Bid Tabulations
Letting of
07/11/2012
LA DOTD Headquarters
| Lead Project: H.009756.6 | |
| Parish: Orleans | |
| Routes: | |
| Description: I-10: FRANKLIN-HIGHRISE MEDIAN LANDSCAPING | |
| Type Const: CLEARING AND GRUBBING, LANDSCAPING, AND RELATED WORK | |
| Estimated Construction Cost: $288,735.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 54896 | Magee Excavation & Development LLC | $365,489.50 |
| 2 | 49194 | Task Force Llc | $440,578.57 |
| 3 | 48896 | Command Construction Industries LLC | $449,095.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Magee Excavation & Development LLC |
- 2 - Task Force Llc |
- 3 - Command Construction Industries LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 20,000.00 | 20,000.00 | 34,048.00 | 34,048.00 | 40,000.00 | 40,000.00 |
| 0002 | 202-02-12020 | Removal of Fence (Chain Link) | 3,175 | LNFT | 2.00 | 6,350.00 | 2.36 | 7,493.00 | 5.00 | 15,875.00 |
| 0003 | 203-01-00100 | General Excavation 8" from top of raised median barrier | 762 | CUYD | 22.00 | 16,764.00 | 41.27 | 31,447.74 | 40.00 | 30,480.00 |
| 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 17,750.00 | 17,750.00 | 52,288.00 | 52,288.00 | 15,000.00 | 15,000.00 |
| 0005 | 719-01-02040 | Plants (Tree) (Container) (2" cal) Crape Myrtle, Lagerstroemia indica 'Natchez White' (45 gallon) (10'-12' Ht.) (Full Spread) (Multi-trunk) (3 Cane Min.) (2" Cal. Min. Per Cane) | 11 | EACH | 171.50 | 1,886.50 | 501.88 | 5,520.68 | 700.00 | 7,700.00 |
| 0006 | 719-01-02040 | Plants (Tree) (Container) (2" cal) Sweetbay Magnolia, Magnolia virginiana (45 gallon) (10'-12' Ht.) (Full Spread) (Single Trunk) | 15 | EACH | 116.50 | 1,747.50 | 358.72 | 5,380.80 | 800.00 | 12,000.00 |
| 0007 | 719-01-02060 | Plants (Tree) (Container) (2 1/2" cal) Bald Cypress,Taxodium distichum (30 Gal.) (10'-12' Ht.) (Full Spread) | 9 | EACH | 88.50 | 796.50 | 492.89 | 4,436.01 | 550.00 | 4,950.00 |
| 0008 | 719-01-02080 | Plants (Tree) (Container) (3" cal) Bald Cypress,Taxodium distichum (45 Gal.) (12'-14' Ht.) (Full Spread) | 9 | EACH | 152.00 | 1,368.00 | 556.12 | 5,005.08 | 675.00 | 6,075.00 |
| 0009 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) Gulf Coast Muhly Grass, Muhlenbergia capillaris @ 24" O.C. (18"-24" Ht.) (12"-18" Spread) (Full Plant) | 2,830 | EACH | 3.25 | 9,197.50 | 4.33 | 12,253.90 | 21.00 | 59,430.00 |
| 0010 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) Horsetail, Equisetum hyemale @ 18" O.C. (16"-24" Ht.) (Full Plant) | 230 | EACH | 3.75 | 862.50 | 19.51 | 4,487.30 | 26.00 | 5,980.00 |
| 0011 | 719-01-06100 | Plants (Plant) (Container) (7 gallon) Primrose Jasmine, Jasminum mesnyi @ 6' O.C. (Container Grown) (28"-36" Ht.) (28"-36" Spread) (Full Plant) | 54 | EACH | 6.75 | 364.50 | 74.24 | 4,008.96 | 80.00 | 4,320.00 |
| 0012 | 719-01-07020 | Plants (Palm) (Balled & Burlapped) (Minimum 4' Trunk Height) Canary Island Date Palm, Phoenix canariensis (3' Min. CT) (Full Spread 8'-10') (Specimen) | 2 | EACH | 1,150.00 | 2,300.00 | 2,918.40 | 5,836.80 | 5,000.00 | 10,000.00 |
| 0013 | 719-01-07080 | Plants (Palm) (Balled & Burlapped) (Minimum 7' Trunk Height) Canary Island Date Palm, Phoenix canariensis (6'-7' CT) (Full Spread 9'-11') (Specimen) | 1 | EACH | 7,500.00 | 7,500.00 | 11,187.20 | 11,187.20 | 8,200.00 | 8,200.00 |
| 0014 | 719-01-07180 | Plants (Palm) (Balled & Burlapped) (Minimum 12' Trunk Height) Sabal palmetto, Cabbage Palm (12' CT Min.) (8'-10' Full Spread) | 20 | EACH | 111.00 | 2,220.00 | 291.84 | 5,836.80 | 1,500.00 | 30,000.00 |
| 0015 | 727-01-00100 | Mobilization | 1 | LUMP | 105,000.00 | 105,000.00 | 94,848.00 | 94,848.00 | 40,000.00 | 40,000.00 |
| 0016 | 740-01-00100 | Construction Layout | 1 | LUMP | 9,200.00 | 9,200.00 | 15,808.00 | 15,808.00 | 2,500.00 | 2,500.00 |
| 0017 | NS-705-00006 | Polymer Chain Link Fence (Black) (5-Foot Height) | 3,175 | LNFT | 20.00 | 63,500.00 | 17.46 | 55,435.50 | 17.00 | 53,975.00 |
| 0018 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 1,750.00 | 3,500.00 | 3,526.40 | 7,052.80 | 5,000.00 | 10,000.00 |
| 0019 | NS-ENH-19200 | Stone Washed River Gravel @ 2" depth | 3,430 | SQYD | 12.25 | 42,017.50 | 13.22 | 45,344.60 | 7.00 | 24,010.00 |
| 0020 | NS-ENH-23100 | Weed Control Fabric (Preemergence) @ Raised Median Barrier | 3,430 | SQYD | 15.50 | 53,165.00 | 9.58 | 32,859.40 | 20.00 | 68,600.00 |
| CONTRACTOR TOTAL | 365,489.50 | 440,578.57 | 449,095.00 | |||||||