LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.009836.6
Parish: Livingston
Routes: I-12
Description: I-12:Walker to 0.5M W of Satsuma
Type Const: CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost: $27,013,352.23
Maximum Number of Days Allowed for Construction: 9999
Calculated Daily User Cost: $5,000.00


RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 12312 Gilchrist Construction Co. LLC $26,496,841.52 365 $28,321,841.52
2 06276 Barriere Construction Co., LLC. $26,998,414.00 420 $29,098,414.00
3 34567 James Construction Group LLC $27,421,736.22 410 $29,471,736.22
4 12487 Diamond B Construction Co., L.L.C. $30,332,550.64 549 $33,077,550.64
5 00046 Barber Bros. Contracting Co., L.L.C $33,971,354.57 750 $37,721,354.57


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Gilchrist Construction Co. LLC
- 2 -
Barriere Construction Co., LLC.
- 3 -
James Construction Group LLC
- 4 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 250,000.00 250,000.00 62,000.00 62,000.00 200,000.00 200,000.00 100,000.00 100,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 50,000.00 50,000.00 110,000.00 110,000.00 100,000.00 100,000.00 250,000.00 250,000.00
0003 202-02-00010 Removal of Cross-Drain Headwalls 13      EACH 650.00 8,450.00 1,000.00 13,000.00 800.00 10,400.00 1,500.00 19,500.00
0004 202-02-00020 Removal of Concrete Pad 3,260.44   SQYD 6.00 19,562.64 1.00 3,260.44 3.00 9,781.32 15.00 48,906.60
0005 202-02-02040 Removal of Asphalt Surfacing from Bridge Deck 400      SQYD 10.00 4,000.00 1.00 400.00 10.00 4,000.00 10.00 4,000.00
0006 202-02-06000 Removal of Concrete Approach Slabs 424      SQYD 29.00 12,296.00 15.00 6,360.00 60.00 25,440.00 30.00 12,720.00
0007 202-02-06060 Removal of Concrete Catch Basin Includes Pad 14      EACH 650.00 9,100.00 100.00 1,400.00 1,200.00 16,800.00 2,000.00 28,000.00
0008 202-02-14500 Removal of Guard Rail 2,812.8    LNFT 3.00 8,438.40 7.50 21,096.00 4.75 13,360.80 15.00 42,192.00
0009 202-02-32100 Removal of Pipe (Cross Drain) End Joints of Median Cross Drains 104      LNFT 40.00 4,160.00 30.00 3,120.00 29.00 3,016.00 40.00 4,160.00
0010 202-02-32500 Removal of Portland Cement Concrete Pavement 16,756.44   SQYD 9.00 150,807.96 5.00 83,782.20 10.00 167,564.40 20.00 335,128.80
0011 202-02-38220 Removal of Sign Supports 24      EACH 290.00 6,960.00 290.00 6,960.00 260.00 6,240.00 300.00 7,200.00
0012 202-02-38300 Removal of Sign and U-Channel Post 8      EACH 30.00 240.00 11.00 88.00 10.00 80.00 12.00 96.00
0013 202-02-38360 Removal of Sign Faces 25      EACH 175.00 4,375.00 210.00 5,250.00 190.00 4,750.00 200.00 5,000.00
0014 202-02-38500 Removal of Surfacing and Stablized Base 35,360.46   SQYD 3.00 106,081.38 8.00 282,883.68 3.00 106,081.38 6.00 212,162.76
0015 203-01-00100 General Excavation 18,070.91   CUYD 2.00 36,141.82 15.00 271,063.65 2.50 45,177.28 3.00 54,212.73
0016 203-03-00100 Embankment 41,527.38   CUYD 15.00 622,910.70 17.00 705,965.46 21.00 872,074.98 14.00 581,383.32
0017 203-07-00100 Borrow (Vehicular Measurement) 3,343.1    CUYD 18.00 60,175.80 25.00 83,577.50 12.00 40,117.20 20.00 66,862.00
0018 204-02-00100 Temporary Hay or Straw Bales 372      EACH 20.00 7,440.00 5.00 1,860.00 15.00 5,580.00 50.00 18,600.00
0019 204-06-00100 Temporary Silt Fencing 36,715      LNFT 1.90 69,758.50 0.20 7,343.00 2.50 91,787.50 4.00 146,860.00
0020 302-02-01060 Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) 140,134.9    SQYD 6.25 875,843.13 7.00 980,944.30 8.50 1,191,146.65 12.00 1,681,618.80
0021 302-02-03020 Class II Base Course (8" Thick) (Soil Cement) 140,134.9    SQYD 10.50 1,471,416.45 12.00 1,681,618.80 12.50 1,751,686.25 10.00 1,401,349.00
0022 304-05-00100 Lime Treatment (Type E) 1,978.3    TON 45.00 89,023.50 20.00 39,566.00 5.00 9,891.50 245.00 484,683.50
