Proposal:H.016048.6
Parish:Lincoln
Routes:LA 33
Description:LA 33: DRAINAGE REPAIRS
Type Construction:REMOVE HEADWALL, COLLAR EXISTING JOINTS AND INSTALL NEW STORM DRAIN PIPE.
Estimated Construction Cost:$121,681.00
| Rank | License | Bidder | Construction Bid |
| 1 | 18546 | C W & W Contractors, Inc. | $98,442.10 |
| 2 | 54928 | Womack And Sons Constr. Group LLC | $149,208.00 |
| 3 | 14788 | Louisiana Bridge, Inc. | $249,294.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - C W & W Contractors, Inc. | - 2 - Womack And Sons Constr. Group LLC | - 3 - Louisiana Bridge, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing APPROX. 0.029 ACRE | 0.029 | LUMP | 8,758.69 | 8,758.69 | 35,460.00 | 35,460.00 | 35,000.00 | 35,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,438.62 | 8,438.62 | 5,260.00 | 5,260.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP | 16 | LNFT | 165.21 | 2,643.36 | 187.00 | 2,992.00 | 350.00 | 5,600.00 | | 0004 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 4,470.60 | 4,470.60 | 5,530.00 | 5,530.00 | 15,000.00 | 15,000.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 106.55 | 10,655.00 | 107.00 | 10,700.00 | 200.00 | 20,000.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 320 | LNFT | 11.60 | 3,712.00 | 10.00 | 3,200.00 | 15.00 | 4,800.00 | | 0007 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,783.81 | 3,567.62 | 5,570.00 | 11,140.00 | 4,800.00 | 9,600.00 | | 0008 | 701-16-01060 | Plastic Pipe (Extension) (24" RPVCP) | 40 | LNFT | 168.42 | 6,736.80 | 560.00 | 22,400.00 | 600.00 | 24,000.00 | | 0009 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 40 | LNFT | 117.70 | 4,708.00 | 0.05 | 2.00 | 70.00 | 2,800.00 | | 0010 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 50 | SQYD | 134.38 | 6,719.00 | 195.00 | 9,750.00 | 235.00 | 11,750.00 | | 0011 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 18 | SQYD | 231.44 | 4,165.92 | 435.00 | 7,830.00 | 235.00 | 4,230.00 | | 0012 | 711-04-00100 | Geotextile Fabric | 68 | SQYD | 1.45 | 98.60 | 25.00 | 1,700.00 | 28.00 | 1,904.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 3,692.36 | 3,692.36 | 4,700.00 | 4,700.00 | 21,000.00 | 21,000.00 | | 0014 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 19,780.49 | 1,978.05 | 84,000.00 | 8,400.00 | 29,000.00 | 2,900.00 | | 0015 | 717-01-00100 | Seeding | 2 | LB | 98.90 | 197.80 | 470.00 | 940.00 | 550.00 | 1,100.00 | | 0016 | 718-01-00100 | Fertilizer | 30 | LB | 6.59 | 197.70 | 1.80 | 54.00 | 37.00 | 1,110.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 9,636.42 | 9,636.42 | 5,150.00 | 5,150.00 | 38,000.00 | 38,000.00 | | 0018 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,373.66 | 2,373.66 | 2,800.00 | 2,800.00 | 8,000.00 | 8,000.00 | | 0019 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 5 | EACH | 3,138.38 | 15,691.90 | 2,240.00 | 11,200.00 | 6,500.00 | 32,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 98,442.10 | | 149,208.00 | | 249,294.00 |
|