Search


Bid Tabulations for the Letting of 9/4/2024 in District 03 - Lafayette

Proposal:H.972472.6
Parish:Acadia
Description:ACADIA PARISH PE OFFICE HVAC REPLACE
Type Construction:Replace HVAC in Acadia Parish PE office
Estimated Construction Cost:$176,999.00
Rank License BidderConstruction Bid
170241Red Ox Construction, LLC$278,500.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Red Ox Construction, LLC
Unit PriceTotal
Amount
0001TS-821-00201Building Heating, Ventilating, and Air Conditioning 1     LUMP82,265.0082,265.00
0002TS-822-00002Building Electrical 1     LUMP57,528.0057,528.00
0003TS-823-03000Building (Interior Damage)1     LUMP138,707.00138,707.00
       
  CONTRACTOR TOTAL   278,500.00