Bid Tabulations
Letting of
10/09/2013
LA DOTD Headquarters
| Lead Project: H.009836.6 | |
| Parish: Livingston | |
| Routes: I-12 | |
| Description: I-12:Walker to 0.5M W of Satsuma | |
| Type Const: CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $27,013,352.23 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $5,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $26,496,841.52 | 365 | $28,321,841.52 |
| 2 | 06276 | Barriere Construction Co., LLC. | $26,998,414.00 | 420 | $29,098,414.00 |
| 3 | 34567 | James Construction Group LLC | $27,421,736.22 | 410 | $29,471,736.22 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $30,332,550.64 | 549 | $33,077,550.64 |
| 5 | 00046 | Barber Bros. Contracting Co., L.L.C | $33,971,354.57 | 750 | $37,721,354.57 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Barriere Construction Co., LLC. |
- 3 - James Construction Group LLC |
- 4 - Diamond B Construction Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 250,000.00 | 250,000.00 | 62,000.00 | 62,000.00 | 200,000.00 | 200,000.00 | 100,000.00 | 100,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 110,000.00 | 110,000.00 | 100,000.00 | 100,000.00 | 250,000.00 | 250,000.00 |
| 0003 | 202-02-00010 | Removal of Cross-Drain Headwalls | 13 | EACH | 650.00 | 8,450.00 | 1,000.00 | 13,000.00 | 800.00 | 10,400.00 | 1,500.00 | 19,500.00 |
| 0004 | 202-02-00020 | Removal of Concrete Pad | 3,260.44 | SQYD | 6.00 | 19,562.64 | 1.00 | 3,260.44 | 3.00 | 9,781.32 | 15.00 | 48,906.60 |
| 0005 | 202-02-02040 | Removal of Asphalt Surfacing from Bridge Deck | 400 | SQYD | 10.00 | 4,000.00 | 1.00 | 400.00 | 10.00 | 4,000.00 | 10.00 | 4,000.00 |
| 0006 | 202-02-06000 | Removal of Concrete Approach Slabs | 424 | SQYD | 29.00 | 12,296.00 | 15.00 | 6,360.00 | 60.00 | 25,440.00 | 30.00 | 12,720.00 |
| 0007 | 202-02-06060 | Removal of Concrete Catch Basin Includes Pad | 14 | EACH | 650.00 | 9,100.00 | 100.00 | 1,400.00 | 1,200.00 | 16,800.00 | 2,000.00 | 28,000.00 |
| 0008 | 202-02-14500 | Removal of Guard Rail | 2,812.8 | LNFT | 3.00 | 8,438.40 | 7.50 | 21,096.00 | 4.75 | 13,360.80 | 15.00 | 42,192.00 |
| 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) End Joints of Median Cross Drains | 104 | LNFT | 40.00 | 4,160.00 | 30.00 | 3,120.00 | 29.00 | 3,016.00 | 40.00 | 4,160.00 |
| 0010 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 16,756.44 | SQYD | 9.00 | 150,807.96 | 5.00 | 83,782.20 | 10.00 | 167,564.40 | 20.00 | 335,128.80 |
| 0011 | 202-02-38220 | Removal of Sign Supports | 24 | EACH | 290.00 | 6,960.00 | 290.00 | 6,960.00 | 260.00 | 6,240.00 | 300.00 | 7,200.00 |
| 0012 | 202-02-38300 | Removal of Sign and U-Channel Post | 8 | EACH | 30.00 | 240.00 | 11.00 | 88.00 | 10.00 | 80.00 | 12.00 | 96.00 |
| 0013 | 202-02-38360 | Removal of Sign Faces | 25 | EACH | 175.00 | 4,375.00 | 210.00 | 5,250.00 | 190.00 | 4,750.00 | 200.00 | 5,000.00 |
| 0014 | 202-02-38500 | Removal of Surfacing and Stablized Base | 35,360.46 | SQYD | 3.00 | 106,081.38 | 8.00 | 282,883.68 | 3.00 | 106,081.38 | 6.00 | 212,162.76 |
| 0015 | 203-01-00100 | General Excavation | 18,070.91 | CUYD | 2.00 | 36,141.82 | 15.00 | 271,063.65 | 2.50 | 45,177.28 | 3.00 | 54,212.73 |
| 0016 | 203-03-00100 | Embankment | 41,527.38 | CUYD | 15.00 | 622,910.70 | 17.00 | 705,965.46 | 21.00 | 872,074.98 | 14.00 | 581,383.32 |
| 0017 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,343.1 | CUYD | 18.00 | 60,175.80 | 25.00 | 83,577.50 | 12.00 | 40,117.20 | 20.00 | 66,862.00 |
| 0018 | 204-02-00100 | Temporary Hay or Straw Bales | 372 | EACH | 20.00 | 7,440.00 | 5.00 | 1,860.00 | 15.00 | 5,580.00 | 50.00 | 18,600.00 |
| 0019 | 204-06-00100 | Temporary Silt Fencing | 36,715 | LNFT | 1.90 | 69,758.50 | 0.20 | 7,343.00 | 2.50 | 91,787.50 | 4.00 | 146,860.00 |
| 0020 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 140,134.9 | SQYD | 6.25 | 875,843.13 | 7.00 | 980,944.30 | 8.50 | 1,191,146.65 | 12.00 | 1,681,618.80 |
| 0021 | 302-02-03020 | Class II Base Course (8" Thick) (Soil Cement) | 140,134.9 | SQYD | 10.50 | 1,471,416.45 | 12.00 | 1,681,618.80 | 12.50 | 1,751,686.25 | 10.00 | 1,401,349.00 |
| 0022 | 304-05-00100 | Lime Treatment (Type E) | 1,978.3 | TON | 45.00 | 89,023.50 | 20.00 | 39,566.00 | 5.00 | 9,891.50 | 245.00 | 484,683.50 |
