Bid Tabulations
Letting of
02/13/2013
LA DOTD Headquarters
| Lead Project: H.009901.6 | |
| Parish: Terrebonne | |
| Routes: LA 20 | |
| Description: LA 20: EAST LEG OF US 90 WYE - JCT. LA 309 | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $2,929,299.78 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,887,489.20 |
| 2 | 06487 | Huey Stockstill, Inc. | $2,140,783.81 |
| 3 | 00481 | Coastal Bridge Co., L.L.C. | $2,368,237.54 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Huey Stockstill, Inc. |
- 3 - Coastal Bridge Co., L.L.C. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 1,156.25 | LNFT | 13.00 | 15,031.25 | 14.00 | 16,187.50 | 15.00 | 17,343.75 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,450 | CUYD | 5.00 | 7,250.00 | 15.00 | 21,750.00 | 10.00 | 14,500.00 |
| 0003 | 502-01-00100 | Superpave Asphaltic Concrete | 15,210.8 | TON | 75.00 | 1,140,810.00 | 84.00 | 1,277,707.20 | 80.00 | 1,216,864.00 |
| 0004 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 777.8 | TON | 75.00 | 58,335.00 | 84.00 | 65,335.20 | 130.00 | 101,114.00 |
| 0005 | 509-01-00100 | Cold Planing Asphaltic Pavement | 109,449 | SQYD | 0.50 | 54,724.50 | 2.00 | 218,898.00 | 2.60 | 284,567.40 |
| 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,040.25 | CUYD | 5.00 | -15,201.25 | 10.00 | -30,402.50 | 15.00 | -45,603.75 |
| 0007 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 600 | SQYD | 45.00 | 27,000.00 | 40.00 | 24,000.00 | 50.00 | 30,000.00 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,360 | SQYD | 50.00 | 168,000.00 | 40.00 | 134,400.00 | 50.00 | 168,000.00 |
| 0009 | 704-03-00100 | Blocked Out Guard Rail | 193.75 | LNFT | 17.00 | 3,293.75 | 19.00 | 3,681.25 | 20.00 | 3,875.00 |
| 0010 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 150 | LNFT | 30.00 | 4,500.00 | 30.00 | 4,500.00 | 30.00 | 4,500.00 |
| 0011 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 62.00 | 18,600.00 | 65.00 | 19,500.00 | 60.00 | 18,000.00 |
| 0012 | 704-11-00100 | Guard Rail End Treatment (Flared) | 10 | EACH | 2,600.00 | 26,000.00 | 2,600.00 | 26,000.00 | 2,500.00 | 25,000.00 |
| 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 20,000.00 | 20,000.00 | 100,000.00 | 100,000.00 |
| 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 16.75 | MILE | 130.00 | 2,177.50 | 10.00 | 167.50 | 1.00 | 16.75 |
| 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 15.07 | MILE | 10.00 | 150.70 | 10.00 | 150.70 | 1.00 | 15.07 |
| 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 43.06 | MILE | 10.00 | 430.60 | 10.00 | 430.60 | 1.00 | 43.06 |
| 0017 | 717-01-00100 | Seeding | 140.5 | LB | 5.00 | 702.50 | 5.00 | 702.50 | 10.00 | 1,405.00 |
| 0018 | 718-01-00100 | Fertilizer | 4,684.6 | LB | 0.25 | 1,171.15 | 0.10 | 468.46 | 0.60 | 2,810.76 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 180,000.00 | 180,000.00 | 208,000.00 | 208,000.00 | 225,000.00 | 225,000.00 |
| 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 62.00 | 744.00 | 70.00 | 840.00 | 60.00 | 720.00 |
| 0021 | 729-19-00300 | Dead End Road Installations (Type C) | 2 | EACH | 800.00 | 1,600.00 | 800.00 | 1,600.00 | 750.00 | 1,500.00 |
| 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,406 | EACH | 4.00 | 5,624.00 | 4.40 | 6,186.40 | 4.25 | 5,975.50 |
| 0023 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 2,180 | LNFT | 1.25 | 2,725.00 | 1.30 | 2,834.00 | 1.50 | 3,270.00 |
| 0024 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 445 | LNFT | 4.50 | 2,002.50 | 5.00 | 2,225.00 | 5.00 | 2,225.00 |
| 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.35 | MILE | 2,400.00 | 34,440.00 | 3,000.00 | 43,050.00 | 2,400.00 | 34,440.00 |
| 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.02 | MILE | 600.00 | 3,012.00 | 700.00 | 3,514.00 | 600.00 | 3,012.00 |
| 0027 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 250 | EACH | 125.00 | 31,250.00 | 150.00 | 37,500.00 | 125.00 | 31,250.00 |
| 0028 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 3 | EACH | 400.00 | 1,200.00 | 400.00 | 1,200.00 | 400.00 | 1,200.00 |
| 0029 | 732-05-00100 | Removal of Existing Markings BRIDGES | 0.07 | MILE | 5,000.00 | 350.00 | 5,000.00 | 350.00 | 2,500.00 | 175.00 |
| 0030 | 735-01-00100 | Mailboxes | 47 | EACH | 1.00 | 47.00 | 4.00 | 188.00 | 1.00 | 47.00 |
| 0031 | 735-02-00100 | Mailbox Supports (Single) | 40 | EACH | 120.00 | 4,800.00 | 125.00 | 5,000.00 | 120.00 | 4,800.00 |
| 0032 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 200.00 | 400.00 | 220.00 | 440.00 | 200.00 | 400.00 |
| 0033 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 400.00 | 400.00 | 440.00 | 440.00 | 400.00 | 400.00 |
| 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 100,000.00 | 100,000.00 |
| 0035 | NS-700-00240 | Special Guard Rail Anchor Section | 2 | EACH | 800.00 | 1,600.00 | 800.00 | 1,600.00 | 750.00 | 1,500.00 |
| 0036 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 12.34 | MILE | 350.00 | 4,319.00 | 1,000.00 | 12,340.00 | 800.00 | 9,872.00 |
| CONTRACTOR TOTAL | 1,887,489.20 | 2,140,783.81 | 2,368,237.54 | |||||||