LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.009895.6
Parish: Tangipahoa
Routes: 1050
Description: La 1050: La 1051 To La 38
Type Const: La 1050: La 1051 To La 38
Estimated Construction Cost: $136,527.61


RankLicenseBidderConstruction Bid
1 10989 Dickerson & Bowen, Inc. $127,552.39
2 14422 T. L. Wallace Construction, Inc. $130,442.75


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Dickerson & Bowen, Inc.
- 2 -
T. L. Wallace Construction, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 17,422      GAL 3.99 69,513.78 3.60 62,719.20
0002 507-02-00300 Aggregate (S3) 56,201      SQYD 0.58 32,596.58 0.75 42,150.75
0003 713-01-00100 Temporary Signs and Barricades 1      LUMP 6,000.00 6,000.00 6,500.00 6,500.00
0004 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 1,067      EACH 1.19 1,269.73 1.50 1,600.50
0005 727-01-00100 Mobilization 1      LUMP 6,000.00 6,000.00 5,000.00 5,000.00
0006 731-02-00100 Reflectorized Raised Pavement Markers 534      EACH 4.00 2,136.00 4.00 2,136.00
0007 737-01-00100 Painted Traffic Striping (Solid Line) (4" Width) 13.908  MILE 500.00 6,954.00 500.00 6,954.00
0008 737-02-00100 Painted Traffic Striping (Broken Line) (4" Width) 1.641  MILE 300.00 492.30 300.00 492.30
0009 737-03-00300 Painted Traffic Striping (Solid Line) (8" Width) 120      LNFT 0.30 36.00 0.30 36.00
0010 737-03-00500 Painted Traffic Striping (Solid Line) (24" Width) 60      LNFT 0.90 54.00 0.90 54.00
0011 740-01-00100 Construction Layout 1      LUMP 2,500.00 2,500.00 2,800.00 2,800.00
                 
    CONTRACTOR TOTAL       127,552.39   130,442.75