| 0023 | 501-01-00006 | Thin Asphaltic Concrete (OGFC) | 10,808.75 | TON | 130.00 | 1,405,137.50 | 110.00 | 1,188,962.50 | 110.00 | 1,188,962.50 | 124.00 | 1,340,285.00 |
| 0024 | 501-02-00001 | Tack Coat | 39,525.67 | GAL | 3.70 | 146,244.98 | 3.25 | 128,458.43 | 3.00 | 118,577.01 | 3.50 | 138,339.85 |
| 0025 | 502-01-00100 | Superpave Asphaltic Concrete | 119,385.99 | TON | 77.00 | 9,192,721.23 | 77.00 | 9,192,721.23 | 77.00 | 9,192,721.23 | 75.00 | 8,953,949.25 |
| 0026 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 354.14 | TON | 175.00 | 61,974.50 | 125.00 | 44,267.50 | 196.83 | 69,705.38 | 190.00 | 67,286.60 |
| 0027 | 509-01-00100 | Cold Planing Asphaltic Pavement | 73,418.47 | SQYD | 1.90 | 139,495.09 | 2.00 | 146,836.94 | 3.00 | 220,255.41 | 3.60 | 264,306.49 |
| 0028 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,934.52 | CUYD | 1.00 | -2,934.52 | 1.00 | -2,934.52 | 0.01 | -29.35 | 1.00 | -2,934.52 |
| 0029 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,063 | LNFT | 60.00 | 63,780.00 | 70.00 | 74,410.00 | 55.00 | 58,465.00 | 78.00 | 82,914.00 |
| 0030 | 702-03-00100 | Catch Basins (CB-01) | 8 | EACH | 3,000.00 | 24,000.00 | 7,000.00 | 56,000.00 | 3,200.00 | 25,600.00 | 3,000.00 | 24,000.00 |
| 0031 | 703-01-00100 | Shoulder Underdrain Systems | 3,750 | LNFT | 10.00 | 37,500.00 | 10.00 | 37,500.00 | 8.00 | 30,000.00 | 20.00 | 75,000.00 |
| 0032 | 703-02-00100 | Shoulder Outlet Underdrains | 32 | EACH | 1,300.00 | 41,600.00 | 500.00 | 16,000.00 | 485.00 | 15,520.00 | 400.00 | 12,800.00 |
| 0033 | 703-03-00100 | Perforated Pipe Underdrains | 165 | LNFT | 24.00 | 3,960.00 | 20.00 | 3,300.00 | 7.00 | 1,155.00 | 17.00 | 2,805.00 |
| 0034 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 200 | LNFT | 40.00 | 8,000.00 | 50.00 | 10,000.00 | 39.00 | 7,800.00 | 42.00 | 8,400.00 |
| 0035 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 31.25 | LNFT | 45.00 | 1,406.25 | 65.00 | 2,031.25 | 50.00 | 1,562.50 | 55.00 | 1,718.75 |
| 0036 | 704-03-00100 | Blocked Out Guard Rail | 1,288 | LNFT | 23.00 | 29,624.00 | 22.00 | 28,336.00 | 17.00 | 21,896.00 | 18.00 | 23,184.00 |
| 0037 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 12.5 | LNFT | 85.00 | 1,062.50 | 110.00 | 1,375.00 | 80.00 | 1,000.00 | 85.00 | 1,062.50 |
| 0038 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 36 | LNFT | 30.00 | 1,080.00 | 1.00 | 36.00 | 1.00 | 36.00 | 1.00 | 36.00 |
| 0039 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 206.25 | LNFT | 63.00 | 12,993.75 | 90.00 | 18,562.50 | 65.00 | 13,406.25 | 70.00 | 14,437.50 |
| 0040 | 704-11-00100 | Guard Rail End Treatment (Flared) | 7 | EACH | 2,800.00 | 19,600.00 | 2,600.00 | 18,200.00 | 2,000.00 | 14,000.00 | 2,200.00 | 15,400.00 |
| 0041 | 705-09-00100 | Rebuilt Fence | 300 | LNFT | 28.00 | 8,400.00 | 10.00 | 3,000.00 | 25.00 | 7,500.00 | 28.00 | 8,400.00 |
| 0042 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 411 | SQYD | 85.00 | 34,935.00 | 70.00 | 28,770.00 | 45.00 | 18,495.00 | 85.00 | 34,935.00 |
| 0043 | 707-01-00100 | Concrete Curb | 70 | LNFT | 60.00 | 4,200.00 | 20.00 | 1,400.00 | 19.00 | 1,330.00 | 40.00 | 2,800.00 |
| 0044 | 710-01-00100 | Flowable Fill | 80.93 | CUYD | 160.00 | 12,948.80 | 250.00 | 20,232.50 | 145.00 | 11,734.85 | 140.00 | 11,330.20 |
| 0045 | 711-01-06000 | Riprap (250 lb, 30" Thick) | 97 | SQYD | 115.00 | 11,155.00 | 140.00 | 13,580.00 | 265.00 | 25,705.00 | 125.00 | 12,125.00 |
| 0046 | 711-04-00100 | Geotextile Fabric | 147 | SQYD | 5.00 | 735.00 | 4.50 | 661.50 | 3.00 | 441.00 | 5.00 | 735.00 |
| 0047 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) LA 447 Overpass Pier Prot. | 300 | SQYD | 130.00 | 39,000.00 | 110.00 | 33,000.00 | 68.00 | 20,400.00 | 85.00 | 25,500.00 |
| 0048 | 712-04-00100 | Flexible Revetment | 1,705 | SQYD | 48.00 | 81,840.00 | 62.00 | 105,710.00 | 79.00 | 134,695.00 | 65.00 | 110,825.00 |
| 0049 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 510,000.00 | 510,000.00 | 100,000.00 | 100,000.00 | 35,000.00 | 35,000.00 | 250,000.00 | 250,000.00 |
| 0050 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.49 | MILE | 240.00 | 1,557.60 | 170.00 | 1,103.30 | 232.00 | 1,505.68 | 175.00 | 1,135.75 |
| 0051 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) | 6.49 | MILE | 3,400.00 | 22,066.00 | 2,200.00 | 14,278.00 | 4,000.00 | 25,960.00 | 5,500.00 | 35,695.00 |
