Proposal:H.016745
Parish:Jefferson, Orleans, Plaquemines, St. Bernard, St. Charles
Description:DIST. 02 DISTRICTWIDE LOOP DETECTION REPAIRS
Type Construction:Install loop detection equipment
Estimated Construction Cost:$74,821.15
| Rank | License | Bidder | Construction Bid |
| 1 | 05473 | Jack B. Harper Electrical LLC | $69,910.02 |
| 2 | 08470 | Diamond Electrical Co., Inc. | $100,761.60 |
| 3 | 00448 | WALTER J. BARNES ELECTRIC CO., INC. | $103,679.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Jack B. Harper Electrical LLC | - 2 - Diamond Electrical Co., Inc. | - 3 - WALTER J. BARNES ELECTRIC CO., INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 713-01-00100 | Temporary Signs and Barricades (C.S. 005-08) | 1 | LUMP | 1,268.80 | 1,268.80 | 1,346.00 | 1,346.00 | 1,500.00 | 1,500.00 | | 0002 | 713-01-00100 | Temporary Signs and Barricades (C.S. 007-02) | 1 | LUMP | 1,268.80 | 1,268.80 | 2,410.00 | 2,410.00 | 1,500.00 | 1,500.00 | | 0003 | 713-01-00100 | Temporary Signs and Barricades (C.S. 046-03) | 1 | LUMP | 1,268.80 | 1,268.80 | 1,346.00 | 1,346.00 | 1,500.00 | 1,500.00 | | 0004 | 713-01-00100 | Temporary Signs and Barricades (C.S. 062-02) | 1 | LUMP | 1,268.80 | 1,268.80 | 1,346.00 | 1,346.00 | 1,500.00 | 1,500.00 | | 0005 | 713-01-00100 | Temporary Signs and Barricades (C.S. 283-08) | 1 | LUMP | 1,268.80 | 1,268.80 | 1,346.00 | 1,346.00 | 1,500.00 | 1,500.00 | | 0006 | 727-01-00100 | Mobilization (C.S. 005-08) | 1 | LUMP | 2,519.80 | 2,519.80 | 5,241.00 | 5,241.00 | 2,300.00 | 2,300.00 | | 0007 | 727-01-00100 | Mobilization (C.S. 007-02) | 1 | LUMP | 2,519.80 | 2,519.80 | 5,241.00 | 5,241.00 | 2,300.00 | 2,300.00 | | 0008 | 727-01-00100 | Mobilization (C.S. 046-03) | 1 | LUMP | 2,519.80 | 2,519.80 | 5,241.00 | 5,241.00 | 2,300.00 | 2,300.00 | | 0009 | 727-01-00100 | Mobilization (C.S. 062-02) | 1 | LUMP | 2,519.80 | 2,519.80 | 5,241.00 | 5,241.00 | 2,300.00 | 2,300.00 | | 0010 | 727-01-00100 | Mobilization (C.S. 283-08) | 1 | LUMP | 2,519.80 | 2,519.80 | 5,241.00 | 5,241.00 | 2,300.00 | 2,300.00 | | 0011 | 736-09-00100 | Loop Detector (C.S. 005-08) | 130 | LNFT | 29.60 | 3,848.00 | 37.24 | 4,841.20 | 49.50 | 6,435.00 | | 0012 | 736-09-00100 | Loop Detector (C.S. 007-02) | 420 | LNFT | 29.60 | 12,432.00 | 37.24 | 15,640.80 | 49.50 | 20,790.00 | | 0013 | 736-09-00100 | Loop Detector (C.S. 046-03) | 140 | LNFT | 29.60 | 4,144.00 | 37.24 | 5,213.60 | 49.50 | 6,930.00 | | 0014 | 736-09-00100 | Loop Detector (C.S. 046-32) | 175 | LNFT | 29.60 | 5,180.00 | 37.24 | 6,517.00 | 49.50 | 8,662.50 | | 0015 | 736-09-00100 | Loop Detector (C.S. 062-02) | 155 | LNFT | 29.60 | 4,588.00 | 37.24 | 5,772.20 | 49.50 | 7,672.50 | | 0016 | 736-09-00100 | Loop Detector (C.S. 283-08) | 295 | LNFT | 29.60 | 8,732.00 | 37.24 | 10,985.80 | 49.50 | 14,602.50 | | 0017 | 736-10-00300 | Underground Junction Box (Type F) (C.S. 005-08) | 1 | EACH | 1,634.38 | 1,634.38 | 2,592.00 | 2,592.00 | 4,250.00 | 4,250.00 | | 0018 | 736-10-00300 | Underground Junction Box (Type F) (C.S. 046-03) | 1 | EACH | 1,634.38 | 1,634.38 | 2,592.00 | 2,592.00 | 4,250.00 | 4,250.00 | | 0019 | 736-10-00300 | Underground Junction Box (Type F) (C.S. 046-32) | 2 | EACH | 1,634.38 | 3,268.76 | 2,592.00 | 5,184.00 | 4,250.00 | 8,500.00 | | 0020 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) (C.S. 005-08) | 5 | LNFT | 496.50 | 2,482.50 | 16.00 | 80.00 | 14.31 | 71.55 | | 0021 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) (C.S. 007-02) | 15 | LNFT | 10.74 | 161.10 | 16.00 | 240.00 | 14.31 | 214.65 | | 0022 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) (C.S. 046-03) | 5 | LNFT | 10.74 | 53.70 | 16.00 | 80.00 | 14.31 | 71.55 | | 0023 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) (C.S. 046-32) | 10 | LNFT | 10.74 | 107.40 | 16.00 | 160.00 | 14.31 | 143.10 | | 0024 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) (C.S. 062-02) | 10 | LNFT | 10.74 | 107.40 | 16.00 | 160.00 | 14.31 | 143.10 | | 0025 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) (C.S. 283-08) | 10 | LNFT | 10.74 | 107.40 | 16.00 | 160.00 | 14.31 | 143.10 | | 0026 | 740-01-00100 | Construction Layout (C.S. 005-08) | 1 | LUMP | 496.50 | 496.50 | 1,096.00 | 1,096.00 | 360.00 | 360.00 | | 0027 | 740-01-00100 | Construction Layout (C.S. 007-02) | 1 | LUMP | 496.50 | 496.50 | 2,160.00 | 2,160.00 | 360.00 | 360.00 | | 0028 | 740-01-00100 | Construction Layout (C.S. 046-03) | 1 | LUMP | 496.50 | 496.50 | 1,096.00 | 1,096.00 | 360.00 | 360.00 | | 0029 | 740-01-00100 | Construction Layout (C.S. 062-02) | 1 | LUMP | 496.50 | 496.50 | 1,096.00 | 1,096.00 | 360.00 | 360.00 | | 0030 | 740-01-00100 | Construction Layout (C.S. 283-08) | 1 | LUMP | 500.00 | 500.00 | 1,096.00 | 1,096.00 | 360.00 | 360.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 69,910.02 | | 100,761.60 | | 103,679.55 |
|