0023 501-01-00006 Thin Asphaltic Concrete (OGFC) 10,808.75   TON 130.00 1,405,137.50 110.00 1,188,962.50 110.00 1,188,962.50 124.00 1,340,285.00
0024 501-02-00001 Tack Coat 39,525.67   GAL 3.70 146,244.98 3.25 128,458.43 3.00 118,577.01 3.50 138,339.85
0025 502-01-00100 Superpave Asphaltic Concrete 119,385.99   TON 77.00 9,192,721.23 77.00 9,192,721.23 77.00 9,192,721.23 75.00 8,953,949.25
0026 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 354.14   TON 175.00 61,974.50 125.00 44,267.50 196.83 69,705.38 190.00 67,286.60
0027 509-01-00100 Cold Planing Asphaltic Pavement 73,418.47   SQYD 1.90 139,495.09 2.00 146,836.94 3.00 220,255.41 3.60 264,306.49
0028 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -2,934.52   CUYD 1.00 -2,934.52 1.00 -2,934.52 0.01 -29.35 1.00 -2,934.52
0029 701-03-01020 Storm Drain Pipe (18" RCP/PP) 1,063      LNFT 60.00 63,780.00 70.00 74,410.00 55.00 58,465.00 78.00 82,914.00
0030 702-03-00100 Catch Basins (CB-01) 8      EACH 3,000.00 24,000.00 7,000.00 56,000.00 3,200.00 25,600.00 3,000.00 24,000.00
0031 703-01-00100 Shoulder Underdrain Systems 3,750      LNFT 10.00 37,500.00 10.00 37,500.00 8.00 30,000.00 20.00 75,000.00
0032 703-02-00100 Shoulder Outlet Underdrains 32      EACH 1,300.00 41,600.00 500.00 16,000.00 485.00 15,520.00 400.00 12,800.00
0033 703-03-00100 Perforated Pipe Underdrains 165      LNFT 24.00 3,960.00 20.00 3,300.00 7.00 1,155.00 17.00 2,805.00
0034 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 200      LNFT 40.00 8,000.00 50.00 10,000.00 39.00 7,800.00 42.00 8,400.00
0035 704-01-02000 Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) 31.25   LNFT 45.00 1,406.25 65.00 2,031.25 50.00 1,562.50 55.00 1,718.75
0036 704-03-00100 Blocked Out Guard Rail 1,288      LNFT 23.00 29,624.00 22.00 28,336.00 17.00 21,896.00 18.00 23,184.00
0037 704-06-00200 Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) 12.5    LNFT 85.00 1,062.50 110.00 1,375.00 80.00 1,000.00 85.00 1,062.50
0038 704-07-00200 Guard Rail Bridge Attachments (Single Thrie Beam) 36      LNFT 30.00 1,080.00 1.00 36.00 1.00 36.00 1.00 36.00
0039 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 206.25   LNFT 63.00 12,993.75 90.00 18,562.50 65.00 13,406.25 70.00 14,437.50
0040 704-11-00100 Guard Rail End Treatment (Flared) 7      EACH 2,800.00 19,600.00 2,600.00 18,200.00 2,000.00 14,000.00 2,200.00 15,400.00
0041 705-09-00100 Rebuilt Fence 300      LNFT 28.00 8,400.00 10.00 3,000.00 25.00 7,500.00 28.00 8,400.00
0042 706-03-00100 Incidental Concrete Paving (4" Thick) 411      SQYD 85.00 34,935.00 70.00 28,770.00 45.00 18,495.00 85.00 34,935.00
0043 707-01-00100 Concrete Curb 70      LNFT 60.00 4,200.00 20.00 1,400.00 19.00 1,330.00 40.00 2,800.00
0044 710-01-00100 Flowable Fill 80.93   CUYD 160.00 12,948.80 250.00 20,232.50 145.00 11,734.85 140.00 11,330.20
0045 711-01-06000 Riprap (250 lb, 30" Thick) 97      SQYD 115.00 11,155.00 140.00 13,580.00 265.00 25,705.00 125.00 12,125.00
0046 711-04-00100 Geotextile Fabric 147      SQYD 5.00 735.00 4.50 661.50 3.00 441.00 5.00 735.00
0047 712-01-00100 Concrete Cast-in-Place Revetment (4" Thick) LA 447 Overpass Pier Prot. 300      SQYD 130.00 39,000.00 110.00 33,000.00 68.00 20,400.00 85.00 25,500.00
0048 712-04-00100 Flexible Revetment 1,705      SQYD 48.00 81,840.00 62.00 105,710.00 79.00 134,695.00 65.00 110,825.00
0049 713-01-00100 Temporary Signs and Barricades 1      LUMP 510,000.00 510,000.00 100,000.00 100,000.00 35,000.00 35,000.00 250,000.00 250,000.00
0050 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 6.49   MILE 240.00 1,557.60 170.00 1,103.30 232.00 1,505.68 175.00 1,135.75
0051 713-03-01020 Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) 6.49   MILE 3,400.00 22,066.00 2,200.00 14,278.00 4,000.00 25,960.00 5,500.00 35,695.00
0052 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 13.2    MILE 545.00 7,194.00 390.00 5,148.00 350.00 4,620.00 375.00 4,950.00
