Bid Tabulations
Letting of
08/14/2013
LA DOTD Headquarters
| Lead Project: H.010401.6 | |
| Parish: St. Bernard | |
| Routes: LA 46, LA 624, LA 625 | |
| Description: LA 46, LA 624 & LA 625: Thin Overlay | |
| Type Const: PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $2,029,024.95 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $1,727,111.80 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,729,687.75 |
| 3 | 06276 | Barriere Construction Co., LLC | $1,857,335.60 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Boh Bros. Construction Co., LLC. |
- 2 - Barber Bros. Contracting Co., L.L.C |
- 3 - Barriere Construction Co., LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-38240 | Removal of Signs and Supports (Dead End Installations) | 3 | EACH | 26.00 | 78.00 | 50.00 | 150.00 | 55.00 | 165.00 |
| 0002 | 202-02-38240 | Removal of Signs and Supports (Curve Signage Approx. Sta 14+75) | 6 | EACH | 45.00 | 270.00 | 50.00 | 300.00 | 10.50 | 63.00 |
| 0003 | 202-03-38000 | Relocation of Sign (Adjustment to Proper Height) | 20 | EACH | 45.00 | 900.00 | 50.00 | 1,000.00 | 76.00 | 1,520.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 730 | CUYD | 33.00 | 24,090.00 | 50.00 | 36,500.00 | 50.00 | 36,500.00 |
| 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,106 | CUYD | 17.00 | 35,802.00 | 70.00 | 147,420.00 | 6.00 | 12,636.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 10,752.3 | TON | 85.00 | 913,945.50 | 85.00 | 913,945.50 | 89.00 | 956,954.70 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,647 | TON | 85.00 | 224,995.00 | 115.00 | 304,405.00 | 95.00 | 251,465.00 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 594.6 | SQYD | 90.00 | 53,514.00 | 80.00 | 47,568.00 | 65.00 | 38,649.00 |
| 0009 | 701-14-00100 | Cleaning Existing Pipes | 3,600 | LNFT | 6.00 | 21,600.00 | 0.01 | 36.00 | 6.00 | 21,600.00 |
| 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 25,000.00 | 25,000.00 | 158,000.00 | 158,000.00 |
| 0011 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 10 | LNFT | 10.00 | 100.00 | 2.00 | 20.00 | 0.65 | 6.50 |
| 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 16.21 | MILE | 10.00 | 162.10 | 250.00 | 4,052.50 | 25.00 | 405.25 |
| 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.46 | MILE | 15.00 | 171.90 | 300.00 | 3,438.00 | 265.00 | 3,036.90 |
| 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 10.5 | MILE | 20.00 | 210.00 | 200.00 | 2,100.00 | 371.00 | 3,895.50 |
| 0015 | 717-01-00100 | Seeding | 147 | LB | 15.00 | 2,205.00 | 12.00 | 1,764.00 | 11.00 | 1,617.00 |
| 0016 | 718-01-00100 | Fertilizer | 4,860 | LB | 0.50 | 2,430.00 | 2.00 | 9,720.00 | 0.85 | 4,131.00 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 170,000.00 | 170,000.00 | 100,000.00 | 100,000.00 | 155,000.00 | 155,000.00 |
| 0018 | 729-01-00102 | Sign (Type A)(Furnish and Install) (W1-1R and W1-1L Turn Warning) | 6.25 | SQFT | 20.00 | 125.00 | 25.00 | 156.25 | 19.00 | 118.75 |
| 0019 | 729-01-00102 | Sign (Type A)(Furnish and Install) (W13-1P Advisory Speed Plaque) | 4.5 | SQFT | 20.00 | 90.00 | 25.00 | 112.50 | 19.00 | 85.50 |
| 0020 | 729-01-00102 | Sign (Type A)(Furnish and Install) (W1-8 Chevron Alignment) | 18 | SQFT | 20.00 | 360.00 | 25.00 | 450.00 | 19.00 | 342.00 |
| 0021 | 729-01-00102 | Sign (Type A)(Furnish and Install) (W8-3 "PAVEMENT ENDS") | 9 | SQFT | 20.00 | 180.00 | 25.00 | 225.00 | 19.00 | 171.00 |
| 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 90.00 | 540.00 | 100.00 | 600.00 | 75.00 | 450.00 |
| 0023 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 1,800.00 | 1,800.00 | 2,000.00 | 2,000.00 | 1,300.00 | 1,300.00 |
| 0024 | 729-19-00300 | Dead End Road Installations (Type C) | 2 | EACH | 750.00 | 1,500.00 | 800.00 | 1,600.00 | 650.00 | 1,300.00 |
| 0025 | 729-21-00100 | U-Channel Post | 10 | EACH | 80.00 | 800.00 | 90.00 | 900.00 | 60.00 | 600.00 |
| 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,278 | EACH | 5.50 | 7,029.00 | 6.00 | 7,668.00 | 5.00 | 6,390.00 |
| 0027 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 10 | LNFT | 5.25 | 52.50 | 25.00 | 250.00 | 21.00 | 210.00 |
| 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 22.73 | MILE | 2,600.00 | 59,098.00 | 2,800.00 | 63,644.00 | 2,450.00 | 55,688.50 |
| 0029 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.98 | MILE | 900.00 | 3,582.00 | 800.00 | 3,184.00 | 700.00 | 2,786.00 |
| 0030 | 735-01-00100 | Mailboxes | 72 | EACH | 11.00 | 792.00 | 2.00 | 144.00 | 1.00 | 72.00 |
| 0031 | 735-02-00100 | Mailbox Supports (Single) | 68 | EACH | 175.00 | 11,900.00 | 120.00 | 8,160.00 | 108.00 | 7,344.00 |
| 0032 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 250.00 | 500.00 | 250.00 | 500.00 | 185.00 | 370.00 |
| 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 8,000.00 | 8,000.00 | 6,000.00 | 6,000.00 |
| 0034 | NS-200-00020 | Cleaning Existing Ditches | 20,700 | LNFT | 1.25 | 25,875.00 | 0.01 | 207.00 | 2.85 | 58,995.00 |
| 0035 | NS-500-00280 | Surface Preparation | 1 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 60,000.00 | 60,000.00 |
| 0036 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 18,936 | INLF | 0.55 | 10,414.80 | 0.50 | 9,468.00 | 0.50 | 9,468.00 |
| CONTRACTOR TOTAL | 1,727,111.80 | 1,729,687.75 | 1,857,335.60 | |||||||