Proposal:4400036364R1
Parish:Claiborne
Description:LA 2A : PIPE REPLACEMENT
Type Construction:
Estimated Construction Cost:$592,554.00
| Rank | License | Bidder | Construction Bid |
| 1 | 64911 | Bentz Construction Group, LLC | $624,362.03 |
| 2 | 15099 | Amethyst Construction, Inc. | $656,549.00 |
| 3 | 71454 | Chief Bridge & Concrete LLC | $684,165.50 |
| 4 | 49239 | WL Bass Construction Inc. | $728,805.14 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Bentz Construction Group, LLC | - 2 - Amethyst Construction, Inc. | - 3 - Chief Bridge & Concrete LLC | - 4 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.008 | LUMP | 6,485.00 | 6,485.00 | 25,000.00 | 25,000.00 | 75,000.00 | 75,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 54" C.M.P.A. | 120 | LNFT | 45.00 | 5,400.00 | 65.00 | 7,800.00 | 200.00 | 24,000.00 | 20.00 | 2,400.00 | | 0003 | 203-01-00100 | General Excavation | 260 | CUYD | 26.00 | 6,760.00 | 55.00 | 14,300.00 | 75.00 | 19,500.00 | 20.00 | 5,200.00 | | 0004 | 203-03-00100 | Embankment | 138 | CUYD | 67.00 | 9,246.00 | 70.00 | 9,660.00 | 125.00 | 17,250.00 | 100.00 | 13,800.00 | | 0005 | 204-02-00100 | Temporary Hay Bales | 8 | EACH | 50.00 | 400.00 | 50.00 | 400.00 | 50.00 | 400.00 | 50.00 | 400.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 5.50 | 3,300.00 | 7.00 | 4,200.00 | 9.00 | 5,400.00 | 8.00 | 4,800.00 | | 0007 | 302-02-08020 | Class II Base Course (8" Thick) (Crushed Stone) | 266.7 | SQYD | 83.00 | 22,136.10 | 65.00 | 17,335.50 | 64.00 | 17,068.80 | 100.00 | 26,670.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 80.7 | TON | 960.00 | 77,472.00 | 325.00 | 26,227.50 | 292.00 | 23,564.40 | 350.00 | 28,245.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 733 | SQYD | 17.00 | 12,461.00 | 15.00 | 10,995.00 | 19.00 | 13,927.00 | 30.00 | 21,990.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -367 | CUYD | 2.00 | -734.00 | 100.00 | -36,700.00 | 0.10 | -36.70 | 1.00 | -367.00 | | 0011 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 267 | SQYD | 250.00 | 66,750.00 | 135.00 | 36,045.00 | 130.00 | 34,710.00 | 230.00 | 61,410.00 | | 0012 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 528 | INLF | 1.00 | 528.00 | 4.50 | 2,376.00 | 3.50 | 1,848.00 | 3.00 | 1,584.00 | | 0013 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 60 | LNFT | 2.00 | 120.00 | 5.00 | 300.00 | 234.00 | 14,040.00 | 50.00 | 3,000.00 | | 0014 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 30 | SQYD | 150.00 | 4,500.00 | 165.00 | 4,950.00 | 230.00 | 6,900.00 | 220.00 | 6,600.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,400.00 | 25,400.00 | 24,000.00 | 24,000.00 | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | | 0016 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 2,050.00 | 410.00 | 8,500.00 | 1,700.00 | 15,000.00 | 3,000.00 | 20,000.00 | 4,000.00 | | 0017 | 717-01-00100 | Seeding | 3 | LB | 33.00 | 99.00 | 6.00 | 18.00 | 50.00 | 150.00 | 20.00 | 60.00 | | 0018 | 718-01-00100 | Fertilizer | 116 | LB | 2.00 | 232.00 | 2.00 | 232.00 | 4.00 | 464.00 | 2.00 | 232.00 | | 0019 | 724-01-00100 | Rumble Strips (Centerline) | 0.227 | MILE | 32,375.00 | 7,349.13 | 25,000.00 | 5,675.00 | 10,000.00 | 2,270.00 | 320.00 | 72.64 | | 0020 | 726-01-00100 | Bedding Material | 27.4 | CUYD | 175.00 | 4,795.00 | 170.00 | 4,658.00 | 500.00 | 13,700.00 | 200.00 | 5,480.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 58,000.00 | 58,000.00 | 35,000.00 | 35,000.00 | 81,000.00 | 81,000.00 | 72,000.00 | 72,000.00 | | 0022 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 150.00 | 600.00 | 150.00 | 600.00 | 150.00 | 600.00 | 230.00 | 920.00 | | 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 8 | EACH | 150.00 | 1,200.00 | 120.00 | 960.00 | 40.00 | 320.00 | 50.00 | 400.00 | | 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.909 | MILE | 19,200.00 | 17,452.80 | 13,000.00 | 11,817.00 | 10,000.00 | 9,090.00 | 6,500.00 | 5,908.50 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | | 0026 | 805-15-01200 | Reinforced Concrete Box Culverts (Precast) (6' x 6') | 120 | LNFT | 1,375.00 | 165,000.00 | 2,200.00 | 264,000.00 | 1,500.00 | 180,000.00 | 2,500.00 | 300,000.00 | | 0027 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 6' x 6' R.C.B. | 2 | EACH | 62,000.00 | 124,000.00 | 85,000.00 | 170,000.00 | 40,000.00 | 80,000.00 | 57,000.00 | 114,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 624,362.03 | | 656,549.00 | | 684,165.50 | | 728,805.14 |
|