Proposal:4400032585
Parish:De Soto
Description:LA 764: PIPE REPLACEMENT
Type Construction:
Estimated Construction Cost:$546,970.50
| Rank | License | Bidder | Construction Bid |
| 1 | 28218 | F. J. Burnell, Inc. | $437,208.50 |
| 2 | 40486 | REGIONAL CONSTRUCTION, LLC | $529,004.00 |
| 3 | 46716 | BRUDD CONSTRUCTION CO., LLC | $536,652.71 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - F. J. Burnell, Inc. | - 2 - REGIONAL CONSTRUCTION, LLC | - 3 - BRUDD CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.5 | LUMP | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 12,350.00 | 12,350.00 | | 0003 | 203-01-00100 | General Excavation | 537 | CUYD | 25.00 | 13,425.00 | 25.00 | 13,425.00 | 32.00 | 17,184.00 | | 0004 | 203-03-00100 | Embankment | 390 | CUYD | 25.00 | 9,750.00 | 40.00 | 15,600.00 | 65.00 | 25,350.00 | | 0005 | 204-02-00100 | Temporary Hay Bales | 18 | EACH | 20.00 | 360.00 | 200.00 | 3,600.00 | 46.00 | 828.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 857 | LNFT | 4.50 | 3,856.50 | 6.00 | 5,142.00 | 6.00 | 5,142.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 7 | CUYD | 150.00 | 1,050.00 | 200.00 | 1,400.00 | 265.00 | 1,855.00 | | 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 216 | SQYD | 225.00 | 48,600.00 | 300.00 | 64,800.00 | 290.00 | 62,640.00 | | 0009 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 214 | LNFT | 200.00 | 42,800.00 | 200.00 | 42,800.00 | 270.00 | 57,780.00 | | 0010 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 307 | LNFT | 1.00 | 307.00 | 50.00 | 15,350.00 | 45.00 | 13,815.00 | | 0011 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 14,000.00 | 14,000.00 | | 0012 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 97 | SQYD | 125.00 | 12,125.00 | 300.00 | 29,100.00 | 80.00 | 7,760.00 | | 0013 | 711-04-00100 | Geotextile Fabric | 97 | SQYD | 10.00 | 970.00 | 5.00 | 485.00 | 11.00 | 1,067.00 | | 0014 | 716-01-00100 | Mulch (Vegetative) | 0.7 | TON | 2,000.00 | 1,400.00 | 8,000.00 | 5,600.00 | 7,420.00 | 5,194.00 | | 0015 | 717-01-00100 | Seeding | 14 | LB | 50.00 | 700.00 | 25.00 | 350.00 | 14.00 | 196.00 | | 0016 | 718-01-00100 | Fertilizer | 466 | LB | 2.00 | 932.00 | 2.00 | 932.00 | 2.05 | 955.30 | | 0017 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 86 | SQYD | 3.00 | 258.00 | 10.00 | 860.00 | 5.60 | 481.60 | | 0018 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 251 | SQYD | 5.00 | 1,255.00 | 5.00 | 1,255.00 | 2.40 | 602.40 | | 0019 | 726-01-00100 | Bedding Material | 56.6 | CUYD | 200.00 | 11,320.00 | 200.00 | 11,320.00 | 57.00 | 3,226.20 | | 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 60,000.00 | 60,000.00 | 46,000.00 | 46,000.00 | | 0021 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 200.00 | 1,200.00 | 200.00 | 1,200.00 | 150.00 | 900.00 | | 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2 | EACH | 100.00 | 200.00 | 50.00 | 100.00 | 65.00 | 130.00 | | 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.061 | MILE | 100,000.00 | 6,100.00 | 25,000.00 | 1,525.00 | 11,151.00 | 680.21 | | 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 10,000.00 | 10,000.00 | 5,500.00 | 5,500.00 | | 0025 | 805-15-01200 | Reinforced Concrete Box Culverts (Precast) (6' x 6') | 176 | LNFT | 950.00 | 167,200.00 | 900.00 | 158,400.00 | 1,300.00 | 228,800.00 | | 0026 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 576 | INLF | 25.00 | 14,400.00 | 10.00 | 5,760.00 | 16.00 | 9,216.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 437,208.50 | | 529,004.00 | | 536,652.71 |
|