Bid Tabulations
Letting of
06/26/2013
LA DOTD Headquarters
| Lead Project: H.009883.6 | |
| Parish: Morehouse, Lincoln, Union | |
| Routes: LA 552, LA 563, LA 133 | |
| Description: LA 552, LA 563 & LA 133 AST PROJECTS | |
| Type Const: ASPHALTIC SURFACE TREATMENT, STRIPING and RELATED WORK. | |
| Estimated Construction Cost: $1,078,259.09 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05635 | Dreher Contracting, LLC | $1,104,706.81 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Dreher Contracting, LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 155,135 | GAL | 2.65 | 411,107.75 |
| 0002 | 507-02-00200 | Aggregate (S2) | 228,142 | SQYD | 0.90 | 205,327.80 |
| 0003 | 507-02-00300 | Aggregate (S3) | 228,142 | SQYD | 0.60 | 136,885.20 |
| 0004 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,162 | SQYD | 127.00 | 147,574.00 |
| 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,500.00 | 7,500.00 |
| 0006 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.869 | MILE | 275.00 | 1,613.98 |
| 0007 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 57.398 | MILE | 450.00 | 25,829.10 |
| 0008 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 4,334 | EACH | 1.15 | 4,984.10 |
| 0009 | 727-01-00100 | Mobilization | 1 | LUMP | 109,000.00 | 109,000.00 |
| 0010 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,559 | EACH | 4.60 | 16,371.40 |
| 0011 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 57.398 | MILE | 450.00 | 25,829.10 |
| 0012 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | 5.869 | MILE | 275.00 | 1,613.98 |
| 0013 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 |
| 0014 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 35,352 | INLF | 0.20 | 7,070.40 |
| CONTRACTOR TOTAL | 1,104,706.81 | |||||