| 0052 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.2 | MILE | 545.00 | 7,194.00 | 390.00 | 5,148.00 | 350.00 | 4,620.00 | 375.00 | 4,950.00 |
| 0053 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) | 13.2 | MILE | 4,600.00 | 60,720.00 | 2,800.00 | 36,960.00 | 2,500.00 | 33,000.00 | 2,700.00 | 35,640.00 |
| 0054 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 26.79 | MILE | 630.00 | 16,877.70 | 550.00 | 14,734.50 | 550.00 | 14,734.50 | 600.00 | 16,074.00 |
| 0055 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) | 26.79 | MILE | 100.00 | 2,679.00 | 7,200.00 | 192,888.00 | 6,500.00 | 174,135.00 | 7,000.00 | 187,530.00 |
| 0056 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,744 | EACH | 6.00 | 10,464.00 | 5.50 | 9,592.00 | 4.75 | 8,284.00 | 5.00 | 8,720.00 |
| 0057 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 2,349 | EACH | 325.00 | 763,425.00 | 300.00 | 704,700.00 | 270.00 | 634,230.00 | 775.00 | 1,820,475.00 |
| 0058 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 842 | EACH | 25.00 | 21,050.00 | 20.00 | 16,840.00 | 22.00 | 18,524.00 | 50.00 | 42,100.00 |
| 0059 | 721-01-00100 | Mowing 6 Times/Yr for 2 YRS | 699 | ACRE | 60.00 | 41,940.00 | 60.00 | 41,940.00 | 59.50 | 41,590.50 | 75.00 | 52,425.00 |
| 0060 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 | 11,000.00 | 11,000.00 |
| 0061 | 725-01-00100 | Temporary Detour Roads | 5,236.78 | SQYD | 64.00 | 335,153.92 | 100.00 | 523,678.00 | 100.00 | 523,678.00 | 62.00 | 324,680.36 |
| 0062 | 726-01-00100 | Bedding Material | 96 | CUYD | 70.00 | 6,720.00 | 70.00 | 6,720.00 | 55.00 | 5,280.00 | 100.00 | 9,600.00 |
| 0063 | 727-01-00100 | Mobilization | 1 | LUMP | 2,550,000.00 | 2,550,000.00 | 1,809,000.00 | 1,809,000.00 | 2,146,700.00 | 2,146,700.00 | 2,100,000.00 | 2,100,000.00 |
| 0064 | 729-01-00100 | Sign (Type A) | 380.1 | SQFT | 22.00 | 8,362.20 | 19.00 | 7,221.90 | 20.00 | 7,602.00 | 19.00 | 7,221.90 |
| 0065 | 729-04-00100 | Sign (Type D) | 847.5 | SQFT | 22.00 | 18,645.00 | 34.00 | 28,815.00 | 20.00 | 16,950.00 | 33.00 | 27,967.50 |
| 0066 | 729-05-00100 | Sign (Type E) | 85 | SQFT | 28.00 | 2,380.00 | 34.00 | 2,890.00 | 25.00 | 2,125.00 | 33.00 | 2,805.00 |
| 0067 | 729-06-00100 | Sign (Overhead Mounted) | 154.9 | SQFT | 34.00 | 5,266.60 | 33.00 | 5,111.70 | 30.00 | 4,647.00 | 33.00 | 5,111.70 |
| 0068 | 729-08-00200 | Mounting (3 1/2" Size Post) | 10 | EACH | 920.00 | 9,200.00 | 950.00 | 9,500.00 | 800.00 | 8,000.00 | 900.00 | 9,000.00 |
| 0069 | 729-08-00220 | Mounting (3 1/2" Size Post)(Median Barrier Mount) | 5 | EACH | 2,800.00 | 14,000.00 | 1,000.00 | 5,000.00 | 2,500.00 | 12,500.00 | 1,000.00 | 5,000.00 |
| 0070 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 6 | EACH | 1,000.00 | 6,000.00 | 1,800.00 | 10,800.00 | 900.00 | 5,400.00 | 1,800.00 | 10,800.00 |
| 0071 | 729-08-00800 | Mounting (W8 x 24 Size Post) | 9 | EACH | 1,700.00 | 15,300.00 | 2,800.00 | 25,200.00 | 1,500.00 | 13,500.00 | 2,600.00 | 23,400.00 |
| 0072 | 729-11-00100 | Mounting (Overhead Cantilever) (Ground Mounted) | 1 | EACH | 30,000.00 | 30,000.00 | 37,000.00 | 37,000.00 | 28,500.00 | 28,500.00 | 35,000.00 | 35,000.00 |
| 0073 | 729-16-00300 | Object Marker Assembly (Type 3) | 14 | EACH | 75.00 | 1,050.00 | 84.00 | 1,176.00 | 75.00 | 1,050.00 | 85.00 | 1,190.00 |
| 0074 | 729-17-00100 | Milepost Assembly (Ground Mounted) | 8 | EACH | 170.00 | 1,360.00 | 500.00 | 4,000.00 | 150.00 | 1,200.00 | 475.00 | 3,800.00 |
| 0075 | 729-18-00100 | Milepost Assembly (Structure Mounted) | 8 | EACH | 285.00 | 2,280.00 | 220.00 | 1,760.00 | 250.00 | 2,000.00 | 210.00 | 1,680.00 |
| 0076 | 729-18-00200 | Milepost Assembly (Structure Mounted) (Secondary) | 26 | EACH | 285.00 | 7,410.00 | 220.00 | 5,720.00 | 250.00 | 6,500.00 | 215.00 | 5,590.00 |
| 0077 | 729-20-00600 | Footings for Overhead Mountings (Cantilever) | 1 | EACH | 32,000.00 | 32,000.00 | 40,000.00 | 40,000.00 | 24,000.00 | 24,000.00 | 40,000.00 | 40,000.00 |
| 0078 | 729-21-00100 | U-Channel Post | 8 | EACH | 85.00 | 680.00 | 78.00 | 624.00 | 75.00 | 600.00 | 75.00 | 600.00 |
| 0079 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (2#2 XHHW-2, 1#2 BARE SOLID GROUND) | 1,900 | LNFT | 9.60 | 18,240.00 | 9.00 | 17,100.00 | 8.50 | 16,150.00 | 9.00 | 17,100.00 |
