Proposal:H.012392.6
Parish:Lincoln
Description:LA 151 BOX CULVERT FAILURE - ARCADIA
Type Construction:REMOVE AND REPLACE DAMAGED DRAINAGE STRUCTURES, REPLACE EMBANKMENT, REPLACE ROADWAY AND RELATED WORK
Estimated Construction Cost:$121,940.47
| Rank | License | Bidder | Construction Bid |
| 1 | 23112 | BEN ALLEN, INC. | $116,252.00 |
| 2 | 15099 | Amethyst Construction, Inc. | $122,065.00 |
| 3 | 49239 | WL Bass Construction Inc. | $136,345.00 |
| 4 | 44640 | R.D. Owens Construction, Inc. | $179,651.33 |
| 5 | 54549 | Chad Pody Construction Company, LLC | $181,570.31 |
| 6 | 32563 | The Mabry Company Llc | $182,130.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BEN ALLEN, INC. | - 2 - Amethyst Construction, Inc. | - 3 - WL Bass Construction Inc. | - 4 - R.D. Owens Construction, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) (0.037 acres) | 0.037 | LUMP | 3,500.00 | 3,500.00 | 1,500.00 | 1,500.00 | 6,000.00 | 6,000.00 | 13,000.00 | 13,000.00 | | 0002 | 202-02-00010 | Removal of BOX CULVERT AND HEADWALLS | 1 | EACH | 4,500.00 | 4,500.00 | 3,000.00 | 3,000.00 | 11,000.00 | 11,000.00 | 10,000.00 | 10,000.00 | | 0003 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 89 | SQYD | 205.00 | 18,245.00 | 165.00 | 14,685.00 | 150.00 | 13,350.00 | 216.85 | 19,299.65 | | 0004 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 112 | LNFT | 350.00 | 39,200.00 | 375.00 | 42,000.00 | 355.00 | 39,760.00 | 533.14 | 59,711.68 | | 0005 | 701-15-00100 | Concrete Collar | 4 | EACH | 2,000.00 | 8,000.00 | 2,950.00 | 11,800.00 | 1,000.00 | 4,000.00 | 1,800.00 | 7,200.00 | | 0006 | 710-01-00100 | Flowable Fill | 171 | CUYD | 145.00 | 24,795.00 | 175.00 | 29,925.00 | 135.00 | 23,085.00 | 140.00 | 23,940.00 | | 0007 | 712-02-00100 | Sacked Concrete Revetment | 30 | SQYD | 200.00 | 6,000.00 | 140.00 | 4,200.00 | 575.00 | 17,250.00 | 120.00 | 3,600.00 | | 0008 | 716-01-00100 | Mulch (Vegetative) | 0.66 | TON | 1,200.00 | 792.00 | 2,500.00 | 1,650.00 | 2,000.00 | 1,320.00 | 2,000.00 | 1,320.00 | | 0009 | 717-01-00100 | Seeding | 10 | LB | 50.00 | 500.00 | 10.00 | 100.00 | 50.00 | 500.00 | 50.00 | 500.00 | | 0010 | 718-01-00100 | Fertilizer | 330 | LB | 1.00 | 330.00 | 1.00 | 330.00 | 3.00 | 990.00 | 1.00 | 330.00 | | 0011 | 726-01-00100 | Bedding Material | 37 | CUYD | 90.00 | 3,330.00 | 135.00 | 4,995.00 | 130.00 | 4,810.00 | 150.00 | 5,550.00 | | 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 6,000.00 | 6,000.00 | 6,000.00 | 6,000.00 | 13,500.00 | 13,500.00 | 32,000.00 | 32,000.00 | | 0013 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 200.00 | 800.00 | 75.00 | 300.00 | 200.00 | 800.00 | | 0014 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 240 | INLF | 3.00 | 720.00 | 4.50 | 1,080.00 | 2.00 | 480.00 | 10.00 | 2,400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 116,252.00 | | 122,065.00 | | 136,345.00 | | 179,651.33 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Chad Pody Construction Company, LLC | - 6 - The Mabry Company Llc | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) (0.037 acres) | 0.037 | LUMP | 3,000.00 | 3,000.00 | 2,500.00 | 2,500.00 | | 0002 | 202-02-00010 | Removal of BOX CULVERT AND HEADWALLS | 1 | EACH | 18,500.00 | 18,500.00 | 4,000.00 | 4,000.00 | | 0003 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 89 | SQYD | 269.77 | 24,009.53 | 250.00 | 22,250.00 | | 0004 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 112 | LNFT | 550.00 | 61,600.00 | 475.00 | 53,200.00 | | 0005 | 701-15-00100 | Concrete Collar | 4 | EACH | 2,500.00 | 10,000.00 | 1,000.00 | 4,000.00 | | 0006 | 710-01-00100 | Flowable Fill | 171 | CUYD | 198.89 | 34,010.19 | 150.00 | 25,650.00 | | 0007 | 712-02-00100 | Sacked Concrete Revetment | 30 | SQYD | 105.00 | 3,150.00 | 250.00 | 7,500.00 | | 0008 | 716-01-00100 | Mulch (Vegetative) | 0.66 | TON | 1,200.00 | 792.00 | 2,500.00 | 1,650.00 | | 0009 | 717-01-00100 | Seeding | 10 | LB | 35.00 | 350.00 | 30.00 | 300.00 | | 0010 | 718-01-00100 | Fertilizer | 330 | LB | 1.00 | 330.00 | 2.00 | 660.00 | | 0011 | 726-01-00100 | Bedding Material | 37 | CUYD | 179.00 | 6,623.00 | 120.00 | 4,440.00 | | 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 16,506.39 | 16,506.39 | 55,000.00 | 55,000.00 | | 0013 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 250.00 | 1,000.00 | 125.00 | 500.00 | | 0014 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 240 | INLF | 7.08 | 1,699.20 | 2.00 | 480.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 181,570.31 | | 182,130.00 |
|