Bid Tabulations
Letting of
02/13/2013
LA DOTD Headquarters
| Lead Project: H.010399.6 | |
| Parish: Jefferson | |
| Routes: LA 3257 | |
| Description: LA 3257:Bayou Rigolets-Bayou Villars | |
| Type Const: PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $1,734,316.80 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,390,777.00 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $1,644,751.10 |
| 3 | 00481 | Coastal Bridge Co., L.L.C. | $1,683,544.73 |
| 4 | 00935 | Fleming Construction Co., LLC | $2,097,550.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Boh Bros. Construction Co., LLC. |
- 3 - Coastal Bridge Co., L.L.C. |
- 4 - Fleming Construction Co., LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 252 | LNFT | 15.00 | 3,780.00 | 5.50 | 1,386.00 | 5.00 | 1,260.00 | 5.00 | 1,260.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 985 | CUYD | 10.00 | 9,850.00 | 35.00 | 34,475.00 | 15.00 | 14,775.00 | 40.00 | 39,400.00 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 751 | CUYD | 15.00 | 11,265.00 | 20.00 | 15,020.00 | 45.00 | 33,795.00 | 50.00 | 37,550.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 7,025.2 | TON | 96.00 | 674,419.20 | 100.00 | 702,520.00 | 118.00 | 828,973.60 | 140.00 | 983,528.00 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,505.8 | TON | 83.00 | 124,981.40 | 100.00 | 150,580.00 | 1.00 | 1,505.80 | 180.00 | 271,044.00 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 300 | SQYD | 70.00 | 21,000.00 | 100.00 | 30,000.00 | 105.00 | 31,500.00 | 150.00 | 45,000.00 |
| 0007 | 701-14-00100 | Cleaning Existing Pipes | 475 | LNFT | 15.00 | 7,125.00 | 12.00 | 5,700.00 | 30.00 | 14,250.00 | 12.00 | 5,700.00 |
| 0008 | 702-04-00100 | Adjusting Manholes | 7 | EACH | 650.00 | 4,550.00 | 600.00 | 4,200.00 | 210.00 | 1,470.00 | 1,000.00 | 7,000.00 |
| 0009 | 702-04-00200 | Adjusting Catch Basins | 6 | EACH | 750.50 | 4,503.00 | 700.00 | 4,200.00 | 2,000.00 | 12,000.00 | 1,000.00 | 6,000.00 |
| 0010 | 704-03-00100 | Blocked Out Guard Rail | 75 | LNFT | 20.00 | 1,500.00 | 21.00 | 1,575.00 | 20.00 | 1,500.00 | 20.00 | 1,500.00 |
| 0011 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 81.00 | 8,100.00 | 68.00 | 6,800.00 | 65.00 | 6,500.00 | 65.00 | 6,500.00 |
| 0012 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | EACH | 2,600.00 | 10,400.00 | 2,500.00 | 10,000.00 | 2,400.00 | 9,600.00 | 2,400.00 | 9,600.00 |
| 0013 | 707-01-00100 | Concrete Curb | 40 | LNFT | 28.00 | 1,120.00 | 60.00 | 2,400.00 | 80.00 | 3,200.00 | 100.00 | 4,000.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 165,000.00 | 165,000.00 | 100,000.00 | 100,000.00 | 30,000.00 | 30,000.00 |
| 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.36 | MILE | 300.00 | 1,608.00 | 10.00 | 53.60 | 250.00 | 1,340.00 | 600.00 | 3,216.00 |
| 0016 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.58 | MILE | 100.00 | 958.00 | 20.00 | 191.60 | 200.00 | 1,916.00 | 400.00 | 3,832.00 |
| 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.46 | MILE | 100.00 | 946.00 | 40.00 | 378.40 | 300.00 | 2,838.00 | 475.00 | 4,493.50 |
| 0018 | 717-01-00100 | Seeding | 125.4 | LB | 9.00 | 1,128.60 | 15.00 | 1,881.00 | 12.50 | 1,567.50 | 20.00 | 2,508.00 |
| 0019 | 718-01-00100 | Fertilizer | 4,180 | LB | 0.65 | 2,717.00 | 0.75 | 3,135.00 | 0.65 | 2,717.00 | 1.00 | 4,180.00 |
| 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 55,000.00 | 55,000.00 | 160,000.00 | 160,000.00 | 150,000.00 | 150,000.00 | 110,000.00 | 110,000.00 |
| 0021 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 70.00 | 280.00 | 80.00 | 320.00 | 80.00 | 320.00 | 80.00 | 320.00 |
| 0022 | 729-19-00100 | Dead End Road Installations (Type A) | 2 | EACH | 1,400.00 | 2,800.00 | 1,700.00 | 3,400.00 | 1,600.00 | 3,200.00 | 1,600.00 | 3,200.00 |
| 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 366 | EACH | 7.00 | 2,562.00 | 5.50 | 2,013.00 | 5.00 | 1,830.00 | 5.25 | 1,921.50 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.73 | MILE | 3,000.00 | 14,190.00 | 2,650.00 | 12,534.50 | 2,600.00 | 12,298.00 | 2,500.00 | 11,825.00 |
| 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.79 | MILE | 800.00 | 3,832.00 | 900.00 | 4,311.00 | 700.00 | 3,353.00 | 850.00 | 4,071.50 |
| 0026 | 735-01-00100 | Mailboxes | 324 | EACH | 1.00 | 324.00 | 7.50 | 2,430.00 | 1.00 | 324.00 | 7.00 | 2,268.00 |
| 0027 | 735-02-00100 | Mailbox Supports (Single) | 295 | EACH | 105.00 | 30,975.00 | 150.00 | 44,250.00 | 105.00 | 30,975.00 | 128.00 | 37,760.00 |
| 0028 | 735-03-00100 | Mailbox Supports (Double) | 7 | EACH | 175.00 | 1,225.00 | 275.00 | 1,925.00 | 175.00 | 1,225.00 | 250.00 | 1,750.00 |
| 0029 | 735-04-00100 | Mailbox Supports (Multiple) | 4 | EACH | 325.00 | 1,300.00 | 425.00 | 1,700.00 | 325.00 | 1,300.00 | 415.00 | 1,660.00 |
| 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | 50,000.00 | 50,000.00 | 14,000.00 | 14,000.00 |
| 0031 | 741-11-00200 | Adjusting Water Valve and Meter Box | 7 | EACH | 400.00 | 2,800.00 | 400.00 | 2,800.00 | 210.00 | 1,470.00 | 600.00 | 4,200.00 |
| 0032 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 17,280 | INLF | 0.01 | 172.80 | 0.10 | 1,728.00 | 1.00 | 17,280.00 | 0.65 | 11,232.00 |
| 0033 | 509-01-00100 | Cold Planing Asphaltic Pavement | 67,616 | SQYD | 2.00 | 135,232.00 | 3.00 | 202,848.00 | 2.50 | 169,040.00 | 3.00 | 202,848.00 |
| 0034 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,817 | CUYD | 1.00 | -2,817.00 | 12.00 | -33,804.00 | 0.01 | -28.17 | 1.00 | -2,817.00 |
| 0035 | NS-200-00020 | Cleaning Existing Ditches | 45,400 | LNFT | 4.25 | 192,950.00 | 2.00 | 90,800.00 | 3.75 | 170,250.00 | 5.00 | 227,000.00 |
| CONTRACTOR TOTAL | 1,390,777.00 | 1,644,751.10 | 1,683,544.73 | 2,097,550.50 | ||||||||