| 0080 | 730-03-01060 | Conductors in Existing Conduit (PVC/HDPE) (1 1/4") (2#8 XHHW-2, 1#8 BARE SOLID GROUND) | 200 | LNFT | 2.40 | 480.00 | 4.50 | 900.00 | 2.10 | 420.00 | 2.25 | 450.00 |
| 0081 | 730-03-01060 | Conductors in Existing Conduit (PVC/HDPE) (1 1/4") (2#2 XHHW-2, 1#2 BARE SOLID GROUND) | 100 | LNFT | 9.60 | 960.00 | 9.00 | 900.00 | 8.60 | 860.00 | 9.00 | 900.00 |
| 0082 | 730-03-01080 | Conductors in Existing Conduit (PVC/HDPE) (1 1/2") (2#2 XHHW-2, 2#8 XHHW-2, 1#2 BARE SOLID GROUND) | 1,850 | LNFT | 7.40 | 13,690.00 | 9.00 | 16,650.00 | 6.40 | 11,840.00 | 7.00 | 12,950.00 |
| 0083 | 730-04-00200 | Jacked or Bored Casing (6" Diameter) (PVC/HDPE) (SCHEDULE 80) | 200 | LNFT | 44.00 | 8,800.00 | 32.00 | 6,400.00 | 38.50 | 7,700.00 | 40.00 | 8,000.00 |
| 0084 | 730-05-22220 | Light Pole (50') (Aluminum) (Twin Arm) (Lowering Device) (WITH LOWERING DEVICE) | 8 | EACH | 16,000.00 | 128,000.00 | 18,000.00 | 144,000.00 | 14,810.00 | 118,480.00 | 15,500.00 | 124,000.00 |
| 0085 | 730-07-06000 | Luminaire (400 Watt) (High PressureSodium) (MEDIUM, NON-CUTOFF, TYPE IV, HIGH TILT, WIDE ROADWAY, ADJUSTABLE TRUNION MOUNT) | 16 | EACH | 1,000.00 | 16,000.00 | 1,100.00 | 17,600.00 | 950.00 | 15,200.00 | 1,000.00 | 16,000.00 |
| 0086 | 730-09-00100 | Electrical System | 1 | LUMP | 7,500.00 | 7,500.00 | 4,600.00 | 4,600.00 | 7,000.00 | 7,000.00 | 7,500.00 | 7,500.00 |
| 0087 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 2,400.00 | 2,400.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,400.00 | 2,400.00 |
| 0088 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) (STEEL WITH BREAKAWAY TRANS. BASE, 50') | 3 | EACH | 625.00 | 1,875.00 | 310.00 | 930.00 | 545.00 | 1,635.00 | 600.00 | 1,800.00 |
| 0089 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 4 | EACH | 950.00 | 3,800.00 | 560.00 | 2,240.00 | 830.00 | 3,320.00 | 900.00 | 3,600.00 |
| 0090 | 730-14-00100 | Removal and Disposal of Luminaires (400W HPS) | 6 | EACH | 45.00 | 270.00 | 110.00 | 660.00 | 40.00 | 240.00 | 45.00 | 270.00 |
| 0091 | 730-16-00200 | Underground Junction Box (11" x 18") (JB-2) | 10 | EACH | 585.00 | 5,850.00 | 470.00 | 4,700.00 | 510.00 | 5,100.00 | 550.00 | 5,500.00 |
| 0092 | 730-16-00300 | Underground Junction Box (13" x 24") (JB-3) | 1 | EACH | 1,200.00 | 1,200.00 | 430.00 | 430.00 | 1,070.00 | 1,070.00 | 1,100.00 | 1,100.00 |
| 0093 | 730-19-00010 | Modular Breakaway Cable System | 5 | EACH | 2,100.00 | 10,500.00 | 2,200.00 | 11,000.00 | 1,900.00 | 9,500.00 | 2,000.00 | 10,000.00 |
| 0094 | 730-21-00020 | Duct Marker (Concrete) | 3 | EACH | 200.00 | 600.00 | 290.00 | 870.00 | 180.00 | 540.00 | 200.00 | 600.00 |
| 0096 | 731-02-00100 | Reflectorized Raised Pavement Markers | 7,680 | EACH | 6.00 | 46,080.00 | 5.00 | 38,400.00 | 4.75 | 36,480.00 | 5.00 | 38,400.00 |
| 0097 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.45 | MILE | 3,100.00 | 44,795.00 | 2,800.00 | 40,460.00 | 2,750.00 | 39,737.50 | 3,000.00 | 43,350.00 |
| 0098 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.45 | MILE | 7,500.00 | 3,375.00 | 9,000.00 | 4,050.00 | 8,500.00 | 3,825.00 | 9,000.00 | 4,050.00 |
| 0099 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.06 | MILE | 55,000.00 | 3,300.00 | 37,000.00 | 2,220.00 | 35,000.00 | 2,100.00 | 37,000.00 | 2,220.00 |
| 0100 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 14 | MILE | 980.00 | 13,720.00 | 900.00 | 12,600.00 | 800.00 | 11,200.00 | 900.00 | 12,600.00 |
| 0101 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.42 | MILE | 3,400.00 | 1,428.00 | 4,200.00 | 1,764.00 | 4,000.00 | 1,680.00 | 4,400.00 | 1,848.00 |
| 0102 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 6,900.00 | 13,800.00 | 900.00 | 1,800.00 | 800.00 | 1,600.00 | 800.00 | 1,600.00 |
| 0103 | 732-05-00100 | Removal of Existing Markings | 7.03 | MILE | 285.00 | 2,003.55 | 4,000.00 | 28,120.00 | 3,500.00 | 24,605.00 | 4,000.00 | 28,120.00 |
| 0104 | 733-01-00200 | Concrete Roadway Barrier (Double Faced) | 16,520 | LNFT | 240.00 | 3,964,800.00 | 270.00 | 4,460,400.00 | 265.00 | 4,377,800.00 | 285.00 | 4,708,200.00 |
| 0105 | 739-01-00100 | Hydro-Seeding | 21 | ACRE | 1,300.00 | 27,300.00 | 1,100.00 | 23,100.00 | 1,050.00 | 22,050.00 | 1,200.00 | 25,200.00 |
