Bid Tabulations
Letting of
01/09/2013
LA DOTD Headquarters
| Lead Project: H.010149.6 | |
| Parish: Rapides | |
| Routes: DONAHUE FERRY ROAD | |
| Description: DONAHUE FERRY RD | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $1,222,177.25 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,284,654.45 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $1,287,667.00 |
| 3 | 46404 | Tarver Land Development LLC | $1,315,591.08 |
| 4 | 05789 | D & J Construction Co., Inc. | $1,766,486.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Tarver Land Development LLC |
- 4 - D & J Construction Co., Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,250.00 | 2,250.00 | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 80 | SQYD | 25.00 | 2,000.00 | 30.00 | 2,400.00 | 40.00 | 3,200.00 | 15.00 | 1,200.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,000 | CUYD | 10.00 | 30,000.00 | 15.00 | 45,000.00 | 6.00 | 18,000.00 | 18.00 | 54,000.00 |
| 0004 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,000 | CUYD | 10.00 | 10,000.00 | 17.00 | 17,000.00 | 12.00 | 12,000.00 | 20.00 | 20,000.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 40 | EACH | 16.00 | 640.00 | 18.00 | 720.00 | 15.00 | 600.00 | 25.00 | 1,000.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 400 | LNFT | 4.00 | 1,600.00 | 3.00 | 1,200.00 | 3.00 | 1,200.00 | 3.00 | 1,200.00 |
| 0007 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 11,013 | SQYD | 7.25 | 79,844.25 | 9.40 | 103,522.20 | 8.00 | 88,104.00 | 12.50 | 137,662.50 |
| 0008 | 304-05-00100 | Lime Treatment (Type E) | 155 | TON | 400.00 | 62,000.00 | 330.00 | 51,150.00 | 500.00 | 77,500.00 | 425.00 | 65,875.00 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 708 | CUYD | 45.00 | 31,860.00 | 68.00 | 48,144.00 | 60.00 | 42,480.00 | 95.00 | 67,260.00 |
| 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 65.00 | 6,500.00 | 43.00 | 4,300.00 | 52.00 | 5,200.00 | 75.00 | 7,500.00 |
| 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 7,452 | TON | 77.50 | 577,530.00 | 78.00 | 581,256.00 | 88.00 | 655,776.00 | 108.00 | 804,816.00 |
| 0012 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 150 | TON | 245.00 | 36,750.00 | 200.00 | 30,000.00 | 100.00 | 15,000.00 | 155.00 | 23,250.00 |
| 0013 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 17,641 | GAL | 4.25 | 74,974.25 | 3.75 | 66,153.75 | 3.10 | 54,687.10 | 4.00 | 70,564.00 |
| 0014 | 507-02-00200 | Aggregate (S2) | 25,943 | SQYD | 1.25 | 32,428.75 | 1.30 | 33,725.90 | 1.70 | 44,103.10 | 2.00 | 51,886.00 |
| 0015 | 507-02-00300 | Aggregate (S3) | 25,943 | SQYD | 1.15 | 29,834.45 | 1.10 | 28,537.30 | 1.65 | 42,805.95 | 2.00 | 51,886.00 |
| 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 10,554 | SQYD | 3.00 | 31,662.00 | 2.80 | 29,551.20 | 1.50 | 15,831.00 | 5.00 | 52,770.00 |
| 0017 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 421 | SQYD | 85.00 | 35,785.00 | 73.00 | 30,733.00 | 100.00 | 42,100.00 | 125.00 | 52,625.00 |
| 0018 | 701-14-00100 | Cleaning Existing Pipes | 24 | LNFT | 11.00 | 264.00 | 25.00 | 600.00 | 50.00 | 1,200.00 | 50.00 | 1,200.00 |
| 0019 | 706-02-00200 | Concrete Drive (6" Thick) | 80 | SQYD | 60.00 | 4,800.00 | 75.00 | 6,000.00 | 65.00 | 5,200.00 | 75.00 | 6,000.00 |
| 0020 | 711-03-00300 | Riprap (30 lb) | 115 | TON | 91.00 | 10,465.00 | 60.00 | 6,900.00 | 75.00 | 8,625.00 | 100.00 | 11,500.00 |
