Bid Tabulations
Letting of
10/09/2013
LA DOTD Headquarters
| Lead Project: H.010731.6 | |
| Parish: Lafourche | |
| Routes: LA 1 | |
| Description: LA 1: JEFFERSON/LAFOURCHE LINE - LA 3090 | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK | |
| Estimated Construction Cost: $2,079,522.35 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,541,137.80 |
| 2 | 06487 | Huey Stockstill, Inc. | $1,689,118.18 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Huey Stockstill, Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 203-01-00100 | General Excavation | 20 | CUYD | 20.00 | 400.00 | 66.00 | 1,320.00 |
| 0002 | 203-04-00300 | Nonplastic Embankment (Stone) | 2,300 | CUYD | 80.00 | 184,000.00 | 86.50 | 198,950.00 |
| 0003 | 502-01-00100 | Superpave Asphaltic Concrete | 10,924 | TON | 78.00 | 852,072.00 | 94.90 | 1,036,687.60 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 25,062.4 | SQYD | 0.05 | 1,253.12 | 1.00 | 25,062.40 |
| 0005 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 80.00 | 20,000.00 | 133.00 | 33,250.00 |
| 0006 | 711-02-00400 | Riprap (55 lb) | 2,500 | CUYD | 95.00 | 237,500.00 | 112.00 | 280,000.00 |
| 0007 | 711-04-00100 | Geotextile Fabric | 1,000 | SQYD | 0.25 | 250.00 | 1.15 | 1,150.00 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 77,500.00 | 77,500.00 | 5,000.00 | 5,000.00 |
| 0009 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.238 | MILE | 40.00 | 249.52 | 50.00 | 311.90 |
| 0010 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.238 | MILE | 0.05 | 0.31 | 10.00 | 62.38 |
| 0011 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 13 | MILE | 0.05 | 0.65 | 30.00 | 390.00 |
| 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 39,000.00 | 39,000.00 |
| 0013 | 731-02-00100 | Reflectorized Raised Pavement Markers | 825 | EACH | 5.00 | 4,125.00 | 5.50 | 4,537.50 |
| 0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13 | MILE | 2,400.00 | 31,200.00 | 2,600.00 | 33,800.00 |
| 0015 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.238 | MILE | 900.00 | 5,614.20 | 900.00 | 5,614.20 |
| 0016 | 732-05-00100 | Removal of Existing Markings | 4.618 | MILE | 3,000.00 | 13,854.00 | 3,300.00 | 15,239.40 |
| 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 |
| 0018 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 6.238 | MILE | 500.00 | 3,119.00 | 600.00 | 3,742.80 |
| CONTRACTOR TOTAL | 1,541,137.80 | 1,689,118.18 | ||||||