0053 713-03-02020 Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) 13.2    MILE 4,600.00 60,720.00 2,800.00 36,960.00 2,500.00 33,000.00 2,700.00 35,640.00
0054 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 26.79   MILE 630.00 16,877.70 550.00 14,734.50 550.00 14,734.50 600.00 16,074.00
0055 713-04-01020 Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) 26.79   MILE 100.00 2,679.00 7,200.00 192,888.00 6,500.00 174,135.00 7,000.00 187,530.00
0056 713-06-00100 Temporary Reflectorized Raised Pavement Markers 1,744      EACH 6.00 10,464.00 5.50 9,592.00 4.75 8,284.00 5.00 8,720.00
0057 713-07-00100 Temporary Precast Concrete Barrier (Contractor Furnished) 2,349      EACH 325.00 763,425.00 300.00 704,700.00 270.00 634,230.00 775.00 1,820,475.00
0058 713-10-00100 Temporary Precast Concrete Barrier Movement 842      EACH 25.00 21,050.00 20.00 16,840.00 22.00 18,524.00 50.00 42,100.00
0059 721-01-00100 Mowing 6 Times/Yr for 2 YRS 699      ACRE 60.00 41,940.00 60.00 41,940.00 59.50 41,590.50 75.00 52,425.00
0060 722-01-00100 Project Site Laboratory 1      EACH 15,000.00 15,000.00 50,000.00 50,000.00 20,000.00 20,000.00 11,000.00 11,000.00
0061 725-01-00100 Temporary Detour Roads 5,236.78   SQYD 64.00 335,153.92 100.00 523,678.00 100.00 523,678.00 62.00 324,680.36
0062 726-01-00100 Bedding Material 96      CUYD 70.00 6,720.00 70.00 6,720.00 55.00 5,280.00 100.00 9,600.00
0063 727-01-00100 Mobilization 1      LUMP 2,550,000.00 2,550,000.00 1,809,000.00 1,809,000.00 2,146,700.00 2,146,700.00 2,100,000.00 2,100,000.00
0064 729-01-00100 Sign (Type A) 380.1    SQFT 22.00 8,362.20 19.00 7,221.90 20.00 7,602.00 19.00 7,221.90
0065 729-04-00100 Sign (Type D) 847.5    SQFT 22.00 18,645.00 34.00 28,815.00 20.00 16,950.00 33.00 27,967.50
0066 729-05-00100 Sign (Type E) 85      SQFT 28.00 2,380.00 34.00 2,890.00 25.00 2,125.00 33.00 2,805.00
0067 729-06-00100 Sign (Overhead Mounted) 154.9    SQFT 34.00 5,266.60 33.00 5,111.70 30.00 4,647.00 33.00 5,111.70
0068 729-08-00200 Mounting (3 1/2" Size Post) 10      EACH 920.00 9,200.00 950.00 9,500.00 800.00 8,000.00 900.00 9,000.00
0069 729-08-00220 Mounting (3 1/2" Size Post)(Median Barrier Mount) 5      EACH 2,800.00 14,000.00 1,000.00 5,000.00 2,500.00 12,500.00 1,000.00 5,000.00
0070 729-08-00600 Mounting (W6 x 12 Size Post) 6      EACH 1,000.00 6,000.00 1,800.00 10,800.00 900.00 5,400.00 1,800.00 10,800.00
0071 729-08-00800 Mounting (W8 x 24 Size Post) 9      EACH 1,700.00 15,300.00 2,800.00 25,200.00 1,500.00 13,500.00 2,600.00 23,400.00
0072 729-11-00100 Mounting (Overhead Cantilever) (Ground Mounted) 1      EACH 30,000.00 30,000.00 37,000.00 37,000.00 28,500.00 28,500.00 35,000.00 35,000.00
0073 729-16-00300 Object Marker Assembly (Type 3) 14      EACH 75.00 1,050.00 84.00 1,176.00 75.00 1,050.00 85.00 1,190.00
0074 729-17-00100 Milepost Assembly (Ground Mounted) 8      EACH 170.00 1,360.00 500.00 4,000.00 150.00 1,200.00 475.00 3,800.00
0075 729-18-00100 Milepost Assembly (Structure Mounted) 8      EACH 285.00 2,280.00 220.00 1,760.00 250.00 2,000.00 210.00 1,680.00
0076 729-18-00200 Milepost Assembly (Structure Mounted) (Secondary) 26      EACH 285.00 7,410.00 220.00 5,720.00 250.00 6,500.00 215.00 5,590.00
0077 729-20-00600 Footings for Overhead Mountings (Cantilever) 1      EACH 32,000.00 32,000.00 40,000.00 40,000.00 24,000.00 24,000.00 40,000.00 40,000.00
0078 729-21-00100 U-Channel Post 8      EACH 85.00 680.00 78.00 624.00 75.00 600.00 75.00 600.00
0079 730-02-01100 Conduit with Conductors (PVC/HDPE) (2") (2#2 XHHW-2, 1#2 BARE SOLID GROUND) 1,900      LNFT 9.60 18,240.00 9.00 17,100.00 8.50 16,150.00 9.00 17,100.00
0080 730-03-01060 Conductors in Existing Conduit (PVC/HDPE) (1 1/4") (2#8 XHHW-2, 1#8 BARE SOLID GROUND) 200      LNFT 2.40 480.00 4.50 900.00 2.10 420.00 2.25 450.00