| 0021 | 711-04-00100 | Geotextile Fabric | 225 | SQYD | 3.25 | 731.25 | 1.00 | 225.00 | 4.80 | 1,080.00 | 5.00 | 1,125.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 28,500.00 | 28,500.00 | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | 48,000.00 | 48,000.00 |
| 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18 | MILE | 175.00 | 3,150.00 | 500.00 | 9,000.00 | 100.00 | 1,800.00 | 225.00 | 4,050.00 |
| 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 13.43 | MILE | 450.00 | 6,043.50 | 355.00 | 4,767.65 | 1.00 | 13.43 | 400.00 | 5,372.00 |
| 0025 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,500 | EACH | 1.75 | 2,625.00 | 1.60 | 2,400.00 | 2.00 | 3,000.00 | 2.00 | 3,000.00 |
| 0026 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 900 | SQYD | 1.35 | 1,215.00 | 2.00 | 1,800.00 | 2.00 | 1,800.00 | 3.00 | 2,700.00 |
| 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 105,000.00 | 105,000.00 | 70,000.00 | 70,000.00 | 50,000.00 | 50,000.00 | 124,000.00 | 124,000.00 |
| 0028 | 729-01-00100 | Sign (Type A) | 180 | SQFT | 22.00 | 3,960.00 | 25.00 | 4,500.00 | 20.00 | 3,600.00 | 25.00 | 4,500.00 |
| 0029 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 55.00 | 440.00 | 55.00 | 440.00 | 100.00 | 800.00 | 100.00 | 800.00 |
| 0030 | 729-21-00100 | U-Channel Post | 60 | EACH | 110.00 | 6,600.00 | 110.00 | 6,600.00 | 77.00 | 4,620.00 | 75.00 | 4,500.00 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 845 | EACH | 5.00 | 4,225.00 | 5.00 | 4,225.00 | 5.50 | 4,647.50 | 6.00 | 5,070.00 |
| 0032 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,000 | LNFT | 1.10 | 1,100.00 | 1.60 | 1,600.00 | 1.50 | 1,500.00 | 2.00 | 2,000.00 |
| 0033 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 1,200 | LNFT | 2.82 | 3,384.00 | 1.90 | 2,280.00 | 3.50 | 4,200.00 | 3.00 | 3,600.00 |
| 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 100 | LNFT | 4.25 | 425.00 | 5.00 | 500.00 | 5.00 | 500.00 | 7.00 | 700.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.43 | MILE | 2,400.00 | 32,232.00 | 2,700.00 | 36,261.00 | 2,600.00 | 34,918.00 | 3,000.00 | 40,290.00 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1 | MILE | 675.00 | 675.00 | 775.00 | 775.00 | 850.00 | 850.00 | 1,000.00 | 1,000.00 |
| 0037 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.25 | MILE | 5,500.00 | 1,375.00 | 3,300.00 | 825.00 | 2,200.00 | 550.00 | 5,000.00 | 1,250.00 |
| 0038 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 175.00 | 875.00 | 250.00 | 1,250.00 | 250.00 | 1,250.00 | 500.00 | 2,500.00 |
| 0039 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 175.00 | 700.00 | 250.00 | 1,000.00 | 250.00 | 1,000.00 | 500.00 | 2,000.00 |
| 0040 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 9 | EACH | 175.00 | 1,575.00 | 330.00 | 2,970.00 | 250.00 | 2,250.00 | 500.00 | 4,500.00 |
| 0041 | 739-01-00100 | Hydro-Seeding | 4.5 | ACRE | 1,200.00 | 5,400.00 | 1,200.00 | 5,400.00 | 2,000.00 | 9,000.00 | 2,500.00 | 11,250.00 |
| 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 6,200.00 | 6,200.00 | 12,500.00 | 12,500.00 | 5,000.00 | 5,000.00 |
| 0043 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 13,460 | INLF | 0.60 | 8,076.00 | 0.35 | 4,711.00 | 2.00 | 26,920.00 | 0.25 | 3,365.00 |
| 0044 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 360 | INLF | 6.00 | 2,160.00 | 2.90 | 1,044.00 | 0.50 | 180.00 | 2.00 | 720.00 |
| CONTRACTOR TOTAL | 1,284,654.45 | 1,287,667.00 | 1,315,591.08 | 1,766,486.50 | ||||||||