Proposal:H.014587.6-R1
Parish:Jefferson
Routes:LA 302
Description:LA 302: KERNER FERRY BRIDGE REPAIRS PH 2
Type Construction:Emergency Repairs to The LA 302 Bridge Over Bayou Barataria
Estimated Construction Cost:$2,039,896.00
| Rank | License | Bidder | Construction Bid |
| 1 | 26435 | C.E.C., Inc. | $1,723,040.00 |
| 2 | 00009 | Coastal Contractors, Inc. | $2,136,160.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - C.E.C., Inc. | - 2 - Coastal Contractors, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-12300 | Removal of Fender System | 1 | EACH | 18,000.00 | 18,000.00 | 48,000.00 | 48,000.00 | | 0002 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,620.00 | 10,620.00 | 29,000.00 | 29,000.00 | | 0003 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 3,630.00 | 7,260.00 | 12,000.00 | 24,000.00 | | 0004 | 727-01-00100 | Mobilization | 1 | LUMP | 125,000.00 | 125,000.00 | 215,000.00 | 215,000.00 | | 0005 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,360.00 | 12,360.00 | 21,000.00 | 21,000.00 | | 0006 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 2,520 | LNFT | 60.00 | 151,200.00 | 78.00 | 196,560.00 | | 0007 | 807-02-00100 | Structural Metalwork (Anchor Bolts) ANCHOR BOLTS | 389 | LUMP | 9,240.00 | 9,240.00 | 6,600.00 | 6,600.00 | | 0008 | 812-01-00200 | Treated Timber (Coastal Treatment) | 60 | MFBM | 3,000.00 | 180,000.00 | 2,540.00 | 152,400.00 | | 0009 | 822-09-00100 | Electrical System DISCONNECT AND RECONNECT MAIN DRIVE MOTOR | 1 | LUMP | 1,200.00 | 1,200.00 | 9,600.00 | 9,600.00 | | 0010 | 822-09-00100 | Electrical System INSPECT AND VERIFICATION OF SUBMARINE CABLES | 1 | LUMP | 1,800.00 | 1,800.00 | 3,300.00 | 3,300.00 | | 0011 | 822-09-00100 | Electrical System INSPECTION AND VERIFICATION OF CONTROL SYSTEM | 1 | LUMP | 2,400.00 | 2,400.00 | 11,900.00 | 11,900.00 | | 0012 | 822-09-00100 | Electrical System REINDEX FULLY CLOSED LIMIT SWITCH | 1 | LUMP | 1,200.00 | 1,200.00 | 1,700.00 | 1,700.00 | | 0013 | 822-09-00100 | Electrical System RELOCATE SOUTHERN EAST FENDER NAVIGATION LIGHT | 1 | LUMP | 1,800.00 | 1,800.00 | 1,100.00 | 1,100.00 | | 0014 | 822-09-00100 | Electrical System REPAIR EAST WEDGE DRIVEN LIMIT SWITCH TRIP PLATE | 1 | LUMP | 1,200.00 | 1,200.00 | 2,000.00 | 2,000.00 | | 0015 | 822-09-00100 | Electrical System REPLACE FENDER NAVIGATION LIGHT CABLE | 1 | LUMP | 2,400.00 | 2,400.00 | 6,600.00 | 6,600.00 | | 0016 | 822-09-00100 | Electrical System REPLACE FLEXIBLE LOOP CABLES | 1 | LUMP | 3,000.00 | 3,000.00 | 4,600.00 | 4,600.00 | | 0017 | 822-09-00100 | Electrical System REPLACE FULLY OPEN LIMIT SWITCH MOUNTING BRACKET | 1 | LUMP | 1,800.00 | 1,800.00 | 2,000.00 | 2,000.00 | | 0018 | 822-09-00100 | Electrical System REPLACE NEARLY CLOSED LIMIT SWITCH | 1 | LUMP | 5,400.00 | 5,400.00 | 4,800.00 | 4,800.00 | | 0019 | 822-09-00100 | Electrical System REPLACE NEARLY OPEN LIMIT SWITCH | 1 | LUMP | 5,400.00 | 5,400.00 | 4,800.00 | 4,800.00 | | 0020 | 822-09-00100 | Electrical System REPLACE PIER JUNCTION BOX | 1 | LUMP | 16,560.00 | 16,560.00 | 21,000.00 | 21,000.00 | | 0021 | 822-09-00100 | Electrical System REPLACE SOUTHERN WEST FENDER NAVIGATION LIGHT | 1 | LUMP | 4,200.00 | 4,200.00 | 2,400.00 | 2,400.00 | | 0022 | 830-01-00100 | Bridge Superstructure Repair MACHINERY SUPPORT BEAMS | 7 | EACH | 10,000.00 | 70,000.00 | 23,000.00 | 161,000.00 | | 0023 | 830-01-00100 | Bridge Superstructure Repair PIVOT FLOORBEAM REPAIRS | 2 | EACH | 48,000.00 | 96,000.00 | 265,000.00 | 530,000.00 | | 0024 | 830-01-00100 | Bridge Superstructure Repair STRINGER REPAIRS | 22 | EACH | 5,000.00 | 110,000.00 | 1,000.00 | 22,000.00 | | 0025 | 830-01-00100 | Bridge Superstructure Repair TREATED TIMBER DECK REPAIR | 1 | EACH | 18,000.00 | 18,000.00 | 10,000.00 | 10,000.00 | | 0026 | 830-02-00100 | Bridge Substructure Repair PIVOT PIER CONCRETE REPAIR | 1 | EACH | 30,000.00 | 30,000.00 | 31,000.00 | 31,000.00 | | 0027 | TS-821-01100 | Swing Span Bridge Machinery BALANCE WHEEL REPAIRS | 1 | LUMP | 160,000.00 | 160,000.00 | 134,000.00 | 134,000.00 | | 0028 | TS-821-01100 | Swing Span Bridge Machinery CENTER LIVE LOAD BEARING REPAIRS | 1 | LUMP | 75,000.00 | 75,000.00 | 32,600.00 | 32,600.00 | | 0029 | TS-821-01100 | Swing Span Bridge Machinery CENTER PIVOT BEARING REPAIRS | 1 | LUMP | 60,000.00 | 60,000.00 | 55,200.00 | 55,200.00 | | 0030 | TS-821-01100 | Swing Span Bridge Machinery END WEDGE INSPECTION | 1 | LUMP | 15,000.00 | 15,000.00 | 34,600.00 | 34,600.00 | | 0031 | TS-821-01100 | Swing Span Bridge Machinery SPAN BALANCE AND TESTING | 1 | LUMP | 22,000.00 | 22,000.00 | 45,900.00 | 45,900.00 | | 0032 | TS-821-01100 | Swing Span Bridge Machinery SPAN BRAKE REPLACEMENT | 1 | LUMP | 55,000.00 | 55,000.00 | 30,500.00 | 30,500.00 | | 0033 | TS-821-01100 | Swing Span Bridge Machinery SPAN DRIVE MACHINERY REPAIRS | 1 | LUMP | 450,000.00 | 450,000.00 | 281,000.00 | 281,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,723,040.00 | | 2,136,160.00 |
|