Proposal:H.016803
Parish:Terrebonne
Description:LA 311: LAFAYETTE CT - US 90
Type Construction:
Estimated Construction Cost:$210,454.90
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $316,350.74 |
| 2 | 62139 | Huey P. Stockstill, LLC | $328,121.10 |
| 3 | 74077 | TLP Construction Co. LLC | $385,056.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Huey P. Stockstill, LLC | - 3 - TLP Construction Co. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 160 | SQYD | 173.00 | 27,680.00 | 220.00 | 35,200.00 | 350.00 | 56,000.00 | | 0002 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 22,000.00 | 22,000.00 | 30,585.00 | 30,585.00 | 15,000.00 | 15,000.00 | | 0003 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.074 | MILE | 7,400.00 | 547.60 | 200.00 | 14.80 | 1,750.00 | 129.50 | | 0004 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.129 | MILE | 1,500.00 | 193.50 | 1,500.00 | 193.50 | 1,750.00 | 225.75 | | 0005 | 727-01-00100 | Mobilization | 1 | LUMP | 22,000.00 | 22,000.00 | 8,600.00 | 8,600.00 | 12,500.00 | 12,500.00 | | 0006 | 731-02-00100 | Reflectorized Raised Pavement Markers | 22 | EACH | 10.00 | 220.00 | 13.00 | 286.00 | 13.00 | 286.00 | | 0007 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.064 | MILE | 30,000.00 | 1,920.00 | 35,000.00 | 2,240.00 | 37,000.00 | 2,368.00 | | 0008 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.037 | MILE | 15,000.00 | 555.00 | 15,500.00 | 573.50 | 17,900.00 | 662.30 | | 0009 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,000.00 | 22,000.00 | 8,500.00 | 8,500.00 | 5,000.00 | 5,000.00 | | 0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 353 | SQYD | 173.00 | 61,069.00 | 220.00 | 77,660.00 | 350.00 | 123,550.00 | | 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 22,000.00 | 22,000.00 | 5,575.00 | 5,575.00 | 15,000.00 | 15,000.00 | | 0012 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.28 | MILE | 1,500.00 | 420.00 | 1,500.00 | 420.00 | 1,750.00 | 490.00 | | 0013 | 727-01-00100 | Mobilization | 1 | LUMP | 9,000.00 | 9,000.00 | 9,800.00 | 9,800.00 | 12,500.00 | 12,500.00 | | 0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.14 | MILE | 30,000.00 | 4,200.00 | 35,000.00 | 4,900.00 | 35,000.00 | 4,900.00 | | 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,000.00 | 22,000.00 | 500.00 | 500.00 | 3,000.00 | 3,000.00 | | 0016 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" RCP | 52 | LNFT | 65.00 | 3,380.00 | 60.00 | 3,120.00 | 50.00 | 2,600.00 | | 0017 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 4,850.00 | 4,850.00 | 2,850.00 | 2,850.00 | 2,500.00 | 2,500.00 | | 0018 | 203-08-00100 | Geotextile Fabric | 22.21 | SQYD | 4.00 | 88.84 | 80.00 | 1,776.80 | 70.00 | 1,554.70 | | 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 63 | SQYD | 173.00 | 10,899.00 | 220.00 | 13,860.00 | 600.00 | 37,800.00 | | 0020 | 701-01-00900 | Cross Drain Pipe (18" RCP) | 52 | LNFT | 375.00 | 19,500.00 | 450.00 | 23,400.00 | 350.00 | 18,200.00 | | 0021 | 701-15-00100 | Concrete Collar | 3 | EACH | 2,800.00 | 8,400.00 | 6,000.00 | 18,000.00 | 5,000.00 | 15,000.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 52 | LNFT | 185.00 | 9,620.00 | 100.00 | 5,200.00 | 100.00 | 5,200.00 | | 0023 | 711-02-00200 | Riprap (10 lb) | 14.8 | CUYD | 340.00 | 5,032.00 | 350.00 | 5,180.00 | 285.00 | 4,218.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 11,000.00 | 11,000.00 | 36,225.00 | 36,225.00 | 15,000.00 | 15,000.00 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.041 | MILE | 3,000.00 | 123.00 | 1,500.00 | 61.50 | 1,750.00 | 71.75 | | 0026 | 726-01-00100 | Bedding Material | 18.4 | CUYD | 242.00 | 4,452.80 | 525.00 | 9,660.00 | 400.00 | 7,360.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 11,000.00 | 11,000.00 | 14,000.00 | 14,000.00 | 12,500.00 | 12,500.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 8 | EACH | 25.00 | 200.00 | 30.00 | 240.00 | 30.00 | 240.00 | | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.02 | MILE | 50,000.00 | 1,000.00 | 50,000.00 | 1,000.00 | 60,000.00 | 1,200.00 | | 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,000.00 | 11,000.00 | 8,500.00 | 8,500.00 | 10,000.00 | 10,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 316,350.74 | | 328,121.10 | | 385,056.00 |
|