Bid Tabulations
Letting of
06/27/2012
LA DOTD Headquarters
| Lead Project: H.009902.6 | |
| Parish: Orleans | |
| Routes: US 90B | |
| Description: US 90B Frontage Rd. (Orleans) | |
| Type Const: cold planing, overlay, pavement markings | |
| Estimated Construction Cost: $1,945,716.69 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $2,374,348.59 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $2,446,784.88 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Boh Bros. Construction Co., LLC. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-00020 | Removal of Crosswalk | 335.83 | SQYD | 30.00 | 10,074.90 | 20.00 | 6,716.60 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 1,650 | LNFT | 1.00 | 1,650.00 | 10.00 | 16,500.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 306.5 | SQYD | 40.00 | 12,260.00 | 15.00 | 4,597.50 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 60 | LNFT | 1.00 | 60.00 | 5.00 | 300.00 |
| 0005 | 202-02-26300 | Removal of Median / Island | 11.7 | SQYD | 40.00 | 468.00 | 15.00 | 175.50 |
| 0006 | 202-03-00010 | Relocation Existing Tree to Another Location | 12 | EACH | 1,100.00 | 13,200.00 | 1,800.00 | 21,600.00 |
| 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 50 | CUYD | 55.00 | 2,750.00 | 40.00 | 2,000.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 8,725.2 | TON | 110.00 | 959,772.00 | 105.00 | 916,146.00 |
| 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 922.2 | TON | 150.00 | 138,330.00 | 150.00 | 138,330.00 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 87,705 | SQYD | 3.00 | 263,115.00 | 3.00 | 263,115.00 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -4,872 | CUYD | 10.00 | -48,720.00 | 14.00 | -68,208.00 |
| 0014 | 510-02-00100 | Pavement Widening | 349 | SQYD | 75.00 | 26,175.00 | 90.00 | 31,410.00 |
| 0016 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 16 | LNFT | 240.00 | 3,840.00 | 200.00 | 3,200.00 |
| 0017 | 701-14-00100 | Cleaning Existing Pipes | 1,000 | LNFT | 12.00 | 12,000.00 | 4.25 | 4,250.00 |
| 0018 | 702-03-00500 | Catch Basins (CB-06) | 2 | EACH | 5,000.00 | 10,000.00 | 7,000.00 | 14,000.00 |
| 0020 | 702-04-00100 | Adjusting Manholes | 30 | EACH | 890.00 | 26,700.00 | 1,000.00 | 30,000.00 |
| 0021 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 20 | EACH | 250.00 | 5,000.00 | 200.00 | 4,000.00 |
| 0022 | 702-04-00200 | Adjusting Catch Basins | 5 | EACH | 1,500.00 | 7,500.00 | 4,500.00 | 22,500.00 |
| 0023 | 702-04-00300 | Adjusting Junction Boxes | 1 | EACH | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 |
| 0024 | 706-01-00300 | Concrete Walk (6" Thick) | 306.5 | SQYD | 55.00 | 16,857.50 | 80.00 | 24,520.00 |
| 0025 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 594 | SQYD | 60.00 | 35,640.00 | 85.00 | 50,490.00 |
| 0026 | 706-04-00100 | Handicapped Curb Ramps | 66 | EACH | 1,450.00 | 95,700.00 | 2,700.00 | 178,200.00 |
| 0027 | 707-01-00200 | Concrete Curb (Barrier) | 10 | LNFT | 20.00 | 200.00 | 20.00 | 200.00 |
| 0028 | 707-01-00300 | Concrete Curb (Mountable) | 400 | LNFT | 15.00 | 6,000.00 | 20.00 | 8,000.00 |
| 0029 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,344 | LNFT | 35.00 | 47,040.00 | 35.00 | 47,040.00 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 223,000.00 | 223,000.00 |
| 0031 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 22,524 | LNFT | 0.02 | 450.48 | 0.01 | 225.24 |
| 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 7,334 | LNFT | 1.25 | 9,167.50 | 0.03 | 220.02 |
| 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.205 | MILE | 300.00 | 1,861.50 | 5.00 | 31.03 |
| 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.68 | MILE | 300.00 | 5,604.00 | 10.00 | 186.80 |
