Proposal:4400034855
Parish:Acadia
Description:I-10 WB OFF-RAMP @ DUSON EXIT
Type Construction:PATCH, MILL, ASPHALT OVERLAY; PCCP PATCHING
Estimated Construction Cost:$586,365.74
| Rank | License | Bidder | Construction Bid |
| 1 | 76669 | Alonso LLC | $433,861.51 |
| 2 | 30774 | Progressive Construction Co., LLC | $662,166.59 |
| 3 | 75432 | House Transport Services, LLC | $665,097.35 |
| 4 | 33663 | Glenn Lege Construction LLC | $860,085.88 |
| 5 | 52306 | SIEMA CONSTRUCTION, LLC | $892,000.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Alonso LLC | - 2 - Progressive Construction Co., LLC | - 3 - House Transport Services, LLC | - 4 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 15.6 | SQYD | 60.00 | 936.00 | 159.00 | 2,480.40 | 63.00 | 982.80 | 135.52 | 2,114.11 | | 0002 | 302-03-00100 | Base Drain Outlet | 7 | EACH | 1,000.00 | 7,000.00 | 880.00 | 6,160.00 | 1,500.00 | 10,500.00 | 752.96 | 5,270.72 | | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 268 | CUYD | 80.00 | 21,440.00 | 179.00 | 47,972.00 | 63.00 | 16,884.00 | 114.04 | 30,562.72 | | 0004 | 502-01-00100 | Asphalt Concrete | 351.1 | TON | 140.00 | 49,154.00 | 343.75 | 120,690.63 | 275.00 | 96,552.50 | 202.25 | 71,009.98 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 1,991 | SQYD | 5.00 | 9,955.00 | 18.75 | 37,331.25 | 25.00 | 49,775.00 | 19.24 | 38,306.84 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -172 | CUYD | 0.01 | -1.72 | 0.01 | -1.72 | 18.00 | -3,096.00 | 0.01 | -1.72 | | 0007 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 435 | SQYD | 130.00 | 56,550.00 | 187.50 | 81,562.50 | 130.00 | 56,550.00 | 198.47 | 86,334.45 | | 0008 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 620 | LNFT | 6.00 | 3,720.00 | 6.60 | 4,092.00 | 9.00 | 5,580.00 | 12.84 | 7,960.80 | | 0009 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 238 | LNFT | 10.00 | 2,380.00 | 8.20 | 1,951.60 | 20.00 | 4,760.00 | 24.10 | 5,735.80 | | 0010 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 858 | LNFT | 4.00 | 3,432.00 | 3.00 | 2,574.00 | 6.00 | 5,148.00 | 7.26 | 6,229.08 | | 0011 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 100 | LNFT | 5.00 | 500.00 | 15.80 | 1,580.00 | 45.00 | 4,500.00 | 49.37 | 4,937.00 | | 0012 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 716 | LNFT | 5.00 | 3,580.00 | 6.00 | 4,296.00 | 10.00 | 7,160.00 | 14.63 | 10,475.08 | | 0013 | 602-03-00100 | Cleaning and Sealing Random Cracks | 50 | LNFT | 10.00 | 500.00 | 21.50 | 1,075.00 | 115.00 | 5,750.00 | 110.34 | 5,517.00 | | 0014 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 44 | SQYD | 320.00 | 14,080.00 | 400.00 | 17,600.00 | 400.00 | 17,600.00 | 401.02 | 17,644.88 | | 0015 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 459.8 | SQYD | 300.00 | 137,940.00 | 340.00 | 156,332.00 | 350.00 | 160,930.00 | 401.08 | 184,416.58 | | 0016 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 111.2 | SQYD | 280.00 | 31,136.00 | 300.00 | 33,360.00 | 275.00 | 30,580.00 | 401.25 | 44,619.00 | | 0017 | 602-10-00100 | Longitudinal Shoulder Joints | 1,654 | LNFT | 8.00 | 13,232.00 | 6.70 | 11,081.80 | 6.50 | 10,751.00 | 4.09 | 6,764.86 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | 150,401.63 | 150,401.63 | | 0019 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.455 | MILE | 4,095.00 | 1,863.23 | 25,000.00 | 11,375.00 | 4,650.00 | 2,115.75 | 23,230.00 | 10,569.65 | | 0020 | 713-11-00100 | Portable Changeable Message Signs | 1 | EACH | 2,500.00 | 2,500.00 | 5,150.00 | 5,150.00 | 15,000.00 | 15,000.00 | 3,787.50 | 3,787.50 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 65,000.00 | 65,000.00 | 75,000.00 | 75,000.00 | 84,082.50 | 84,082.50 | | 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 121 | EACH | 10.00 | 1,210.00 | 7.50 | 907.50 | 32.00 | 3,872.00 | 6.97 | 843.37 | | 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.391 | MILE | 13,000.00 | 5,083.00 | 7,250.00 | 2,834.75 | 6,500.00 | 2,541.50 | 6,736.70 | 2,634.05 | | 0024 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.064 | MILE | 15,000.00 | 960.00 | 18,125.00 | 1,160.00 | 9,000.00 | 576.00 | 16,841.75 | 1,077.87 | | 0025 | 732-05-00100 | Removal of Existing Markings | 0.339 | MILE | 8,000.00 | 2,712.00 | 10,625.00 | 3,601.88 | 3,200.00 | 1,084.80 | 9,872.75 | 3,346.86 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 7,000.00 | 7,000.00 | 44,000.00 | 44,000.00 | 75,445.27 | 75,445.27 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 433,861.51 | | 662,166.59 | | 665,097.35 | | 860,085.88 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | | 0001 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 15.6 | SQYD | 162.00 | 2,527.20 | | 0002 | 302-03-00100 | Base Drain Outlet | 7 | EACH | 1,100.00 | 7,700.00 | | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 268 | CUYD | 127.00 | 34,036.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 351.1 | TON | 357.00 | 125,342.70 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 1,991 | SQYD | 20.00 | 39,820.00 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -172 | CUYD | 0.01 | -1.72 | | 0007 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 435 | SQYD | 195.00 | 84,825.00 | | 0008 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 620 | LNFT | 8.00 | 4,960.00 | | 0009 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 238 | LNFT | 21.00 | 4,998.00 | | 0010 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 858 | LNFT | 1.75 | 1,501.50 | | 0011 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 100 | LNFT | 50.00 | 5,000.00 | | 0012 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 716 | LNFT | 10.00 | 7,160.00 | | 0013 | 602-03-00100 | Cleaning and Sealing Random Cracks | 50 | LNFT | 117.00 | 5,850.00 | | 0014 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 44 | SQYD | 840.00 | 36,960.00 | | 0015 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 459.8 | SQYD | 535.00 | 245,993.00 | | 0016 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 111.2 | SQYD | 534.00 | 59,380.80 | | 0017 | 602-10-00100 | Longitudinal Shoulder Joints | 1,654 | LNFT | 4.00 | 6,616.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 96,613.92 | 96,613.92 | | 0019 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.455 | MILE | 20,000.00 | 9,100.00 | | 0020 | 713-11-00100 | Portable Changeable Message Signs | 1 | EACH | 4,794.91 | 4,794.91 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 89,000.00 | 89,000.00 | | 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 121 | EACH | 20.00 | 2,420.00 | | 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.391 | MILE | 16,172.00 | 6,323.25 | | 0024 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.064 | MILE | 30,374.00 | 1,943.94 | | 0025 | 732-05-00100 | Removal of Existing Markings | 0.339 | MILE | 19,500.00 | 6,610.50 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,525.00 | 2,525.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 892,000.00 |
|