LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.009937.6
Parish: District 61
Routes:
Description: District 61 Controller Upgrade
Type Const: SIGNAL CONTROLLER AND RELATED WORK.
Estimated Construction Cost: $203,050.00


RankLicenseBidderConstruction Bid
1 08470 Diamond Electrical Co., Inc. $223,940.00
2 13082 Wye Electric, Inc. $249,500.00
3 05473 Jack B. Harper Electrical LLC $257,708.00
4 01165 Ernest P. Breaux Electrical, Inc. $374,000.00


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Diamond Electrical Co., Inc.
- 2 -
Wye Electric, Inc.
- 3 -
Jack B. Harper Electrical LLC
- 4 -
Ernest P. Breaux Electrical, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 713-01-00100 Temporary Signs and Barricades 1      LUMP 590.00 590.00 3,000.00 3,000.00 6,600.00 6,600.00 10,000.00 10,000.00
0002 727-01-00100 Mobilization 1      LUMP 3,835.00 3,835.00 10,000.00 10,000.00 3,600.00 3,600.00 20,000.00 20,000.00
0003 736-08-00060 Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Exis Cabinet) (F&I) 43      EACH 4,075.00 175,225.00 4,400.00 189,200.00 4,725.00 203,175.00 6,000.00 258,000.00
0004 NS-736-00001 GPS 43      EACH 1,030.00 44,290.00 1,100.00 47,300.00 1,031.00 44,333.00 2,000.00 86,000.00
                         
    CONTRACTOR TOTAL       223,940.00   249,500.00   257,708.00   374,000.00
 Free Tourist Map  
The La DOTD Headquarters Building is located at 1201 Capitol Access Road, Baton Rouge, LA, 70802. Telephone: (225) 379-1232.
Please send us your Comments or Suggestions.