Proposal:H.015751
Parish:Lafourche
Description:LA 1 CULVERT REPAIR AT LOG MILE 2.344
Type Construction:Pipe replacement
Estimated Construction Cost:$85,790.00
| Rank | License | Bidder | Construction Bid |
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $68,205.80 |
| 2 | 68424 | Procivil Construction, LLC | $84,040.00 |
| 3 | 34263 | La Contracting Enterprise LLC | $119,624.00 |
| 4 | 70108 | LMB Services, LLC | $222,111.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Byron E. Talbot Contractor, Inc. | - 2 - Procivil Construction, LLC | - 3 - La Contracting Enterprise LLC | - 4 - LMB Services, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" Cross drain pipe | 98 | LNFT | 65.00 | 6,370.00 | 100.00 | 9,800.00 | 175.00 | 17,150.00 | 300.00 | 29,400.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 14 | CUYD | 100.00 | 1,400.00 | 40.00 | 560.00 | 50.00 | 700.00 | 300.00 | 4,200.00 | | 0003 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 39 | SQYD | 275.00 | 10,725.00 | 400.00 | 15,600.00 | 1,000.00 | 39,000.00 | 615.00 | 23,985.00 | | 0004 | 701-01-00900 | Cross Drain Pipe (18" RCP) | 104 | LNFT | 210.00 | 21,840.00 | 200.00 | 20,800.00 | 275.00 | 28,600.00 | 500.00 | 52,000.00 | | 0005 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 104 | LNFT | 5.00 | 520.00 | 5.00 | 520.00 | 1.00 | 104.00 | 300.00 | 31,200.00 | | 0006 | 710-01-00100 | Flowable Fill | 10 | CUYD | 225.00 | 2,250.00 | 200.00 | 2,000.00 | 100.00 | 1,000.00 | 300.00 | 3,000.00 | | 0007 | 711-02-00400 | Riprap (55 lb) | 10 | CUYD | 400.00 | 4,000.00 | 300.00 | 3,000.00 | 400.00 | 4,000.00 | 150.00 | 1,500.00 | | 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,500.00 | 7,500.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 21,413.50 | 21,413.50 | | 0009 | 717-01-00100 | Seeding | 1 | LB | 35.00 | 35.00 | 750.00 | 750.00 | 280.00 | 280.00 | 800.00 | 800.00 | | 0010 | 718-01-00100 | Fertilizer | 8 | LB | 15.00 | 120.00 | 75.00 | 600.00 | 50.00 | 400.00 | 200.00 | 1,600.00 | | 0011 | 726-01-00100 | Bedding Material | 19.3 | CUYD | 156.00 | 3,010.80 | 200.00 | 3,860.00 | 300.00 | 5,790.00 | 125.00 | 2,412.50 | | 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 7,000.00 | 7,000.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | 22,000.00 | 22,000.00 | | 0013 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1 | EACH | 35.00 | 35.00 | 750.00 | 750.00 | 200.00 | 200.00 | 200.00 | 200.00 | | 0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.004 | MILE | 475,000.00 | 1,900.00 | 200,000.00 | 800.00 | 100,000.00 | 400.00 | 1,600,000.00 | 6,400.00 | | 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | 22,000.00 | 22,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 68,205.80 | | 84,040.00 | | 119,624.00 | | 222,111.00 |
|