| 0106 | 740-01-00100 | Construction Layout | 1 | LUMP | 125,000.00 | 125,000.00 | 100,000.00 | 100,000.00 | 120,000.00 | 120,000.00 | 415,000.00 | 415,000.00 |
| 0107 | 804-01-00300 | Precast Concrete Piles (16") | 4,362 | LNFT | 48.00 | 209,376.00 | 69.00 | 300,978.00 | 50.00 | 218,100.00 | 70.00 | 305,340.00 |
| 0108 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 2,000.00 | 2,000.00 | 110.00 | 110.00 | 5,000.00 | 5,000.00 | 50.00 | 50.00 |
| 0109 | 804-13-00100 | Precast Concrete Indicator Piles | 1 | EACH | 15,000.00 | 15,000.00 | 31,000.00 | 31,000.00 | 60,000.00 | 60,000.00 | 28,000.00 | 28,000.00 |
| 0110 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 1,000.00 | 4,000.00 | 1,100.00 | 4,400.00 | 1,100.00 | 4,400.00 | 1,000.00 | 4,000.00 |
| 0111 | 805-01-00700 | Class A Concrete (Bents) | 150.66 | CUYD | 1,200.00 | 180,792.00 | 1,400.00 | 210,924.00 | 1,200.00 | 180,792.00 | 1,400.00 | 210,924.00 |
| 0112 | 805-03-00100 | Class AA Concrete | 763.2 | CUYD | 750.00 | 572,400.00 | 850.00 | 648,720.00 | 700.00 | 534,240.00 | 800.00 | 610,560.00 |
| 0113 | 805-09-00100 | Expansion Joint Seal | 1,750 | LNFT | 10.00 | 17,500.00 | 20.00 | 35,000.00 | 25.00 | 43,750.00 | 20.00 | 35,000.00 |
| 0114 | 806-01-00100 | Deformed Reinforcing Steel | 225,913 | LB | 0.68 | 153,620.84 | 1.50 | 338,869.50 | 1.60 | 361,460.80 | 1.50 | 338,869.50 |
| 0115 | 810-01-00100 | Concrete Railing (Standard Barrier) | 1,120 | LNFT | 65.00 | 72,800.00 | 81.00 | 90,720.00 | 60.00 | 67,200.00 | 80.00 | 89,600.00 |
| 0116 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 400 | LNFT | 65.00 | 26,000.00 | 83.00 | 33,200.00 | 64.00 | 25,600.00 | 80.00 | 32,000.00 |
| 0117 | 813-01-00100 | Concrete Approach Slabs | 2,674.88 | SQYD | 195.00 | 521,601.60 | 240.00 | 641,971.20 | 210.00 | 561,724.80 | 240.00 | 641,971.20 |
| 0118 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 304,040 | INLF | 0.05 | 15,202.00 | 0.01 | 3,040.40 | 0.65 | 197,626.00 | 0.60 | 182,424.00 |
| 0119 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 55,064 | INLF | 0.10 | 5,506.40 | 0.01 | 550.64 | 0.85 | 46,804.40 | 0.65 | 35,791.60 |
| 0120 | NS-700-00180 | Impact Attenuator (Construction Zone) | 15 | EACH | 7,500.00 | 112,500.00 | 10,000.00 | 150,000.00 | 12,000.00 | 180,000.00 | 10,000.00 | 150,000.00 |
| 0121 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 4 | EACH | 1,900.00 | 7,600.00 | 1,300.00 | 5,200.00 | 9,500.00 | 38,000.00 | 1,500.00 | 6,000.00 |
| 0122 | NS-700-00220 | Impact Attenuator (Kinetic) | 1 | EACH | 20,000.00 | 20,000.00 | 21,000.00 | 21,000.00 | 23,000.00 | 23,000.00 | 22,000.00 | 22,000.00 |
| 0123 | NS-713-00008 | Portable Changeable Message Sign | 2 | EACH | 13,500.00 | 27,000.00 | 15,000.00 | 30,000.00 | 2,000.00 | 4,000.00 | 25,000.00 | 50,000.00 |
| 0124 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 14.05 | MILE | 495.00 | 6,954.75 | 400.00 | 5,620.00 | 300.00 | 4,215.00 | 500.00 | 7,025.00 |
| 0125 | NS-800-00120 | Pier Protection System (Vehicle) | 2 | EACH | 56,000.00 | 112,000.00 | 50,000.00 | 100,000.00 | 34,000.00 | 68,000.00 | 57,000.00 | 114,000.00 |
| 0126 | NS-804-00001 | Vibration Monitoring Dumplin Creek Bridges | 30 | EACH | 460.00 | 13,800.00 | 440.00 | 13,200.00 | 250.00 | 7,500.00 | 400.00 | 12,000.00 |
| 0127 | NS-MSC-00120 | Drainage Structure Catch Basin Cap | 5 | EACH | 1,200.00 | 6,000.00 | 1,000.00 | 5,000.00 | 1,700.00 | 8,500.00 | 2,000.00 | 10,000.00 |
| 0128 | 203-02-00100 | Drainage Excavation | 11,280 | CUYD | 14.00 | 157,920.00 | 11.00 | 124,080.00 | 21.00 | 236,880.00 | 12.00 | 135,360.00 |
| 0129 | 732-03-04000 | Plastic Pavement Striping (Broken Line) (7" Width) (Preformed Tape) (Retroreflectivity Level I) Contrast | 0.38 | MILE | 4,000.00 | 1,520.00 | 8,000.00 | 3,040.00 | 7,000.00 | 2,660.00 | 7,500.00 | 2,850.00 |
| 0130 | 730-02-01000 | Conduit with Conductors (Supp Descr Req) (4/c SOOW Cable, AWG#14, Type XHHW-2) | 800 | LNFT | 4.00 | 3,200.00 | 4.00 | 3,200.00 | 2.85 | 2,280.00 | 3.00 | 2,400.00 |
| 0131 | 730-02-01020 | Conduit with Conductors (PVC/HDPE) (3/4") (Empy Conduit; Drain for Barrier Junction Box) | 40 | LNFT | 9.00 | 360.00 | 8.50 | 340.00 | 3.65 | 146.00 | 4.00 | 160.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 26,496,841.52 | 26,998,414.00 | 27,421,736.22 | 30,332,550.64 | ||||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 1,825,000.00 | 2,100,000.00 | 2,050,000.00 | 2,745,000.00 | ||||||||