| 0035 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 20 | EACH | 15.00 | 300.00 | 5.00 | 100.00 |
| 0036 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 16 | EACH | 15.00 | 240.00 | 7.00 | 112.00 |
| 0037 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 15.00 | 60.00 | 5.00 | 20.00 |
| 0038 | 717-01-00100 | Seeding | 11.372 | LB | 15.00 | 170.58 | 30.00 | 341.16 |
| 0039 | 718-01-00100 | Fertilizer | 454.89 | LB | 1.00 | 454.89 | 2.50 | 1,137.23 |
| 0040 | 726-01-00100 | Bedding Material | 1.481 | CUYD | 85.00 | 125.89 | 100.00 | 148.10 |
| 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 240,000.00 | 240,000.00 |
| 0042 | 729-01-00100 | Sign (Type A) | 16 | SQFT | 27.00 | 432.00 | 26.50 | 424.00 |
| 0043 | 729-04-00100 | Sign (Type D) | 20 | SQFT | 32.00 | 640.00 | 31.50 | 630.00 |
| 0044 | 729-21-00100 | U-Channel Post | 5 | EACH | 200.00 | 1,000.00 | 130.00 | 650.00 |
| 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,575 | EACH | 5.25 | 24,018.75 | 5.50 | 25,162.50 |
| 0046 | 732-02-01000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) | 9.34 | MILE | 2,000.00 | 18,680.00 | 1,850.00 | 17,279.00 |
| 0047 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 2.133 | MILE | 7,000.00 | 14,931.00 | 6,850.00 | 14,611.05 |
| 0048 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.695 | MILE | 25,000.00 | 17,375.00 | 21,100.00 | 14,664.50 |
| 0049 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 3.102 | MILE | 700.00 | 2,171.40 | 700.00 | 2,171.40 |
| 0050 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.346 | MILE | 1,400.00 | 484.40 | 1,300.00 | 449.80 |
| 0051 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.085 | MILE | 3,100.00 | 263.50 | 3,150.00 | 267.75 |
| 0052 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.104 | MILE | 3,200.00 | 332.80 | 3,150.00 | 327.60 |
| 0053 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 5 | EACH | 250.00 | 1,250.00 | 215.00 | 1,075.00 |
| 0054 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 9 | EACH | 300.00 | 2,700.00 | 280.00 | 2,520.00 |
| 0055 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 250.00 | 1,250.00 | 225.00 | 1,125.00 |
| 0056 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 300.00 | 1,500.00 | 225.00 | 1,125.00 |
| 0057 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 300.00 | 600.00 | 235.00 | 470.00 |
| 0058 | 732-05-00100 | Removal of Existing Markings | 0.028 | MILE | 15,000.00 | 420.00 | 5,300.00 | 148.40 |
| 0059 | 736-09-00100 | Loop Detector | 3,689 | LNFT | 14.00 | 51,646.00 | 15.00 | 55,335.00 |
| 0060 | 736-10-00100 | Underground Junction Box (Type D) | 18 | EACH | 300.00 | 5,400.00 | 300.00 | 5,400.00 |
| 0061 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 180 | LNFT | 5.00 | 900.00 | 5.00 | 900.00 |
| 0062 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 |
| 0063 | 741-11-00100 | Adjusting Water Valve | 2 | EACH | 400.00 | 800.00 | 350.00 | 700.00 |
| 0064 | NS-602-00001 | Milling Concrete Pavement | 20 | SQYD | 325.00 | 6,500.00 | 50.00 | 1,000.00 |
| 0065 | NS-702-00001 | Cleaning Existing Catch Basin | 143 | EACH | 80.00 | 11,440.00 | 250.00 | 35,750.00 |
| 0067 | NS-706-00300 | Incidental Concrete Paving (with Special Applications) | 335.83 | SQYD | 550.00 | 184,706.50 | 90.00 | 30,224.70 |
| 0068 | NS-MSC-00120 | Drainage Structure Convert Catch Basin to Manhole | 2 | EACH | 5,000.00 | 10,000.00 | 4,500.00 | 9,000.00 |
| 0069 | 707-03-00100 | Combination Concrete Curb and Gutter (10" Curb) | 306 | LNFT | 60.00 | 18,360.00 | 45.00 | 13,770.00 |
| CONTRACTOR TOTAL | 2,374,348.59 | 2,446,784.88 | ||||||