Bid Tabulations
Letting of
12/12/2012
LA DOTD Headquarters
| Lead Project: H.009779.6 | |
| Parish: Rapides | |
| Routes: US 167, LA 1198, LA 112 | |
| Description: PREVENT MAINT: DISTRICT 08 RAPIDES PAR. | |
| Type Const: | |
| Estimated Construction Cost: $1,116,982.81 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $1,012,279.00 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,140,819.21 |
| 3 | 05789 | D & J Construction Co., Inc. | $1,457,434.83 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Diamond B Construction Co., L.L.C. |
- 3 - D & J Construction Co., Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 119 | SQYD | 10.00 | 1,190.00 | 145.00 | 17,255.00 | 25.00 | 2,975.00 |
| 0002 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 601 | CUYD | 35.00 | 21,035.00 | 17.00 | 10,217.00 | 45.00 | 27,045.00 |
| 0003 | 502-01-00100 | Superpave Asphaltic Concrete | 6,513.8 | TON | 81.00 | 527,617.80 | 83.00 | 540,645.40 | 118.00 | 768,628.40 |
| 0004 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 195.9 | TON | 150.00 | 29,385.00 | 230.00 | 45,057.00 | 222.00 | 43,489.80 |
| 0005 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 5,514 | GAL | 4.20 | 23,158.80 | 4.25 | 23,434.50 | 5.00 | 27,570.00 |
| 0006 | 507-02-00200 | Aggregate (S2) | 8,109 | SQYD | 2.40 | 19,461.60 | 2.25 | 18,245.25 | 3.00 | 24,327.00 |
| 0007 | 507-02-00300 | Aggregate (S3) | 8,109 | SQYD | 2.20 | 17,839.80 | 2.25 | 18,245.25 | 2.50 | 20,272.50 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 36,007 | SQYD | 1.40 | 50,409.80 | 3.00 | 108,021.00 | 2.50 | 90,017.50 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,256 | CUYD | 1.00 | -1,256.00 | 15.00 | -18,840.00 | 0.10 | -125.60 |
| 0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,187 | SQYD | 73.00 | 159,651.00 | 70.00 | 153,090.00 | 125.00 | 273,375.00 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 17,000.00 | 17,000.00 |
| 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.921 | MILE | 500.00 | 960.50 | 175.00 | 336.18 | 225.00 | 432.23 |
| 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.994 | MILE | 100.00 | 299.40 | 225.00 | 673.65 | 200.00 | 598.80 |
| 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.628 | MILE | 100.00 | 962.80 | 450.00 | 4,332.60 | 400.00 | 3,851.20 |
| 0015 | 716-01-00100 | Mulch (Vegetative) | 0.8 | TON | 1,600.00 | 1,280.00 | 1,750.00 | 1,400.00 | 700.00 | 560.00 |
| 0016 | 717-01-00100 | Seeding | 12 | LB | 15.50 | 186.00 | 20.00 | 240.00 | 10.00 | 120.00 |
| 0017 | 718-01-00100 | Fertilizer | 400 | LB | 2.25 | 900.00 | 2.75 | 1,100.00 | 1.00 | 400.00 |
| 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 88,000.00 | 88,000.00 | 92,000.00 | 92,000.00 | 40,000.00 | 40,000.00 |
| 0019 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,115 | EACH | 6.00 | 6,690.00 | 4.50 | 5,017.50 | 6.00 | 6,690.00 |
| 0020 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 206 | LNFT | 1.50 | 309.00 | 1.00 | 206.00 | 4.00 | 824.00 |
| 0021 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,332 | LNFT | 5.00 | 6,660.00 | 3.00 | 3,996.00 | 5.00 | 6,660.00 |
| 0022 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 13 | LNFT | 5.50 | 71.50 | 4.00 | 52.00 | 5.00 | 65.00 |
| 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.83 | MILE | 2,600.00 | 15,158.00 | 2,150.00 | 12,534.50 | 3,000.00 | 17,490.00 |
| 0024 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.545 | MILE | 940.00 | 2,392.30 | 625.00 | 1,590.63 | 1,000.00 | 2,545.00 |
| 0025 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 235.00 | 705.00 | 175.00 | 525.00 | 600.00 | 1,800.00 |
| 0026 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 250.00 | 750.00 | 175.00 | 525.00 | 600.00 | 1,800.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 6,200.00 | 6,200.00 | 11,000.00 | 11,000.00 |
| 0028 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 425 | LNFT | 4.00 | 1,700.00 | 10.00 | 4,250.00 | 12.00 | 5,100.00 |
| 0029 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 425 | LNFT | 2.50 | 1,062.50 | 5.75 | 2,443.75 | 6.00 | 2,550.00 |
| 0030 | NS-500-00280 | Surface Preparation | 1 | LUMP | 7,000.00 | 7,000.00 | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 |
| 0031 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 59,352 | INLF | 0.20 | 11,870.40 | 0.50 | 29,676.00 | 0.25 | 14,838.00 |
| 0032 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 384 | INLF | 3.20 | 1,228.80 | 75.00 | 28,800.00 | 4.00 | 1,536.00 |
| 0033 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 0.5 | MILE | 1,200.00 | 600.00 | 5,100.00 | 2,550.00 | 8,000.00 | 4,000.00 |
| CONTRACTOR TOTAL | 1,012,279.00 | 1,140,819.21 | 1,457,434.83 | |||||||