0081 730-03-01060 Conductors in Existing Conduit (PVC/HDPE) (1 1/4") (2#2 XHHW-2, 1#2 BARE SOLID GROUND) 100      LNFT 9.60 960.00 9.00 900.00 8.60 860.00 9.00 900.00
0082 730-03-01080 Conductors in Existing Conduit (PVC/HDPE) (1 1/2") (2#2 XHHW-2, 2#8 XHHW-2, 1#2 BARE SOLID GROUND) 1,850      LNFT 7.40 13,690.00 9.00 16,650.00 6.40 11,840.00 7.00 12,950.00
0083 730-04-00200 Jacked or Bored Casing (6" Diameter) (PVC/HDPE) (SCHEDULE 80) 200      LNFT 44.00 8,800.00 32.00 6,400.00 38.50 7,700.00 40.00 8,000.00
0084 730-05-22220 Light Pole (50') (Aluminum) (Twin Arm) (Lowering Device) (WITH LOWERING DEVICE) 8      EACH 16,000.00 128,000.00 18,000.00 144,000.00 14,810.00 118,480.00 15,500.00 124,000.00
0085 730-07-06000 Luminaire (400 Watt) (High PressureSodium) (MEDIUM, NON-CUTOFF, TYPE IV, HIGH TILT, WIDE ROADWAY, ADJUSTABLE TRUNION MOUNT) 16      EACH 1,000.00 16,000.00 1,100.00 17,600.00 950.00 15,200.00 1,000.00 16,000.00
0086 730-09-00100 Electrical System 1      LUMP 7,500.00 7,500.00 4,600.00 4,600.00 7,000.00 7,000.00 7,500.00 7,500.00
0087 730-11-00100 Removal and Disposal of Electrical Equipment 1      LUMP 2,400.00 2,400.00 2,000.00 2,000.00 2,000.00 2,000.00 2,400.00 2,400.00
0088 730-12-00100 Removal and Storage of Light Poles (Ground Mounted) (STEEL WITH BREAKAWAY TRANS. BASE, 50') 3      EACH 625.00 1,875.00 310.00 930.00 545.00 1,635.00 600.00 1,800.00
0089 730-13-00100 Removal and Disposal of Light Pole Foundation 4      EACH 950.00 3,800.00 560.00 2,240.00 830.00 3,320.00 900.00 3,600.00
0090 730-14-00100 Removal and Disposal of Luminaires (400W HPS) 6      EACH 45.00 270.00 110.00 660.00 40.00 240.00 45.00 270.00
0091 730-16-00200 Underground Junction Box (11" x 18") (JB-2) 10      EACH 585.00 5,850.00 470.00 4,700.00 510.00 5,100.00 550.00 5,500.00
0092 730-16-00300 Underground Junction Box (13" x 24") (JB-3) 1      EACH 1,200.00 1,200.00 430.00 430.00 1,070.00 1,070.00 1,100.00 1,100.00
0093 730-19-00010 Modular Breakaway Cable System 5      EACH 2,100.00 10,500.00 2,200.00 11,000.00 1,900.00 9,500.00 2,000.00 10,000.00
0094 730-21-00020 Duct Marker (Concrete) 3      EACH 200.00 600.00 290.00 870.00 180.00 540.00 200.00 600.00
0096 731-02-00100 Reflectorized Raised Pavement Markers 7,680      EACH 6.00 46,080.00 5.00 38,400.00 4.75 36,480.00 5.00 38,400.00
0097 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 14.45   MILE 3,100.00 44,795.00 2,800.00 40,460.00 2,750.00 39,737.50 3,000.00 43,350.00
0098 732-02-02040 Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) 0.45   MILE 7,500.00 3,375.00 9,000.00 4,050.00 8,500.00 3,825.00 9,000.00 4,050.00
0099 732-02-02080 Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) 0.06   MILE 55,000.00 3,300.00 37,000.00 2,220.00 35,000.00 2,100.00 37,000.00 2,220.00
0100 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 14      MILE 980.00 13,720.00 900.00 12,600.00 800.00 11,200.00 900.00 12,600.00
0101 732-03-02040 Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) 0.42   MILE 3,400.00 1,428.00 4,200.00 1,764.00 4,000.00 1,680.00 4,400.00 1,848.00
0102 732-04-01120 Plastic Pavement Legends and Symbols (Arrow - Merge) 2      EACH 6,900.00 13,800.00 900.00 1,800.00 800.00 1,600.00 800.00 1,600.00
0103 732-05-00100 Removal of Existing Markings 7.03   MILE 285.00 2,003.55 4,000.00 28,120.00 3,500.00 24,605.00 4,000.00 28,120.00
0104 733-01-00200 Concrete Roadway Barrier (Double Faced) 16,520      LNFT 240.00 3,964,800.00 270.00 4,460,400.00 265.00 4,377,800.00 285.00 4,708,200.00
0105 739-01-00100 Hydro-Seeding 21      ACRE 1,300.00 27,300.00 1,100.00 23,100.00 1,050.00 22,050.00 1,200.00 25,200.00
0106 740-01-00100 Construction Layout 1      LUMP 125,000.00 125,000.00 100,000.00 100,000.00 120,000.00 120,000.00 415,000.00 415,000.00
0107 804-01-00300 Precast Concrete Piles (16") 4,362      LNFT 48.00 209,376.00 69.00 300,978.00 50.00 218,100.00 70.00 305,340.00
