Search


Bid Tabulations for the Letting of 12/3/2025 in District 03 - Lafayette

Proposal:H.016621.6
Parish:St. Martin
Routes:LA 92-1
Description:LA 92-1: CROSS DRAIN REPLACEMENT
Type Construction:REMOVE AND REPLACE CROSS DRAIN
Estimated Construction Cost:$849,443.76
Rank License BidderConstruction Bid
167770Reliant Industrial Solutions L.L.C.$645,592.36
246716BRUDD CONSTRUCTION CO., LLC$721,047.41
333663Glenn Lege Construction LLC$803,413.18


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Reliant Industrial Solutions L.L.C.
- 2 -
BRUDD CONSTRUCTION CO., LLC
- 3 -
Glenn Lege Construction LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 0.475 LUMP10,000.0010,000.009,000.009,000.0032,825.0032,825.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP13,000.0013,000.007,374.007,374.0021,664.5021,664.50
0003203-02-00100Drainage Excavation 49     CUYD40.001,960.0050.572,477.93111.085,442.92
0004203-05-00100Excavation and Embankment 1     LUMP60,000.0060,000.0040,000.0040,000.0026,916.5026,916.50
0005204-05-00100Temporary Sediment Check Dams (Hay) 18     EACH165.002,970.00177.003,186.00174.233,136.14
0006204-06-00100Temporary Silt Fencing 1,000     LNFT2.202,200.002.362,360.002.322,320.00
0007502-01-00100Asphalt Concrete 141.6   TON275.0038,940.00280.0039,648.00312.4944,248.58
0008502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 7     TON385.002,695.00413.002,891.00370.272,591.89
0009509-01-00100Milling Asphalt Pavement 1,331     SQYD11.0014,641.0011.8015,705.807.5510,049.05
0010509-02-00100Contractor Retained Reclaimed Asphalt Pavement -74     CUYD0.01-0.740.01-0.740.01-0.74
0011510-01-00200Pavement Patching (12" Minimum Thickness) 900     SQYD154.00138,600.00124.00111,600.00120.35108,315.00
0012701-03-01042Storm Drain Pipe (24" RCP/RPVCP) 188     LNFT100.0018,800.00185.0034,780.00152.5628,681.28
0013701-04-01040Storm Drain Pipe Arch (24" Equiv. RCPA) 96     LNFT134.0012,864.00184.0017,664.00141.2413,559.04
0014701-15-00100Concrete Collar 1     EACH1,200.001,200.001,585.001,585.001,247.351,247.35
0015701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 70     LNFT27.501,925.0033.712,359.70203.5214,246.40
0016702-03-00100Catch Basins (CB-01) 1     EACH8,000.008,000.009,761.009,761.003,545.103,545.10
0017702-08-00100Side Drain Safety End (Type 1) 2     EACH5,700.0011,400.005,235.0010,470.003,479.456,958.90
0018702-08-00200Side Drain Safety End (Type 2) 1     EACH7,600.007,600.0011,810.0011,810.009,913.159,913.15
0019710-01-00100Flowable Fill 165     CUYD210.0034,650.00174.0028,710.00186.4530,764.25
0020711-01-04020Riprap (55 lb, 24" Thick) 70     SQYD234.0016,380.00112.427,869.40111.617,812.70
0021711-04-00100Geotextile Fabric 70     SQYD13.00910.0022.281,559.6011.82827.40
0022713-01-00100Temporary Signs and Barricades 1     LUMP23,000.0023,000.0033,567.0033,567.0074,701.8274,701.82
0023713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 0.182 MILE3,000.00546.001,180.00214.761,313.00238.97
0024713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 0.182 MILE1,100.00200.201,180.00214.761,161.50211.39
0025713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 0.546 MILE1,650.00900.901,770.00966.421,742.25951.27
0026724-01-00100Rumble Strips (Centerline) 0.09  MILE550.0049.501,770.00159.301,742.25156.80
0027724-02-00100Rumble Strips (Shoulder/Edge) 0.18  MILE550.0099.001,770.00318.601,742.25313.61
0028726-01-00100Bedding Material 86.2   CUYD176.5015,214.30170.0014,654.00131.3011,318.06
0029727-01-00100Mobilization 1     LUMP50,000.0050,000.0083,000.0083,000.00146,399.50146,399.50
0030729-16-00300Object Marker Assembly (Type 3) 4     EACH100.00400.00118.00472.00196.95787.80
0031731-02-00100Reflectorized Raised Pavement Markers 12     EACH27.50330.0029.50354.0029.04348.48
0032732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.273 MILE9,350.002,552.5510,030.002,738.199,872.752,695.26
0033732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.091 MILE7,150.00650.657,670.00697.977,549.75687.03
0034739-01-00100Hydro-Seeding 1     ACRE2,915.002,915.003,127.003,127.003,077.983,077.98
0035740-01-00100Construction Layout 1     LUMP10,000.0010,000.008,554.128,554.1219,695.0019,695.00
0036805-15-00700Reinforced Concrete Box Culverts (Precast) (6' x 5') 70     LNFT1,300.0091,000.001,631.98114,238.601,473.96103,177.20
0037805-17-00100Reinforced Concrete Box Culvert Headwall Deformed Reinforcing Steel: 1346.92 LB Class AI Concrete: 19.43 CUYD2     EACH24,500.0049,000.0048,480.0096,960.0031,794.3063,588.60
           
  CONTRACTOR TOTAL   645,592.36 721,047.41 803,413.18