Bid Tabulations
Letting of
07/11/2012
LA DOTD Headquarters
| Lead Project: H.009831.6 | |
| Parish: District 62 | |
| Routes: | |
| Description: District 62 Controller Update | |
| Type Const: TRAFFIC SIGNALIZATION AND RELATED WORK. | |
| Estimated Construction Cost: $1,806,498.29 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08470 | Diamond Electrical Co., Inc. | $2,642,787.79 |
| 2 | 05473 | Jack B. Harper Electrical LLC | $2,671,107.94 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond Electrical Co., Inc. |
- 2 - Jack B. Harper Electrical LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 11,785.00 | 11,785.00 | 3,500.00 | 3,500.00 |
| 0002 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 5,195.00 | 5,195.00 | 1,600.00 | 1,600.00 |
| 0003 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 22,193.00 | 22,193.00 | 11,000.00 | 11,000.00 |
| 0004 | 727-01-00100 | Mobilization | 1 | LUMP | 33,495.00 | 33,495.00 | 45,000.00 | 45,000.00 |
| 0005 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,760 | EACH | 6.00 | 22,560.00 | 5.50 | 20,680.00 |
| 0006 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 20,025 | LNFT | 1.55 | 31,038.75 | 1.45 | 29,036.25 |
| 0007 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 9,060 | LNFT | 4.58 | 41,494.80 | 4.20 | 38,052.00 |
| 0008 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 62.2 | MILE | 2,802.00 | 174,284.40 | 2,575.00 | 160,165.00 |
| 0009 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.11 | MILE | 973.00 | 9,837.03 | 893.00 | 9,028.23 |
| 0010 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 28 | EACH | 234.00 | 6,552.00 | 215.00 | 6,020.00 |
| 0011 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 91 | EACH | 286.00 | 26,026.00 | 263.00 | 23,933.00 |
| 0012 | 732-04-01060 | Plastic Pavement Legends and Symbols (Arrow - Triple) | 2 | EACH | 315.00 | 630.00 | 289.00 | 578.00 |
| 0013 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 307 | EACH | 229.00 | 70,303.00 | 210.00 | 64,470.00 |
| 0014 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 99 | EACH | 245.00 | 24,255.00 | 225.00 | 22,275.00 |
| 0015 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 21 | EACH | 457.00 | 9,597.00 | 420.00 | 8,820.00 |
| 0016 | 732-05-00100 | Removal of Existing Markings | 77.82 | MILE | 2,288.00 | 178,052.16 | 2,888.00 | 224,744.16 |
| 0017 | 736-01-00100 | Trenching and Backfilling | 1,586 | LNFT | 7.80 | 12,370.80 | 4.25 | 6,740.50 |
| 0018 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 1,934 | LNFT | 22.85 | 44,191.90 | 11.45 | 22,144.30 |
| 0019 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 121 | EACH | 1,054.00 | 127,534.00 | 721.00 | 87,241.00 |
| 0020 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 27 | EACH | 1,082.00 | 29,214.00 | 722.00 | 19,494.00 |
| 0021 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 6 | EACH | 1,373.00 | 8,238.00 | 997.00 | 5,982.00 |
| 0022 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 6 | EACH | 1,580.00 | 9,480.00 | 1,140.00 | 6,840.00 |
| 0023 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 7 | EACH | 1,580.00 | 11,060.00 | 1,140.00 | 7,980.00 |
| 0024 | 736-08-00051 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 3E Cabinet)(F&I) | 45 | EACH | 17,060.00 | 767,700.00 | 19,160.00 | 862,200.00 |
| 0025 | 736-08-00060 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Exis Cabinet) (F&I) | 39 | EACH | 4,115.00 | 160,485.00 | 4,420.00 | 172,380.00 |
| 0026 | 736-08-00081 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Typ 6E Cab, Ex Bs) (F&I) | 10 | EACH | 21,720.00 | 217,200.00 | 23,905.00 | 239,050.00 |
| 0027 | 736-10-00200 | Underground Junction Box (Type E) | 30 | EACH | 526.00 | 15,780.00 | 415.00 | 12,450.00 |
| 0028 | 736-10-00300 | Underground Junction Box (Type F) | 3 | EACH | 722.00 | 2,166.00 | 475.00 | 1,425.00 |
| 0029 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 12 | LNFT | 1.65 | 19.80 | 37.00 | 444.00 |
| 0030 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 1,489 | LNFT | 2.30 | 3,424.70 | 1.65 | 2,456.85 |
| 0031 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 97 | LNFT | 3.55 | 344.35 | 1.95 | 189.15 |
| 0032 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 288 | LNFT | 1.65 | 475.20 | 1.45 | 417.60 |
| 0033 | 736-12-01040 | Conductor (2c, #14 awg) | 542 | LNFT | 1.45 | 785.90 | 1.45 | 785.90 |
| 0034 | NS-736-00001 | GPS | 94 | EACH | 858.00 | 80,652.00 | 940.00 | 88,360.00 |
| 0035 | NS-736-00005 | Video Detection Cabinet Components | 35 | EACH | 7,560.00 | 264,600.00 | 7,985.00 | 279,475.00 |
| 0036 | NS-736-00006 | Video Detection Camera | 102 | EACH | 2,150.00 | 219,300.00 | 1,825.00 | 186,150.00 |
| 0037 | NS-736-00007 | Video Detection Training | 1 | LUMP | 468.00 | 468.00 | 1.00 | 1.00 |
| CONTRACTOR TOTAL | 2,642,787.79 | 2,671,107.94 | ||||||