0108 804-12-00100 Loading Permanent Piles 1      EACH 2,000.00 2,000.00 110.00 110.00 5,000.00 5,000.00 50.00 50.00
0109 804-13-00100 Precast Concrete Indicator Piles 1      EACH 15,000.00 15,000.00 31,000.00 31,000.00 60,000.00 60,000.00 28,000.00 28,000.00
0110 804-17-00100 Dynamic Monitoring 4      EACH 1,000.00 4,000.00 1,100.00 4,400.00 1,100.00 4,400.00 1,000.00 4,000.00
0111 805-01-00700 Class A Concrete (Bents) 150.66   CUYD 1,200.00 180,792.00 1,400.00 210,924.00 1,200.00 180,792.00 1,400.00 210,924.00
0112 805-03-00100 Class AA Concrete 763.2    CUYD 750.00 572,400.00 850.00 648,720.00 700.00 534,240.00 800.00 610,560.00
0113 805-09-00100 Expansion Joint Seal 1,750      LNFT 10.00 17,500.00 20.00 35,000.00 25.00 43,750.00 20.00 35,000.00
0114 806-01-00100 Deformed Reinforcing Steel 225,913      LB 0.68 153,620.84 1.50 338,869.50 1.60 361,460.80 1.50 338,869.50
0115 810-01-00100 Concrete Railing (Standard Barrier) 1,120      LNFT 65.00 72,800.00 81.00 90,720.00 60.00 67,200.00 80.00 89,600.00
0116 810-01-00200 Concrete Railing (Slotted Barrier) 400      LNFT 65.00 26,000.00 83.00 33,200.00 64.00 25,600.00 80.00 32,000.00
0117 813-01-00100 Concrete Approach Slabs 2,674.88   SQYD 195.00 521,601.60 240.00 641,971.20 210.00 561,724.80 240.00 641,971.20
0118 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 304,040      INLF 0.05 15,202.00 0.01 3,040.40 0.65 197,626.00 0.60 182,424.00
0119 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 55,064      INLF 0.10 5,506.40 0.01 550.64 0.85 46,804.40 0.65 35,791.60
0120 NS-700-00180 Impact Attenuator (Construction Zone) 15      EACH 7,500.00 112,500.00 10,000.00 150,000.00 12,000.00 180,000.00 10,000.00 150,000.00
0121 NS-700-00181 Impact Attenuator Relocation (Construction Zone) 4      EACH 1,900.00 7,600.00 1,300.00 5,200.00 9,500.00 38,000.00 1,500.00 6,000.00
0122 NS-700-00220 Impact Attenuator (Kinetic) 1      EACH 20,000.00 20,000.00 21,000.00 21,000.00 23,000.00 23,000.00 22,000.00 22,000.00
0123 NS-713-00008 Portable Changeable Message Sign 2      EACH 13,500.00 27,000.00 15,000.00 30,000.00 2,000.00 4,000.00 25,000.00 50,000.00
0124 NS-724-00002 Rumble Strips (Shoulder Ground-In) 14.05   MILE 495.00 6,954.75 400.00 5,620.00 300.00 4,215.00 500.00 7,025.00
0125 NS-800-00120 Pier Protection System (Vehicle) 2      EACH 56,000.00 112,000.00 50,000.00 100,000.00 34,000.00 68,000.00 57,000.00 114,000.00
0126 NS-804-00001 Vibration Monitoring Dumplin Creek Bridges 30      EACH 460.00 13,800.00 440.00 13,200.00 250.00 7,500.00 400.00 12,000.00
0127 NS-MSC-00120 Drainage Structure Catch Basin Cap 5      EACH 1,200.00 6,000.00 1,000.00 5,000.00 1,700.00 8,500.00 2,000.00 10,000.00
0128 203-02-00100 Drainage Excavation 11,280      CUYD 14.00 157,920.00 11.00 124,080.00 21.00 236,880.00 12.00 135,360.00
0129 732-03-04000 Plastic Pavement Striping (Broken Line) (7" Width) (Preformed Tape) (Retroreflectivity Level I) Contrast 0.38   MILE 4,000.00 1,520.00 8,000.00 3,040.00 7,000.00 2,660.00 7,500.00 2,850.00
0130 730-02-01000 Conduit with Conductors (Supp Descr Req) (4/c SOOW Cable, AWG#14, Type XHHW-2) 800      LNFT 4.00 3,200.00 4.00 3,200.00 2.85 2,280.00 3.00 2,400.00
0131 730-02-01020 Conduit with Conductors (PVC/HDPE) (3/4") (Empy Conduit; Drain for Barrier Junction Box) 40      LNFT 9.00 360.00 8.50 340.00 3.65 146.00 4.00 160.00
                         
    ITEM TOTAL (CONSTRUCTION BID)       26,496,841.52   26,998,414.00   27,421,736.22   30,332,550.64
    NUMBER OF DAYS BID AT $5000 PER DAY.       1,825,000.00   2,100,000.00   2,050,000.00   2,745,000.00
    TOTAL BID       28,321,841.52   29,098,414.00   29,471,736.22   33,077,550.64



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Barber Bros. Contracting Co., L.L.C
