Bid Tabulations
Letting of
01/09/2013
LA DOTD Headquarters
| Lead Project: H.009910.6 | |
| Parish: West Baton Rouge | |
| Routes: LA 989-2, LA 987-4 | |
| Description: LA 987-4 & LA 989-2: THIN ASPH CONC OVERLAY | |
| Type Const: COLD PLANE, PAVEMENT PATCHING, THIN ASPHALITC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $395,996.25 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00481 | Coastal Bridge Co., L.L.C. | $340,523.54 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $354,110.30 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Coastal Bridge Co., L.L.C. |
- 2 - Barber Bros. Contracting Co., L.L.C |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 204-06-00100 | Temporary Silt Fencing | 30 | LNFT | 5.00 | 150.00 | 5.00 | 150.00 |
| 0002 | 501-01-00004 | Thin Asphaltic Concrete (Dense Mix) | 1,378.4 | TON | 125.00 | 172,300.00 | 115.00 | 158,516.00 |
| 0003 | 501-02-00001 | Tack Coat QUANTITY IS FOR THIN ASPHALTIC CONCRETE LAYER ONLY | 9,588 | GAL | 0.10 | 958.80 | 3.00 | 28,764.00 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 31,961 | SQYD | 2.00 | 63,922.00 | 1.50 | 47,941.50 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -266 | CUYD | 0.01 | -2.66 | 0.00 | 0.00 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 150 | SQYD | 135.00 | 20,250.00 | 50.00 | 7,500.00 |
| 0007 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 52 | EACH | 160.00 | 8,320.00 | 10.00 | 520.00 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 26,000.00 | 26,000.00 |
| 0009 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 152 | LNFT | 0.30 | 45.60 | 0.40 | 60.80 |
| 0010 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 450 | LNFT | 0.75 | 337.50 | 1.00 | 450.00 |
| 0011 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.18 | MILE | 160.00 | 988.80 | 300.00 | 1,854.00 |
| 0012 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.18 | MILE | 250.00 | 1,545.00 | 300.00 | 1,854.00 |
| 0013 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 80.00 | 160.00 | 100.00 | 200.00 |
| 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 |
| 0015 | 731-02-00100 | Reflectorized Raised Pavement Markers | 274 | EACH | 5.25 | 1,438.50 | 6.00 | 1,644.00 |
| 0016 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 152 | LNFT | 2.50 | 380.00 | 3.00 | 456.00 |
| 0017 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 150 | LNFT | 5.00 | 750.00 | 6.00 | 900.00 |
| 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.24 | MILE | 2,500.00 | 20,600.00 | 3,000.00 | 24,720.00 |
| 0019 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 2 | EACH | 300.00 | 600.00 | 350.00 | 700.00 |
| 0020 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 400.00 | 800.00 | 500.00 | 1,000.00 |
| 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 |
| 0022 | 741-11-00100 | Adjusting Water Valve | 8 | EACH | 160.00 | 1,280.00 | 10.00 | 80.00 |
| 0023 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,800 | INLF | 0.25 | 450.00 | 1.00 | 1,800.00 |
| 0024 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 9,000 | INLF | 0.25 | 2,250.00 | 1.00 | 9,000.00 |
| CONTRACTOR TOTAL | 340,523.54 | 354,110.30 | ||||||