| TOTAL BID | 28,321,841.52 | 29,098,414.00 | 29,471,736.22 | 33,077,550.64 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Barber Bros. Contracting Co., L.L.C |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 85,000.00 | 85,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 135,000.00 | 135,000.00 |
| 0003 | 202-02-00010 | Removal of Cross-Drain Headwalls | 13 | EACH | 2,000.00 | 26,000.00 |
| 0004 | 202-02-00020 | Removal of Concrete Pad | 3,260.44 | SQYD | 10.00 | 32,604.40 |
| 0005 | 202-02-02040 | Removal of Asphalt Surfacing from Bridge Deck | 400 | SQYD | 15.00 | 6,000.00 |
| 0006 | 202-02-06000 | Removal of Concrete Approach Slabs | 424 | SQYD | 50.00 | 21,200.00 |
| 0007 | 202-02-06060 | Removal of Concrete Catch Basin Includes Pad | 14 | EACH | 500.00 | 7,000.00 |
| 0008 | 202-02-14500 | Removal of Guard Rail | 2,812.8 | LNFT | 5.00 | 14,064.00 |
| 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) End Joints of Median Cross Drains | 104 | LNFT | 35.00 | 3,640.00 |
| 0010 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 16,756.44 | SQYD | 12.00 | 201,077.28 |
| 0011 | 202-02-38220 | Removal of Sign Supports | 24 | EACH | 300.00 | 7,200.00 |
| 0012 | 202-02-38300 | Removal of Sign and U-Channel Post | 8 | EACH | 350.00 | 2,800.00 |
| 0013 | 202-02-38360 | Removal of Sign Faces | 25 | EACH | 600.00 | 15,000.00 |
| 0014 | 202-02-38500 | Removal of Surfacing and Stablized Base | 35,360.46 | SQYD | 6.00 | 212,162.76 |
| 0015 | 203-01-00100 | General Excavation | 18,070.91 | CUYD | 10.50 | 189,744.56 |
| 0016 | 203-03-00100 | Embankment | 41,527.38 | CUYD | 18.00 | 747,492.84 |
| 0017 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,343.1 | CUYD | 25.00 | 83,577.50 |
| 0018 | 204-02-00100 | Temporary Hay or Straw Bales | 372 | EACH | 22.00 | 8,184.00 |
| 0019 | 204-06-00100 | Temporary Silt Fencing | 36,715 | LNFT | 2.00 | 73,430.00 |
| 0020 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 140,134.9 | SQYD | 12.00 | 1,681,618.80 |
| 0021 | 302-02-03020 | Class II Base Course (8" Thick) (Soil Cement) | 140,134.9 | SQYD | 12.00 | 1,681,618.80 |
| 0022 | 304-05-00100 | Lime Treatment (Type E) | 1,978.3 | TON | 360.00 | 712,188.00 |
| 0023 | 501-01-00006 | Thin Asphaltic Concrete (OGFC) | 10,808.75 | TON | 145.00 | 1,567,268.75 |
| 0024 | 501-02-00001 | Tack Coat | 39,525.67 | GAL | 4.00 | 158,102.68 |
| 0025 | 502-01-00100 | Superpave Asphaltic Concrete | 119,385.99 | TON | 85.00 | 10,147,809.15 |
| 0026 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 354.14 | TON | 140.00 | 49,579.60 |
| 0027 | 509-01-00100 | Cold Planing Asphaltic Pavement | 73,418.47 | SQYD | 3.50 | 256,964.65 |
| 0028 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,934.52 | CUYD | 0.00 | 0.00 |
| 0029 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,063 | LNFT | 70.00 | 74,410.00 |
| 0030 | 702-03-00100 | Catch Basins (CB-01) | 8 | EACH | 3,500.00 | 28,000.00 |
| 0031 | 703-01-00100 | Shoulder Underdrain Systems | 3,750 | LNFT | 12.00 | 45,000.00 |
| 0032 | 703-02-00100 | Shoulder Outlet Underdrains | 32 | EACH | 900.00 | 28,800.00 |
| 0033 | 703-03-00100 | Perforated Pipe Underdrains | 165 | LNFT | 35.00 | 5,775.00 |
| 0034 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 200 | LNFT | 55.00 | 11,000.00 |
| 0035 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 31.25 | LNFT | 75.00 | 2,343.75 |
| 0036 | 704-03-00100 | Blocked Out Guard Rail | 1,288 | LNFT | 35.00 | 45,080.00 |
| 0037 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 12.5 | LNFT | 115.00 | 1,437.50 |
| 0038 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 36 | LNFT | 60.00 | 2,160.00 |
| 0039 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 206.25 | LNFT | 70.00 | 14,437.50 |
| 0040 | 704-11-00100 | Guard Rail End Treatment (Flared) | 7 | EACH | 3,000.00 | 21,000.00 |
| 0041 | 705-09-00100 | Rebuilt Fence | 300 | LNFT | 25.00 | 7,500.00 |
| 0042 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 411 | SQYD | 85.00 | 34,935.00 |
| 0043 | 707-01-00100 | Concrete Curb | 70 | LNFT | 50.00 | 3,500.00 |
| 0044 | 710-01-00100 | Flowable Fill | 80.93 | CUYD | 165.00 | 13,353.45 |