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 85,000.00 85,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 135,000.00 135,000.00
0003 202-02-00010 Removal of Cross-Drain Headwalls 13      EACH 2,000.00 26,000.00
0004 202-02-00020 Removal of Concrete Pad 3,260.44   SQYD 10.00 32,604.40
0005 202-02-02040 Removal of Asphalt Surfacing from Bridge Deck 400      SQYD 15.00 6,000.00
0006 202-02-06000 Removal of Concrete Approach Slabs 424      SQYD 50.00 21,200.00
0007 202-02-06060 Removal of Concrete Catch Basin Includes Pad 14      EACH 500.00 7,000.00
0008 202-02-14500 Removal of Guard Rail 2,812.8    LNFT 5.00 14,064.00
0009 202-02-32100 Removal of Pipe (Cross Drain) End Joints of Median Cross Drains 104      LNFT 35.00 3,640.00
0010 202-02-32500 Removal of Portland Cement Concrete Pavement 16,756.44   SQYD 12.00 201,077.28
0011 202-02-38220 Removal of Sign Supports 24      EACH 300.00 7,200.00
0012 202-02-38300 Removal of Sign and U-Channel Post 8      EACH 350.00 2,800.00
0013 202-02-38360 Removal of Sign Faces 25      EACH 600.00 15,000.00
0014 202-02-38500 Removal of Surfacing and Stablized Base 35,360.46   SQYD 6.00 212,162.76
0015 203-01-00100 General Excavation 18,070.91   CUYD 10.50 189,744.56
0016 203-03-00100 Embankment 41,527.38   CUYD 18.00 747,492.84
0017 203-07-00100 Borrow (Vehicular Measurement) 3,343.1    CUYD 25.00 83,577.50
0018 204-02-00100 Temporary Hay or Straw Bales 372      EACH 22.00 8,184.00
0019 204-06-00100 Temporary Silt Fencing 36,715      LNFT 2.00 73,430.00
0020 302-02-01060 Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) 140,134.9    SQYD 12.00 1,681,618.80
0021 302-02-03020 Class II Base Course (8" Thick) (Soil Cement) 140,134.9    SQYD 12.00 1,681,618.80
0022 304-05-00100 Lime Treatment (Type E) 1,978.3    TON 360.00 712,188.00
0023 501-01-00006 Thin Asphaltic Concrete (OGFC) 10,808.75   TON 145.00 1,567,268.75
0024 501-02-00001 Tack Coat 39,525.67   GAL 4.00 158,102.68
0025 502-01-00100 Superpave Asphaltic Concrete 119,385.99   TON 85.00 10,147,809.15
0026 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 354.14   TON 140.00 49,579.60
0027 509-01-00100 Cold Planing Asphaltic Pavement 73,418.47   SQYD 3.50 256,964.65
0028 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -2,934.52   CUYD 0.00 0.00
0029 701-03-01020 Storm Drain Pipe (18" RCP/PP) 1,063      LNFT 70.00 74,410.00
0030 702-03-00100 Catch Basins (CB-01) 8      EACH 3,500.00 28,000.00
0031 703-01-00100 Shoulder Underdrain Systems 3,750      LNFT 12.00 45,000.00
0032 703-02-00100 Shoulder Outlet Underdrains 32      EACH 900.00 28,800.00
0033 703-03-00100 Perforated Pipe Underdrains 165      LNFT 35.00 5,775.00
0034 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 200      LNFT 55.00 11,000.00
0035 704-01-02000 Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) 31.25   LNFT 75.00 2,343.75
0036 704-03-00100 Blocked Out Guard Rail 1,288      LNFT 35.00 45,080.00
0037 704-06-00200 Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) 12.5    LNFT 115.00 1,437.50
0038 704-07-00200 Guard Rail Bridge Attachments (Single Thrie Beam) 36      LNFT 60.00 2,160.00
0039 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 206.25   LNFT 70.00 14,437.50
0040 704-11-00100 Guard Rail End Treatment (Flared) 7      EACH 3,000.00 21,000.00
0041 705-09-00100 Rebuilt Fence 300      LNFT 25.00 7,500.00
0042 706-03-00100 Incidental Concrete Paving (4" Thick) 411      SQYD 85.00 34,935.00
0043 707-01-00100 Concrete Curb 70      LNFT 50.00 3,500.00
0044 710-01-00100 Flowable Fill 80.93   CUYD 165.00 13,353.45
0045 711-01-06000 Riprap (250 lb, 30" Thick) 97      SQYD 115.00 11,155.00
0046 711-04-00100 Geotextile Fabric 147      SQYD 6.00 882.00
0047 712-01-00100 Concrete Cast-in-Place Revetment (4" Thick) LA 447 Overpass Pier Prot. 300      SQYD 85.00 25,500.00
