Proposal:H.014290.6
Parish:Lafourche
Routes:LA 182
Description:LA 182: HOLLYWOOD CANAL BRIDGE REPAIR
Type Construction:MILLING AND OVERLAY OF ASPHALT CONCRETE, ASPHALT CONCRETE EMBANKMENT WIDENING AND PATCHING, FLOWABLE FILL, RIP-RAP, EMBANKMENT, AND CONCRETE SACKED REVETMENT
Estimated Construction Cost:$163,385.15
| Rank | License | Bidder | Construction Bid |
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $261,421.95 |
| 2 | 28190 | Bucktown Contractors & Co. | $329,217.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Byron E. Talbot Contractor, Inc. | - 2 - Bucktown Contractors & Co. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.4 | LUMP | 10,500.00 | 10,500.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 181.7 | SQYD | 19.00 | 3,452.30 | 10.00 | 1,817.00 | | 0003 | 203-01-00100 | General Excavation | 100 | CUYD | 35.00 | 3,500.00 | 35.00 | 3,500.00 | | 0004 | 203-04-00100 | Nonplastic Embankment | 143 | CUYD | 61.50 | 8,794.50 | 30.00 | 4,290.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 69 | TON | 280.00 | 19,320.00 | 396.00 | 27,324.00 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 43.2 | TON | 385.00 | 16,632.00 | 395.00 | 17,064.00 | | 0007 | 509-01-00100 | Milling Asphalt Pavement | 628 | SQYD | 15.50 | 9,734.00 | 17.00 | 10,676.00 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -35 | CUYD | 1.00 | -35.00 | 1.00 | -35.00 | | 0009 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 42 | SQYD | 450.00 | 18,900.00 | 340.00 | 14,280.00 | | 0010 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 133.33 | CUYD | 255.00 | 33,999.15 | 230.00 | 30,665.90 | | 0011 | 711-03-00300 | Riprap (30 lb) | 341 | TON | 120.00 | 40,920.00 | 95.00 | 32,395.00 | | 0012 | 712-02-00200 | Sacked Concrete Revetment (Wet batched) | 80 | SQYD | 520.00 | 41,600.00 | 80.00 | 6,400.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,000.00 | 7,000.00 | 7,500.00 | 7,500.00 | | 0014 | 717-01-00100 | Seeding | 3 | LB | 325.00 | 975.00 | 325.00 | 975.00 | | 0015 | 718-01-00100 | Fertilizer | 138 | LB | 9.00 | 1,242.00 | 8.00 | 1,104.00 | | 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 139,000.00 | 139,000.00 | | 0017 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.176 | MILE | 10,500.00 | 1,848.00 | 13,000.00 | 2,288.00 | | 0018 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | | 0019 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 510 | LNFT | 10.00 | 5,100.00 | 12.00 | 6,120.00 | | 0020 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 56 | LNFT | 10.00 | 560.00 | 12.00 | 672.00 | | 0021 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 566 | LNFT | 8.00 | 4,528.00 | 5.00 | 2,830.00 | | 0022 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 176 | INLF | 2.00 | 352.00 | 2.00 | 352.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 261,421.95 | | 329,217.90 |
|