00 | 240.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 238 | LNFT | 1.50 | 357.00 | 1.75 | 416.50 | 5.00 | 1,190.00 | 6.00 | 1,428.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 205 | CUYD | 95.00 | 19,475.00 | 101.00 | 20,705.00 | 75.00 | 15,375.00 | 105.00 | 21,525.00 | | 0007 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 142 | CUYD | 95.00 | 13,490.00 | 134.00 | 19,028.00 | 50.00 | 7,100.00 | 1.00 | 142.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 34.9 | TON | 424.00 | 14,797.60 | 438.00 | 15,286.20 | 454.00 | 15,844.60 | 425.00 | 14,832.50 | | 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 289 | SQYD | 156.00 | 45,084.00 | 162.00 | 46,818.00 | 155.00 | 44,795.00 | 165.00 | 47,685.00 | | 0010 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 288 | LNFT | 200.00 | 57,600.00 | 216.00 | 62,208.00 | 350.00 | 100,800.00 | 450.00 | 129,600.00 | | 0011 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 489.85 | CUYD | 118.00 | 57,802.30 | 153.00 | 74,947.05 | 150.00 | 73,477.50 | 50.00 | 24,492.50 | | 0012 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 316 | SQYD | 85.00 | 26,860.00 | 70.00 | 22,120.00 | 85.00 | 26,860.00 | 93.00 | 29,388.00 | | 0013 | 711-04-00100 | Geotextile Fabric | 771 | SQYD | 2.00 | 1,542.00 | 2.00 | 1,542.00 | 4.00 | 3,084.00 | 2.00 | 1,542.00 | | 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 7,888.00 | 7,888.00 | 7,500.00 | 7,500.00 | 16,500.00 | 16,500.00 | | 0015 | 724-01-00100 | Rumble Strips (Centerline) | 0.014 | MILE | 500.00 | 7.00 | 570.00 | 7.98 | 6.00 | 0.08 | 5,000.00 | 70.00 | | 0016 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.014 | MILE | 500.00 | 7.00 | 570.00 | 7.98 | 6.00 | 0.08 | 5,000.00 | 70.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 29,763.00 | 29,763.00 | 11,280.00 | 11,280.00 | 23,000.00 | 23,000.00 | 28,000.00 | 28,000.00 | | 0018 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,000.00 | 11,000.00 | 2,550.00 | 2,550.00 | 2,000.00 | 2,000.00 | 7,500.00 | 7,500.00 | | 0019 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 800 | INLF | 1.00 | 800.00 | 1.00 | 800.00 | 1.50 | 1,200.00 | 4.00 | 3,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 298,791.90 | | 305,368.31 | | 333,032.26 | | 338,414.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Matt L. Guinn Construction, LLC | | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 115.6 | SQYD | 52.50 | 6,069.00 | | 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 115.6 | SQYD | 48.75 | 5,635.50 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) REMOVE 3-60" CMPA | 303 | LNFT | 72.75 | 22,043.25 | | 0004 | 204-02-00100 | Temporary Hay Bales | 24 | EACH | 100.00 | 2,400.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 238 | LNFT | 4.75 | 1,130.50 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 205 | CUYD | 165.00 | 33,825.00 | | 0007 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 142 | CUYD | 165.00 | 23,430.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 34.9 | TON | 475.00 | 16,577.50 | | 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 289 | SQYD | 136.65 | 39,491.85 | | 0010 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 288 | LNFT | 465.00 | 133,920.00 | | 0011 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 489.85 | CUYD | 340.00 | 166,549.00 | | 0012 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 316 | SQYD | 80.00 | 25,280.00 | | 0013 | 711-04-00100 | Geotextile Fabric | 771 | SQYD | 4.05 | 3,122.55 | | 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | | 0015 | 724-01-00100 | Rumble Strips (Centerline) | 0.014 | MILE | 100,000.00 | 1,400.00 | | 0016 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.014 | MILE | 100,000.00 | 1,400.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | | 0018 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,500.00 | 6,500.00 | | 0019 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 800 | INLF | 2.05 | 1,640.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 542,414.15 |
|