| 0045 | 711-01-06000 | Riprap (250 lb, 30" Thick) | 97 | SQYD | 115.00 | 11,155.00 |
| 0046 | 711-04-00100 | Geotextile Fabric | 147 | SQYD | 6.00 | 882.00 |
| 0047 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) LA 447 Overpass Pier Prot. | 300 | SQYD | 85.00 | 25,500.00 |
| 0048 | 712-04-00100 | Flexible Revetment | 1,705 | SQYD | 65.00 | 110,825.00 |
| 0049 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 500,000.00 | 500,000.00 |
| 0050 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.49 | MILE | 400.00 | 2,596.00 |
| 0051 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) | 6.49 | MILE | 3,500.00 | 22,715.00 |
| 0052 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.2 | MILE | 400.00 | 5,280.00 |
| 0053 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) | 13.2 | MILE | 3,000.00 | 39,600.00 |
| 0054 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 26.79 | MILE | 700.00 | 18,753.00 |
| 0055 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) | 26.79 | MILE | 7,500.00 | 200,925.00 |
| 0056 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,744 | EACH | 6.00 | 10,464.00 |
| 0057 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 2,349 | EACH | 800.00 | 1,879,200.00 |
| 0058 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 842 | EACH | 320.00 | 269,440.00 |
| 0059 | 721-01-00100 | Mowing 6 Times/Yr for 2 YRS | 699 | ACRE | 75.00 | 52,425.00 |
| 0060 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 20,000.00 | 20,000.00 |
| 0061 | 725-01-00100 | Temporary Detour Roads | 5,236.78 | SQYD | 60.00 | 314,206.80 |
| 0062 | 726-01-00100 | Bedding Material | 96 | CUYD | 80.00 | 7,680.00 |
| 0063 | 727-01-00100 | Mobilization | 1 | LUMP | 2,000,000.00 | 2,000,000.00 |
| 0064 | 729-01-00100 | Sign (Type A) | 380.1 | SQFT | 35.00 | 13,303.50 |
| 0065 | 729-04-00100 | Sign (Type D) | 847.5 | SQFT | 60.00 | 50,850.00 |
| 0066 | 729-05-00100 | Sign (Type E) | 85 | SQFT | 120.00 | 10,200.00 |
| 0067 | 729-06-00100 | Sign (Overhead Mounted) | 154.9 | SQFT | 225.00 | 34,852.50 |
| 0068 | 729-08-00200 | Mounting (3 1/2" Size Post) | 10 | EACH | 600.00 | 6,000.00 |
| 0069 | 729-08-00220 | Mounting (3 1/2" Size Post)(Median Barrier Mount) | 5 | EACH | 350.00 | 1,750.00 |
| 0070 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 6 | EACH | 1,800.00 | 10,800.00 |
| 0071 | 729-08-00800 | Mounting (W8 x 24 Size Post) | 9 | EACH | 2,500.00 | 22,500.00 |
| 0072 | 729-11-00100 | Mounting (Overhead Cantilever) (Ground Mounted) | 1 | EACH | 30,000.00 | 30,000.00 |
| 0073 | 729-16-00300 | Object Marker Assembly (Type 3) | 14 | EACH | 75.00 | 1,050.00 |
| 0074 | 729-17-00100 | Milepost Assembly (Ground Mounted) | 8 | EACH | 85.00 | 680.00 |
| 0075 | 729-18-00100 | Milepost Assembly (Structure Mounted) | 8 | EACH | 300.00 | 2,400.00 |
| 0076 | 729-18-00200 | Milepost Assembly (Structure Mounted) (Secondary) | 26 | EACH | 115.00 | 2,990.00 |
| 0077 | 729-20-00600 | Footings for Overhead Mountings (Cantilever) | 1 | EACH | 30,000.00 | 30,000.00 |
| 0078 | 729-21-00100 | U-Channel Post | 8 | EACH | 70.00 | 560.00 |
| 0079 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (2#2 XHHW-2, 1#2 BARE SOLID GROUND) | 1,900 | LNFT | 9.00 | 17,100.00 |
| 0080 | 730-03-01060 | Conductors in Existing Conduit (PVC/HDPE) (1 1/4") (2#8 XHHW-2, 1#8 BARE SOLID GROUND) | 200 | LNFT | 5.00 | 1,000.00 |
| 0081 | 730-03-01060 | Conductors in Existing Conduit (PVC/HDPE) (1 1/4") (2#2 XHHW-2, 1#2 BARE SOLID GROUND) | 100 | LNFT | 10.00 | 1,000.00 |
| 0082 | 730-03-01080 | Conductors in Existing Conduit (PVC/HDPE) (1 1/2") (2#2 XHHW-2, 2#8 XHHW-2, 1#2 BARE SOLID GROUND) | 1,850 | LNFT | 10.00 | 18,500.00 |
| 0083 | 730-04-00200 | Jacked or Bored Casing (6" Diameter) (PVC/HDPE) (SCHEDULE 80) | 200 | LNFT | 35.00 | 7,000.00 |
| 0084 | 730-05-22220 | Light Pole (50') (Aluminum) (Twin Arm) (Lowering Device) (WITH LOWERING DEVICE) | 8 | EACH | 20,000.00 | 160,000.00 |
| 0085 | 730-07-06000 | Luminaire (400 Watt) (High PressureSodium) (MEDIUM, NON-CUTOFF, TYPE IV, HIGH TILT, WIDE ROADWAY, ADJUSTABLE TRUNION MOUNT) | 16 | EACH | 1,200.00 | 19,200.00 |
| 0086 | 730-09-00100 | Electrical System | 1 | LUMP | 5,000.00 | 5,000.00 |
| 0087 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 2,500.00 | 2,500.00 |
