Bid Tabulations
Letting of
09/12/2012
LA DOTD Headquarters
| Lead Project: H.009995.6 | |
| Parish: Vermilion | |
| Routes: LA 693 | |
| Description: LA 693: LOCAL ROAD (CLEO ROAD) - LA 82 | |
| Type Const: GRADING, COLD PLANING ASPHALTIC PAVEMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, ASPHALTIC SURFACE TREATMENT, and RELATED WORK. | |
| Estimated Construction Cost: $1,707,920.67 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08815 | W. E. Mcdonald & Son, LLC. | $1,545,250.87 |
| 2 | 33663 | Glenn Lege Construction Inc | $1,603,179.58 |
| 3 | 51821 | Elliott Construction, LLC | $1,651,502.89 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $1,657,238.03 |
| 5 | 00481 | Coastal Bridge Co., L.L.C. | $1,719,340.82 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - W. E. Mcdonald & Son, LLC. |
- 2 - Glenn Lege Construction Inc |
- 3 - Elliott Construction, LLC |
- 4 - Diamond B Construction Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 5 | SQYD | 125.00 | 625.00 | 75.00 | 375.00 | 100.00 | 500.00 | 150.00 | 750.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 12.00 | 6,000.00 | 13.50 | 6,750.00 | 15.00 | 7,500.00 | 13.00 | 6,500.00 |
| 0003 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,682 | CUYD | 12.00 | 20,184.00 | 3.00 | 5,046.00 | 15.00 | 25,230.00 | 13.00 | 21,866.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 34 | EACH | 50.00 | 1,700.00 | 100.00 | 3,400.00 | 75.00 | 2,550.00 | 165.00 | 5,610.00 |
| 0005 | 303-01-00200 | In-Place Cement Stabilized Base Course (8 1/2" Thick) | 43,339 | SQYD | 6.15 | 266,534.85 | 5.50 | 238,364.50 | 5.95 | 257,867.05 | 6.75 | 292,538.25 |
| 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,683 | CUYD | 25.00 | 42,075.00 | 31.50 | 53,014.50 | 20.00 | 33,660.00 | 48.00 | 80,784.00 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 1.00 | 50.00 | 25.00 | 1,250.00 | 50.00 | 2,500.00 | 75.00 | 3,750.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 8,093 | TON | 85.00 | 687,905.00 | 76.50 | 619,114.50 | 95.50 | 772,881.50 | 87.00 | 704,091.00 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,370.3 | TON | 115.00 | 157,584.50 | 80.00 | 109,624.00 | 125.00 | 171,287.50 | 145.00 | 198,693.50 |
| 0010 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 30,003 | GAL | 3.60 | 108,010.80 | 3.96 | 118,811.88 | 3.96 | 118,811.88 | 3.75 | 112,511.25 |
| 0011 | 507-02-00200 | Aggregate (S2) | 44,121 | SQYD | 0.92 | 40,591.32 | 1.01 | 44,562.21 | 1.01 | 44,562.21 | 1.00 | 44,121.00 |
| 0012 | 507-02-00300 | Aggregate (S3) | 44,121 | SQYD | 0.67 | 29,561.07 | 0.74 | 32,649.54 | 0.74 | 32,649.54 | 0.70 | 30,884.70 |
| 0013 | 509-01-00100 | Cold Planing Asphaltic Pavement | 40,906 | SQYD | 2.00 | 81,812.00 | 1.00 | 40,906.00 | 1.75 | 71,585.50 | 1.90 | 77,721.40 |
| 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,057 | CUYD | 0.01 | -30.57 | 0.10 | -305.70 | 0.01 | -30.57 | 10.00 | -30,570.00 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 7,995.89 | 7,995.89 | 16,000.00 | 16,000.00 | 10,250.00 | 10,250.00 |
| 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.267 | MILE | 400.00 | 2,506.80 | 300.00 | 1,880.10 | 416.00 | 2,607.07 | 170.00 | 1,065.39 |
| 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.13 | MILE | 200.00 | 1,026.00 | 220.22 | 1,129.73 | 220.00 | 1,128.60 | 202.00 | 1,036.26 |
| 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.609 | MILE | 400.00 | 6,643.60 | 440.44 | 7,315.27 | 440.00 | 7,307.96 | 405.00 | 6,726.65 |
| 0019 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 830 | EACH | 1.50 | 1,245.00 | 1.65 | 1,369.50 | 1.65 | 1,369.50 | 1.65 | 1,369.50 |
| 0020 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 3,000.00 | 3,000.00 | 7,700.00 | 7,700.00 | 6,600.00 | 6,600.00 | 3,250.00 | 3,250.00 |
| 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 42,000.00 | 42,000.00 | 255,129.88 | 255,129.88 | 36,000.00 | 36,000.00 | 45,000.00 | 45,000.00 |
