LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.010305.6
Parish: Concordia, Catahoula
Routes: LA 908, LA 129, LA 3203, LA 907
Description: CONCORDIA & CATAHOULA PARISH RESURFACING PROJECTS
Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT STABILIZED BASE COURSE, LIME TREATMENT, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, STRIPING AND RELATED WORK.
Estimated Construction Cost: $3,334,863.00


RankLicenseBidderConstruction Bid
1 05789 D & J Construction Co., Inc. $2,969,187.10
2 02214 W. E. Blain & Sons, Inc. $3,136,172.10
3 12487 Diamond B Construction Co., L.L.C. $3,393,817.74
4 12312 Gilchrist Construction Co. LLC $3,616,320.97


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
D & J Construction Co., Inc.
- 2 -
W. E. Blain & Sons, Inc.
- 3 -
Diamond B Construction Co., L.L.C.
- 4 -
Gilchrist Construction Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 303-01-00400 In-Place Cement Stabilized Base Course (12" Thick) 24,600      SQYD 9.00 221,400.00 9.00 221,400.00 10.00 246,000.00 10.00 246,000.00
0002 304-05-00100 Lime Treatment (Type E) 369      TON 400.00 147,600.00 370.00 136,530.00 500.00 184,500.00 425.00 156,825.00
0003 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 4,661      CUYD 28.00 130,508.00 39.00 181,779.00 50.00 233,050.00 88.00 410,168.00
0004 502-01-00100 Superpave Asphaltic Concrete 18,692.8    TON 84.00 1,570,195.20 88.00 1,644,966.40 83.00 1,551,502.40 94.00 1,757,123.20
0005 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 830.9    TON 118.00 98,046.20 135.00 112,171.50 175.00 145,407.50 175.00 145,407.50
0006 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 35,334      GAL 3.30 116,602.20 3.14 110,948.76 3.75 132,502.50 3.50 123,669.00
0007 507-02-00200 Aggregate (S2) 59,035      SQYD 0.95 56,083.25 1.13 66,709.55 1.05 61,986.75 1.00 59,035.00
0008 507-02-00300 Aggregate (S3) 41,210      SQYD 0.73 30,083.30 0.90 37,089.00 0.85 35,028.50 0.80 32,968.00
0009 509-01-00100 Cold Planing Asphaltic Pavement 23,973      SQYD 1.40 33,562.20 2.00 47,946.00 2.50 59,932.50 3.25 77,912.25
0010 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -1,065      CUYD 0.10 -106.50 0.10 -106.50 1.00 -1,065.00 0.10 -106.50
0011 510-01-00200 Pavement Patching (12" Minimum Thickness) 4,550      SQYD 90.00 409,500.00 73.00 332,150.00 95.00 432,250.00 80.00 364,000.00
0012 713-01-00100 Temporary Signs and Barricades 1      LUMP 15,000.00 15,000.00 20,000.00 20,000.00 36,000.00 36,000.00 15,000.00 15,000.00
0013 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 14.897  MILE 1.00 14.90 320.00 4,767.04 215.00 3,202.86 210.00 3,128.37
0014 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 22.198  MILE 1.00 22.20 400.00 8,879.20 425.00 9,434.15 325.00 7,214.35
0015 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 2,420      EACH 1.50 3,630.00 1.50 3,630.00 1.50 3,630.00 1.60 3,872.00
0016 722-01-00100 Project Site Laboratory 2      EACH 5,000.00 10,000.00 6,000.00 12,000.00 3,000.00 6,000.00 3,000.00 6,000.00
0017 727-01-00100 Mobilization 1      LUMP 40,000.00 40,000.00 75,000.00 75,000.00 150,000.00 150,000.00 120,000.00 120,000.00
0018 731-02-00100 Reflectorized Raised Pavement Markers 2,517      EACH 5.00 12,585.00 4.00 10,068.00 4.50 11,326.50 5.25 13,214.25
0019 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 11.213  MILE 2,500.00 28,032.50 2,200.00 24,668.60 2,400.00 26,911.20 2,600.00 29,153.80
0020 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 8.648  MILE 700.00 6,053.60 600.00 5,188.80 600.00 5,188.80 700.00 6,053.60
0021 732-05-00100 Removal of Existing Markings FOR THE REMOVAL OF RAISED PAVEMENT MARKERS ONLY 14.3    MILE 300.00 4,290.00 120.00 1,716.00 150.00 2,145.00 60.00 858.00
0022 735-01-00100 Mailboxes 98      EACH 5.00 490.00 1.00 98.00 5.00 490.00 1.00 98.00
0023 735-02-00100 Mailbox Supports (Single) 82      EACH 115.00 9,430.00 109.00 8,938.00 115.00 9,430.00 110.00 9,020.00
0024 735-03-00100 Mailbox Supports (Double) 4      EACH 175.00 700.00 140.00 560.00 175.00 700.00 145.00 580.00
0025 735-04-00100 Mailbox Supports (Multiple) 2      EACH 250.00 500.00 252.00 504.00 250.00 500.00 260.00 520.00
0026 737-01-00100 Painted Traffic Striping (Solid Line) (4" Width) 1.831  MILE 450.00 823.95 500.00 915.50 500.00 915.50 500.00 915.50
0027 737-02-00100 Painted Traffic Striping (Broken Line) (4" Width) 0.881  MILE 350.00 308.35 250.00 220.25 280.00 246.68 400.00 352.40
0028 740-01-00100 Construction Layout 1      LUMP 9,250.00 9,250.00 45,000.00 45,000.00 30,000.00 30,000.00 15,000.00 15,000.00
0029 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 22,435      INLF 0.65 14,582.75 1.00 22,435.00 0.74 16,601.90 0.55 12,339.25
                         
    CONTRACTOR TOTAL       2,969,187.10   3,136,172.10   3,393,817.74   3,616,320.97