0048 712-04-00100 Flexible Revetment 1,705      SQYD 65.00 110,825.00
0049 713-01-00100 Temporary Signs and Barricades 1      LUMP 500,000.00 500,000.00
0050 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 6.49   MILE 400.00 2,596.00
0051 713-03-01020 Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) 6.49   MILE 3,500.00 22,715.00
0052 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 13.2    MILE 400.00 5,280.00
0053 713-03-02020 Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) 13.2    MILE 3,000.00 39,600.00
0054 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 26.79   MILE 700.00 18,753.00
0055 713-04-01020 Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) As needed (Bridge Locations, Final layer, etc.) 26.79   MILE 7,500.00 200,925.00
0056 713-06-00100 Temporary Reflectorized Raised Pavement Markers 1,744      EACH 6.00 10,464.00
0057 713-07-00100 Temporary Precast Concrete Barrier (Contractor Furnished) 2,349      EACH 800.00 1,879,200.00
0058 713-10-00100 Temporary Precast Concrete Barrier Movement 842      EACH 320.00 269,440.00
0059 721-01-00100 Mowing 6 Times/Yr for 2 YRS 699      ACRE 75.00 52,425.00
0060 722-01-00100 Project Site Laboratory 1      EACH 20,000.00 20,000.00
0061 725-01-00100 Temporary Detour Roads 5,236.78   SQYD 60.00 314,206.80
0062 726-01-00100 Bedding Material 96      CUYD 80.00 7,680.00
0063 727-01-00100 Mobilization 1      LUMP 2,000,000.00 2,000,000.00
0064 729-01-00100 Sign (Type A) 380.1    SQFT 35.00 13,303.50
0065 729-04-00100 Sign (Type D) 847.5    SQFT 60.00 50,850.00
0066 729-05-00100 Sign (Type E) 85      SQFT 120.00 10,200.00
0067 729-06-00100 Sign (Overhead Mounted) 154.9    SQFT 225.00 34,852.50
0068 729-08-00200 Mounting (3 1/2" Size Post) 10      EACH 600.00 6,000.00
0069 729-08-00220 Mounting (3 1/2" Size Post)(Median Barrier Mount) 5      EACH 350.00 1,750.00
0070 729-08-00600 Mounting (W6 x 12 Size Post) 6      EACH 1,800.00 10,800.00
0071 729-08-00800 Mounting (W8 x 24 Size Post) 9      EACH 2,500.00 22,500.00
0072 729-11-00100 Mounting (Overhead Cantilever) (Ground Mounted) 1      EACH 30,000.00 30,000.00
0073 729-16-00300 Object Marker Assembly (Type 3) 14      EACH 75.00 1,050.00
0074 729-17-00100 Milepost Assembly (Ground Mounted) 8      EACH 85.00 680.00
0075 729-18-00100 Milepost Assembly (Structure Mounted) 8      EACH 300.00 2,400.00
0076 729-18-00200 Milepost Assembly (Structure Mounted) (Secondary) 26      EACH 115.00 2,990.00
0077 729-20-00600 Footings for Overhead Mountings (Cantilever) 1      EACH 30,000.00 30,000.00
0078 729-21-00100 U-Channel Post 8      EACH 70.00 560.00
0079 730-02-01100 Conduit with Conductors (PVC/HDPE) (2") (2#2 XHHW-2, 1#2 BARE SOLID GROUND) 1,900      LNFT 9.00 17,100.00
0080 730-03-01060 Conductors in Existing Conduit (PVC/HDPE) (1 1/4") (2#8 XHHW-2, 1#8 BARE SOLID GROUND) 200      LNFT 5.00 1,000.00
0081 730-03-01060 Conductors in Existing Conduit (PVC/HDPE) (1 1/4") (2#2 XHHW-2, 1#2 BARE SOLID GROUND) 100      LNFT 10.00 1,000.00
0082 730-03-01080 Conductors in Existing Conduit (PVC/HDPE) (1 1/2") (2#2 XHHW-2, 2#8 XHHW-2, 1#2 BARE SOLID GROUND) 1,850      LNFT 10.00 18,500.00
0083 730-04-00200 Jacked or Bored Casing (6" Diameter) (PVC/HDPE) (SCHEDULE 80) 200      LNFT 35.00 7,000.00
0084 730-05-22220 Light Pole (50') (Aluminum) (Twin Arm) (Lowering Device) (WITH LOWERING DEVICE) 8      EACH 20,000.00 160,000.00
0085 730-07-06000 Luminaire (400 Watt) (High PressureSodium) (MEDIUM, NON-CUTOFF, TYPE IV, HIGH TILT, WIDE ROADWAY, ADJUSTABLE TRUNION MOUNT) 16      EACH 1,200.00 19,200.00
0086 730-09-00100 Electrical System 1      LUMP 5,000.00 5,000.00
0087 730-11-00100 Removal and Disposal of Electrical Equipment 1      LUMP 2,500.00 2,500.00
0088 730-12-00100 Removal and Storage of Light Poles (Ground Mounted) (STEEL WITH BREAKAWAY TRANS. BASE, 50') 3      EACH 400.00 1,200.00