| 0022 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 75.00 | 900.00 | 82.58 | 990.96 | 82.50 | 990.00 | 80.00 | 960.00 |
| 0023 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 110.11 | 440.44 | 110.00 | 440.00 | 105.00 | 420.00 |
| 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 530 | EACH | 4.50 | 2,385.00 | 5.64 | 2,989.20 | 4.95 | 2,623.50 | 5.00 | 2,650.00 |
| 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.305 | MILE | 2,400.00 | 19,932.00 | 3,003.00 | 24,939.92 | 2,640.00 | 21,925.20 | 2,500.00 | 20,762.50 |
| 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.565 | MILE | 700.00 | 1,795.50 | 875.88 | 2,246.63 | 770.00 | 1,975.05 | 725.00 | 1,859.63 |
| 0027 | 735-01-00100 | Mailboxes | 65 | EACH | 1.00 | 65.00 | 1.10 | 71.50 | 1.10 | 71.50 | 1.00 | 65.00 |
| 0028 | 735-02-00100 | Mailbox Supports (Single) | 61 | EACH | 117.00 | 7,137.00 | 128.83 | 7,858.63 | 128.70 | 7,850.70 | 120.00 | 7,320.00 |
| 0029 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 136.00 | 272.00 | 149.75 | 299.50 | 149.60 | 299.20 | 140.00 | 280.00 |
| 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 6,700.00 | 6,700.00 | 2,200.00 | 2,200.00 | 4,300.00 | 4,300.00 |
| 0031 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 56 | INLF | 15.00 | 840.00 | 10.00 | 560.00 | 10.00 | 560.00 | 12.00 | 672.00 |
| CONTRACTOR TOTAL | 1,545,250.87 | 1,603,179.58 | 1,651,502.89 | 1,657,238.03 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Coastal Bridge Co., L.L.C. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 5 | SQYD | 150.00 | 750.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 20.00 | 10,000.00 |
| 0003 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,682 | CUYD | 35.00 | 58,870.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 34 | EACH | 1.00 | 34.00 |
| 0005 | 303-01-00200 | In-Place Cement Stabilized Base Course (8 1/2" Thick) | 43,339 | SQYD | 7.25 | 314,207.75 |
| 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,683 | CUYD | 40.00 | 67,320.00 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 40.00 | 2,000.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 8,093 | TON | 80.00 | 647,440.00 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,370.3 | TON | 130.00 | 178,139.00 |
| 0010 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 30,003 | GAL | 3.66 | 109,810.98 |
| 0011 | 507-02-00200 | Aggregate (S2) | 44,121 | SQYD | 1.00 | 44,121.00 |
| 0012 | 507-02-00300 | Aggregate (S3) | 44,121 | SQYD | 0.70 | 30,884.70 |
| 0013 | 509-01-00100 | Cold Planing Asphaltic Pavement | 40,906 | SQYD | 1.25 | 51,132.50 |
| 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,057 | CUYD | 0.01 | -30.57 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 |
| 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.267 | MILE | 160.00 | 1,002.72 |
| 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.13 | MILE | 1.00 | 5.13 |
| 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.609 | MILE | 1.00 | 16.61 |
| 0019 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 830 | EACH | 1.50 | 1,245.00 |
| 0020 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 |
| 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 125,000.00 | 125,000.00 |
| 0022 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 75.00 | 900.00 |
| 0023 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 |
| 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 530 | EACH | 10.00 | 5,300.00 |
| 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.305 | MILE | 2,500.00 | 20,762.50 |
| 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.565 | MILE | 900.00 | 2,308.50 |
| 0027 | 735-01-00100 | Mailboxes | 65 | EACH | 1.00 | 65.00 |
| 0028 | 735-02-00100 | Mailbox Supports (Single) | 61 | EACH | 120.00 | 7,320.00 |
| 0029 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 140.00 | 280.00 |
| 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 |
| 0031 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 56 | INLF | 1.00 | 56.00 |
| CONTRACTOR TOTAL | 1,719,340.82 | |||||