Bid Tabulations
Letting of
05/15/2013
LA DOTD Headquarters
| Lead Project: H.009897.6 | |
| Parish: St. Tammany | |
| Routes: US 190 | |
| Description: US 190: EAST I-10 SERVICE RD. TO YAUPON STREET | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $276,237.63 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC. | $274,381.65 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $284,005.10 |
| 3 | 00935 | Fleming Construction Co., LLC | $295,794.91 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $303,873.60 |
| 5 | 06487 | Huey Stockstill, Inc. | $330,455.75 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC. |
- 2 - Boh Bros. Construction Co., LLC. |
- 3 - Fleming Construction Co., LLC |
- 4 - Diamond B Construction Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-00010 | Removal of Existing Lane Separator System - 345 LF | 1 | EACH | 2,000.00 | 2,000.00 | 500.00 | 500.00 | 1,500.00 | 1,500.00 | 3,000.00 | 3,000.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 130 | LNFT | 44.00 | 5,720.00 | 15.00 | 1,950.00 | 10.00 | 1,300.00 | 26.00 | 3,380.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 28 | CUYD | 40.00 | 1,120.00 | 75.00 | 2,100.00 | 50.00 | 1,400.00 | 19.00 | 532.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 803.9 | TON | 125.00 | 100,487.50 | 110.00 | 88,429.00 | 140.00 | 112,546.00 | 129.00 | 103,703.10 |
| 0005 | 509-01-00100 | Cold Planing Asphaltic Pavement | 7,309 | SQYD | 3.00 | 21,927.00 | 5.00 | 36,545.00 | 5.00 | 36,545.00 | 6.00 | 43,854.00 |
| 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -406 | CUYD | 20.00 | -8,120.00 | 10.00 | -4,060.00 | 1.00 | -406.00 | 15.00 | -6,090.00 |
| 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 166 | SQYD | 100.00 | 16,600.00 | 90.00 | 14,940.00 | 150.00 | 24,900.00 | 125.00 | 20,750.00 |
| 0008 | 706-03-00300 | Incidental Concrete Paving (6" Thick) station 13+25 - 15+00 | 42.1 | SQYD | 100.00 | 4,210.00 | 200.00 | 8,420.00 | 150.00 | 6,315.00 | 127.00 | 5,346.70 |
| 0009 | 707-03-00100 | Combination Concrete Curb and Gutter to repair existing barrier curb | 30 | LNFT | 75.00 | 2,250.00 | 90.00 | 2,700.00 | 100.00 | 3,000.00 | 115.00 | 3,450.00 |
| 0010 | 707-03-00100 | Combination Concrete Curb and Gutter to repair existing mountable curb | 5 | LNFT | 85.00 | 425.00 | 90.00 | 450.00 | 400.00 | 2,000.00 | 115.00 | 575.00 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 37,000.00 | 37,000.00 | 10,000.00 | 10,000.00 | 17,000.00 | 17,000.00 |
| 0012 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 503 | LNFT | 0.30 | 150.90 | 0.20 | 100.60 | 0.22 | 110.66 | 0.25 | 125.75 |
| 0013 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 389 | LNFT | 1.00 | 389.00 | 0.50 | 194.50 | 0.75 | 291.75 | 0.75 | 291.75 |
| 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.3 | MILE | 700.00 | 210.00 | 300.00 | 90.00 | 475.00 | 142.50 | 160.00 | 48.00 |
| 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.3 | MILE | 525.00 | 157.50 | 300.00 | 90.00 | 475.00 | 142.50 | 505.00 | 151.50 |
| 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.69 | MILE | 1,100.00 | 759.00 | 400.00 | 276.00 | 550.00 | 379.50 | 1,100.00 | 759.00 |
| 0017 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 18 | EACH | 30.00 | 540.00 | 25.00 | 450.00 | 45.00 | 810.00 | 45.00 | 810.00 |
| 0018 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 9 | EACH | 50.00 | 450.00 | 25.00 | 225.00 | 45.00 | 405.00 | 55.00 | 495.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 28,000.00 | 28,000.00 | 20,000.00 | 20,000.00 | 30,500.00 | 30,500.00 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 138 | EACH | 8.00 | 1,104.00 | 6.00 | 828.00 | 10.00 | 1,380.00 | 5.05 | 696.90 |
| 0021 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 503 | LNFT | 1.75 | 880.25 | 2.00 | 1,006.00 | 3.00 | 1,509.00 | 2.25 | 1,131.75 |
| 0022 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 389 | LNFT | 6.00 | 2,334.00 | 6.00 | 2,334.00 | 10.00 | 3,890.00 | 6.30 | 2,450.70 |
| 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.69 | MILE | 4,750.00 | 3,277.50 | 3,800.00 | 2,622.00 | 4,000.00 | 2,760.00 | 9,200.00 | 6,348.00 |
| 0024 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.3 | MILE | 1,250.00 | 375.00 | 1,100.00 | 330.00 | 1,500.00 | 450.00 | 1,100.00 | 330.00 |
| 0025 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 250.00 | 250.00 | 225.00 | 225.00 | 205.00 | 205.00 | 260.00 | 260.00 |
| 0026 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 350.00 | 1,050.00 | 250.00 | 750.00 | 265.00 | 795.00 | 275.00 | 825.00 |
| 0027 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 9 | EACH | 275.00 | 2,475.00 | 225.00 | 2,025.00 | 215.00 | 1,935.00 | 275.00 | 2,475.00 |
| 0028 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 275.00 | 1,375.00 | 225.00 | 1,125.00 | 215.00 | 1,075.00 | 275.00 | 1,375.00 |
