LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.010675.6
Parish: Bossier, Webster
Routes: I-20
Description: Dist. 04: I-20 Cable Barrier Median
Type Const: CABLE BARRIER SYSTEM, CONCRETE STRIP, AND RELATED WORK
Estimated Construction Cost: $4,599,475.73


RankLicenseBidderConstruction Bid
1 12135 Blount Bros. Construction, LLC $4,628,223.80
2 43371 Rmd Holdings LTD $4,741,410.76
3 58526 Collins & Hermann, Inc. $5,939,645.33
4 35849 T.L. Construction LLC $6,805,257.00


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Blount Bros. Construction, LLC
- 2 -
Rmd Holdings LTD
- 3 -
Collins & Hermann, Inc.
- 4 -
T.L. Construction LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 10,000.00 10,000.00 34,125.76 34,125.76 50,756.45 50,756.45 65,000.00 65,000.00
0002 202-02-06100 Removal of Concrete Walks and Drives 234      SQYD 10.00 2,340.00 11.36 2,658.24 20.30 4,750.20 25.00 5,850.00
0003 203-07-00100 Borrow (Vehicular Measurement) 90,000      CUYD 12.00 1,080,000.00 3.42 307,800.00 18.27 1,644,300.00 23.50 2,115,000.00
0004 204-02-00100 Temporary Hay or Straw Bales 200      EACH 15.00 3,000.00 19.97 3,994.00 17.84 3,568.00 25.00 5,000.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 50      EACH 250.00 12,500.00 158.22 7,911.00 141.46 7,073.00 175.00 8,750.00
0006 204-06-00100 Temporary Silt Fencing 22,000      LNFT 2.00 44,000.00 1.66 36,520.00 1.69 37,180.00 2.00 44,000.00
0007 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 230      CUYD 55.00 12,650.00 34.09 7,840.70 50.76 11,674.80 125.00 28,750.00
0008 702-04-00200 Adjusting Catch Basins 23      EACH 2,500.00 57,500.00 1,704.55 39,204.65 2,467.78 56,758.94 1,500.00 34,500.00
0009 706-03-00300 Incidental Concrete Paving (6" Thick) 299      SQYD 50.00 14,950.00 56.82 16,989.18 71.06 21,246.94 125.00 37,375.00
0010 713-01-00100 Temporary Signs and Barricades 1      LUMP 120,000.00 120,000.00 131,704.55 131,704.55 241,846.31 241,846.31 400,000.00 400,000.00
0011 716-01-00100 Mulch (Vegetative) 266      TON 700.00 186,200.00 572.73 152,346.18 581.38 154,647.08 670.00 178,220.00
0012 717-01-00100 Seeding 5,320      LB 8.00 42,560.00 9.89 52,614.80 10.02 53,306.40 12.00 63,840.00
0013 718-01-00100 Fertilizer 28,105      LB 1.00 28,105.00 2.50 70,262.50 0.42 11,804.10 1.00 28,105.00
0014 727-01-00100 Mobilization 1      LUMP 150,000.00 150,000.00 397,727.27 397,727.27 205,251.90 205,251.90 400,000.00 400,000.00
0015 740-01-00100 Construction Layout 1      LUMP 15,000.00 15,000.00 37,500.00 37,500.00 50,756.45 50,756.45 50,000.00 50,000.00
0016 NS-704-00001 High Tension Cable Barrier 132,871      LNFT 8.00 1,062,968.00 9.28 1,233,042.88 12.48 1,658,230.08 8.50 1,129,403.50
0017 NS-704-00002 Cable Barrier Gated End Terminal 66      EACH 2,000.00 132,000.00 1,963.64 129,600.24 2,479.62 163,654.92 2,400.00 158,400.00
0018 NS-704-00003 Concrete Strip 44,290.3    SQYD 36.00 1,594,450.80 46.44 2,056,841.53 33.93 1,502,769.88 45.00 1,993,063.50
0019 NS-713-00001 Dynamic Message Sign Unit 4      EACH 15,000.00 60,000.00 5,681.82 22,727.28 15,017.47 60,069.88 15,000.00 60,000.00
                         
    CONTRACTOR TOTAL       4,628,223.80   4,741,410.76   5,939,645.33   6,805,257.00