0089 730-13-00100 Removal and Disposal of Light Pole Foundation 4      EACH 600.00 2,400.00
0090 730-14-00100 Removal and Disposal of Luminaires (400W HPS) 6      EACH 150.00 900.00
0091 730-16-00200 Underground Junction Box (11" x 18") (JB-2) 10      EACH 500.00 5,000.00
0092 730-16-00300 Underground Junction Box (13" x 24") (JB-3) 1      EACH 450.00 450.00
0093 730-19-00010 Modular Breakaway Cable System 5      EACH 2,500.00 12,500.00
0094 730-21-00020 Duct Marker (Concrete) 3      EACH 300.00 900.00
0096 731-02-00100 Reflectorized Raised Pavement Markers 7,680      EACH 6.00 46,080.00
0097 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 14.45   MILE 3,000.00 43,350.00
0098 732-02-02040 Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) 0.45   MILE 9,600.00 4,320.00
0099 732-02-02080 Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) 0.06   MILE 40,000.00 2,400.00
0100 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 14      MILE 900.00 12,600.00
0101 732-03-02040 Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) 0.42   MILE 6,000.00 2,520.00
0102 732-04-01120 Plastic Pavement Legends and Symbols (Arrow - Merge) 2      EACH 900.00 1,800.00
0103 732-05-00100 Removal of Existing Markings 7.03   MILE 4,000.00 28,120.00
0104 733-01-00200 Concrete Roadway Barrier (Double Faced) 16,520      LNFT 350.00 5,782,000.00
0105 739-01-00100 Hydro-Seeding 21      ACRE 1,200.00 25,200.00
0106 740-01-00100 Construction Layout 1      LUMP 75,000.00 75,000.00
0107 804-01-00300 Precast Concrete Piles (16") 4,362      LNFT 70.00 305,340.00
0108 804-12-00100 Loading Permanent Piles 1      EACH 120.00 120.00
0109 804-13-00100 Precast Concrete Indicator Piles 1      EACH 32,000.00 32,000.00
0110 804-17-00100 Dynamic Monitoring 4      EACH 1,200.00 4,800.00
0111 805-01-00700 Class A Concrete (Bents) 150.66   CUYD 1,500.00 225,990.00
0112 805-03-00100 Class AA Concrete 763.2    CUYD 1,000.00 763,200.00
0113 805-09-00100 Expansion Joint Seal 1,750      LNFT 20.00 35,000.00
0114 806-01-00100 Deformed Reinforcing Steel 225,913      LB 1.60 361,460.80
0115 810-01-00100 Concrete Railing (Standard Barrier) 1,120      LNFT 80.00 89,600.00
0116 810-01-00200 Concrete Railing (Slotted Barrier) 400      LNFT 85.00 34,000.00
0117 813-01-00100 Concrete Approach Slabs 2,674.88   SQYD 250.00 668,720.00
0118 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 304,040      INLF 0.70 212,828.00
0119 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 55,064      INLF 2.00 110,128.00
0120 NS-700-00180 Impact Attenuator (Construction Zone) 15      EACH 22,000.00 330,000.00
0121 NS-700-00181 Impact Attenuator Relocation (Construction Zone) 4      EACH 22,000.00 88,000.00
0122 NS-700-00220 Impact Attenuator (Kinetic) 1      EACH 22,500.00 22,500.00
0123 NS-713-00008 Portable Changeable Message Sign 2      EACH 25,000.00 50,000.00
0124 NS-724-00002 Rumble Strips (Shoulder Ground-In) 14.05   MILE 500.00 7,025.00
0125 NS-800-00120 Pier Protection System (Vehicle) 2      EACH 3,000.00 6,000.00
0126 NS-804-00001 Vibration Monitoring Dumplin Creek Bridges 30      EACH 500.00 15,000.00
0127 NS-MSC-00120 Drainage Structure Catch Basin Cap 5      EACH 3,000.00 15,000.00
0128 203-02-00100 Drainage Excavation 11,280      CUYD 12.00 135,360.00
0129 732-03-04000 Plastic Pavement Striping (Broken Line) (7" Width) (Preformed Tape) (Retroreflectivity Level I) Contrast 0.38   MILE 8,000.00 3,040.00
0130 730-02-01000 Conduit with Conductors (Supp Descr Req) (4/c SOOW Cable, AWG#14, Type XHHW-2) 800      LNFT 4.00 3,200.00
0131 730-02-01020 Conduit with Conductors (PVC/HDPE) (3/4") (Empy Conduit; Drain for Barrier Junction Box) 40      LNFT 9.00 360.00
             
    ITEM TOTAL (CONSTRUCTION BID)       33,971,354.57
    NUMBER OF DAYS BID AT $5000 PER DAY.       3,750,000.00
    TOTAL BID       37,721,354.57