Bid Tabulations
Letting of
06/12/2013
LA DOTD Headquarters
| Lead Project: H.010272.6 | |
| Parish: Vernon | |
| Routes: LA 8 | |
| Description: LA 8: MEDIAN CABLE BARRIER @ LA 117 | |
| Type Const: GRADING, CABLE BARRIER SYSTEM AND RELATED WORK. | |
| Estimated Construction Cost: $119,644.40 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 43371 | Rmd Holdings LTD | $169,644.10 |
| 2 | 54896 | Magee Excavation & Development LLC | $281,302.00 |
| 3 | 32044 | Quality Design & Construction, LLC | $296,724.20 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Rmd Holdings LTD |
- 2 - Magee Excavation & Development LLC |
- 3 - Quality Design & Construction, LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 9,500.00 | 9,500.00 | 20,000.00 | 20,000.00 | 21,520.00 | 21,520.00 |
| 0002 | 204-06-00100 | Temporary Silt Fencing | 2,031 | LNFT | 2.50 | 5,077.50 | 1.00 | 2,031.00 | 3.60 | 7,311.60 |
| 0003 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 13,000.00 | 13,000.00 | 18,000.00 | 18,000.00 | 17,050.00 | 17,050.00 |
| 0004 | 716-01-00100 | Mulch (Vegetative) | 5 | TON | 1,200.00 | 6,000.00 | 750.00 | 3,750.00 | 2,750.00 | 13,750.00 |
| 0005 | 717-01-00100 | Seeding | 200 | LB | 15.00 | 3,000.00 | 22.50 | 4,500.00 | 18.90 | 3,780.00 |
| 0006 | 718-01-00100 | Fertilizer | 2,500 | LB | 1.00 | 2,500.00 | 1.25 | 3,125.00 | 2.90 | 7,250.00 |
| 0007 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 928 | SQYD | 1.45 | 1,345.60 | 4.00 | 3,712.00 | 2.10 | 1,948.80 |
| 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 18,000.00 | 18,000.00 | 60,000.00 | 60,000.00 | 14,600.00 | 14,600.00 |
| 0009 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 18,000.00 | 18,000.00 | 10,800.00 | 10,800.00 |
| 0010 | NS-704-00001 | High Tension Cable Barrier | 1,674 | LNFT | 29.00 | 48,546.00 | 16.00 | 26,784.00 | 18.70 | 31,303.80 |
| 0011 | NS-704-00002 | Cable Barrier Gated End Terminal | 4 | EACH | 5,100.00 | 20,400.00 | 3,500.00 | 14,000.00 | 2,920.00 | 11,680.00 |
| 0012 | NS-704-00003 | Concrete Strip | 1,790 | SQYD | 22.50 | 40,275.00 | 60.00 | 107,400.00 | 87.00 | 155,730.00 |
| CONTRACTOR TOTAL | 169,644.10 | 281,302.00 | 296,724.20 | |||||||