| 0088 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) (STEEL WITH BREAKAWAY TRANS. BASE, 50') | 3 | EACH | 400.00 | 1,200.00 |
| 0089 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 4 | EACH | 600.00 | 2,400.00 |
| 0090 | 730-14-00100 | Removal and Disposal of Luminaires (400W HPS) | 6 | EACH | 150.00 | 900.00 |
| 0091 | 730-16-00200 | Underground Junction Box (11" x 18") (JB-2) | 10 | EACH | 500.00 | 5,000.00 |
| 0092 | 730-16-00300 | Underground Junction Box (13" x 24") (JB-3) | 1 | EACH | 450.00 | 450.00 |
| 0093 | 730-19-00010 | Modular Breakaway Cable System | 5 | EACH | 2,500.00 | 12,500.00 |
| 0094 | 730-21-00020 | Duct Marker (Concrete) | 3 | EACH | 300.00 | 900.00 |
| 0096 | 731-02-00100 | Reflectorized Raised Pavement Markers | 7,680 | EACH | 6.00 | 46,080.00 |
| 0097 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.45 | MILE | 3,000.00 | 43,350.00 |
| 0098 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.45 | MILE | 9,600.00 | 4,320.00 |
| 0099 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.06 | MILE | 40,000.00 | 2,400.00 |
| 0100 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 14 | MILE | 900.00 | 12,600.00 |
| 0101 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.42 | MILE | 6,000.00 | 2,520.00 |
| 0102 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 900.00 | 1,800.00 |
| 0103 | 732-05-00100 | Removal of Existing Markings | 7.03 | MILE | 4,000.00 | 28,120.00 |
| 0104 | 733-01-00200 | Concrete Roadway Barrier (Double Faced) | 16,520 | LNFT | 350.00 | 5,782,000.00 |
| 0105 | 739-01-00100 | Hydro-Seeding | 21 | ACRE | 1,200.00 | 25,200.00 |
| 0106 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 |
| 0107 | 804-01-00300 | Precast Concrete Piles (16") | 4,362 | LNFT | 70.00 | 305,340.00 |
| 0108 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 120.00 | 120.00 |
| 0109 | 804-13-00100 | Precast Concrete Indicator Piles | 1 | EACH | 32,000.00 | 32,000.00 |
| 0110 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 1,200.00 | 4,800.00 |
| 0111 | 805-01-00700 | Class A Concrete (Bents) | 150.66 | CUYD | 1,500.00 | 225,990.00 |
| 0112 | 805-03-00100 | Class AA Concrete | 763.2 | CUYD | 1,000.00 | 763,200.00 |
| 0113 | 805-09-00100 | Expansion Joint Seal | 1,750 | LNFT | 20.00 | 35,000.00 |
| 0114 | 806-01-00100 | Deformed Reinforcing Steel | 225,913 | LB | 1.60 | 361,460.80 |
| 0115 | 810-01-00100 | Concrete Railing (Standard Barrier) | 1,120 | LNFT | 80.00 | 89,600.00 |
| 0116 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 400 | LNFT | 85.00 | 34,000.00 |
| 0117 | 813-01-00100 | Concrete Approach Slabs | 2,674.88 | SQYD | 250.00 | 668,720.00 |
| 0118 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 304,040 | INLF | 0.70 | 212,828.00 |
| 0119 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 55,064 | INLF | 2.00 | 110,128.00 |
| 0120 | NS-700-00180 | Impact Attenuator (Construction Zone) | 15 | EACH | 22,000.00 | 330,000.00 |
| 0121 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 4 | EACH | 22,000.00 | 88,000.00 |
| 0122 | NS-700-00220 | Impact Attenuator (Kinetic) | 1 | EACH | 22,500.00 | 22,500.00 |
| 0123 | NS-713-00008 | Portable Changeable Message Sign | 2 | EACH | 25,000.00 | 50,000.00 |
| 0124 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 14.05 | MILE | 500.00 | 7,025.00 |
| 0125 | NS-800-00120 | Pier Protection System (Vehicle) | 2 | EACH | 3,000.00 | 6,000.00 |
| 0126 | NS-804-00001 | Vibration Monitoring Dumplin Creek Bridges | 30 | EACH | 500.00 | 15,000.00 |
| 0127 | NS-MSC-00120 | Drainage Structure Catch Basin Cap | 5 | EACH | 3,000.00 | 15,000.00 |
| 0128 | 203-02-00100 | Drainage Excavation | 11,280 | CUYD | 12.00 | 135,360.00 |
| 0129 | 732-03-04000 | Plastic Pavement Striping (Broken Line) (7" Width) (Preformed Tape) (Retroreflectivity Level I) Contrast | 0.38 | MILE | 8,000.00 | 3,040.00 |
| 0130 | 730-02-01000 | Conduit with Conductors (Supp Descr Req) (4/c SOOW Cable, AWG#14, Type XHHW-2) | 800 | LNFT | 4.00 | 3,200.00 |
| 0131 | 730-02-01020 | Conduit with Conductors (PVC/HDPE) (3/4") (Empy Conduit; Drain for Barrier Junction Box) | 40 | LNFT | 9.00 | 360.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 33,971,354.57 | |||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 3,750,000.00 | |||||
| TOTAL BID | 37,721,354.57 | |||||