| 0029 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 9 | EACH | 400.00 | 3,600.00 | 350.00 | 3,150.00 | 225.00 | 2,025.00 | 310.00 | 2,790.00 |
| 0030 | 736-09-00100 | Loop Detector | 450 | LNFT | 25.00 | 11,250.00 | 16.00 | 7,200.00 | 15.00 | 6,750.00 | 20.00 | 9,000.00 |
| 0031 | 737-05-00001 | Painted Curbs and Islands | 175 | LNFT | 3.00 | 525.00 | 3.50 | 612.50 | 12.00 | 2,100.00 | 3.05 | 533.75 |
| 0032 | 739-01-00100 | Hydro-Seeding | 0.14 | ACRE | 10,000.00 | 1,400.00 | 7,000.00 | 980.00 | 2,000.00 | 280.00 | 8,500.00 | 1,190.00 |
| 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 1,000.00 | 1,000.00 | 6,000.00 | 6,000.00 | 7,500.00 | 7,500.00 |
| 0034 | 741-11-00100 | Adjusting Water Valve | 1 | EACH | 350.00 | 350.00 | 500.00 | 500.00 | 1,000.00 | 1,000.00 | 725.00 | 725.00 |
| 0035 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,400 | INLF | 3.00 | 7,200.00 | 0.50 | 1,200.00 | 0.85 | 2,040.00 | 0.75 | 1,800.00 |
| 0036 | NS-602-00001 | Milling Concrete Pavement | 106.7 | SQYD | 50.00 | 5,335.00 | 25.00 | 2,667.50 | 20.00 | 2,134.00 | 121.00 | 12,910.70 |
| 0037 | NS-700-00600 | Lane Separator System (Furnish and Install) | 345 | LNFT | 85.00 | 29,325.00 | 90.00 | 31,050.00 | 93.00 | 32,085.00 | 50.00 | 17,250.00 |
| 0038 | NS-713-00001 | Dynamic Message Sign Unit | 4 | EACH | 750.00 | 3,000.00 | 1,500.00 | 6,000.00 | 1,500.00 | 6,000.00 | 1,400.00 | 5,600.00 |
| CONTRACTOR TOTAL | 274,381.65 | 284,005.10 | 295,794.91 | 303,873.60 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Huey Stockstill, Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-02-00010 | Removal of Existing Lane Separator System - 345 LF | 1 | EACH | 1,500.00 | 1,500.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 130 | LNFT | 25.00 | 3,250.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 28 | CUYD | 70.00 | 1,960.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 803.9 | TON | 160.00 | 128,624.00 |
| 0005 | 509-01-00100 | Cold Planing Asphaltic Pavement | 7,309 | SQYD | 4.00 | 29,236.00 |
| 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -406 | CUYD | 0.00 | 0.00 |
| 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 166 | SQYD | 140.00 | 23,240.00 |
| 0008 | 706-03-00300 | Incidental Concrete Paving (6" Thick) station 13+25 - 15+00 | 42.1 | SQYD | 250.00 | 10,525.00 |
| 0009 | 707-03-00100 | Combination Concrete Curb and Gutter to repair existing barrier curb | 30 | LNFT | 33.00 | 990.00 |
| 0010 | 707-03-00100 | Combination Concrete Curb and Gutter to repair existing mountable curb | 5 | LNFT | 60.00 | 300.00 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 29,000.00 | 29,000.00 |
| 0012 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 503 | LNFT | 0.25 | 125.75 |
| 0013 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 389 | LNFT | 1.00 | 389.00 |
| 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.3 | MILE | 150.00 | 45.00 |
| 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.3 | MILE | 500.00 | 150.00 |
| 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.69 | MILE | 1,000.00 | 690.00 |
| 0017 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 18 | EACH | 15.00 | 270.00 |
| 0018 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 9 | EACH | 25.00 | 225.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 138 | EACH | 5.00 | 690.00 |
| 0021 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 503 | LNFT | 2.00 | 1,006.00 |
| 0022 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 389 | LNFT | 5.00 | 1,945.00 |
| 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.69 | MILE | 3,600.00 | 2,484.00 |
| 0024 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.3 | MILE | 1,100.00 | 330.00 |
| 0025 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 200.00 | 200.00 |
| 0026 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 225.00 | 675.00 |
| 0027 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 9 | EACH | 200.00 | 1,800.00 |
| 0028 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 250.00 | 1,250.00 |
| 0029 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 9 | EACH | 300.00 | 2,700.00 |
| 0030 | 736-09-00100 | Loop Detector | 450 | LNFT | 15.00 | 6,750.00 |
| 0031 | 737-05-00001 | Painted Curbs and Islands | 175 | LNFT | 3.00 | 525.00 |
| 0032 | 739-01-00100 | Hydro-Seeding | 0.14 | ACRE | 10,000.00 | 1,400.00 |
| 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 |
| 0034 | 741-11-00100 | Adjusting Water Valve | 1 | EACH | 200.00 | 200.00 |
| 0035 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,400 | INLF | 1.25 | 3,000.00 |
| 0036 | NS-602-00001 | Milling Concrete Pavement | 106.7 | SQYD | 30.00 | 3,201.00 |
| 0037 | NS-700-00600 | Lane Separator System (Furnish and Install) | 345 | LNFT | 84.00 | 28,980.00 |
| 0038 | NS-713-00001 | Dynamic Message Sign Unit | 4 | EACH | 2,200.00 | 8,800.00 |
| CONTRACTOR TOTAL | 330,455.75 | |||||