Bid Tabulations
Letting of
07/25/2012
LA DOTD Headquarters
| Lead Project: H.009703.6 | |
| Parish: Jefferson | |
| Routes: | |
| Description: Airport Access Road Rehab:US 61 to I-10 | |
| Type Const: GRADING, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $1,883,211.50 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,936,086.79 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $2,083,386.23 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Boh Bros. Construction Co., LLC. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-00010 | Removal of Concrete Roadway Median Barrier (20' Section) | 10 | EACH | 3,500.00 | 35,000.00 | 1,600.00 | 16,000.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 200 | LNFT | 21.00 | 4,200.00 | 15.00 | 3,000.00 |
| 0003 | 202-02-14500 | Removal of Guard Rail | 529 | LNFT | 4.50 | 2,380.50 | 4.25 | 2,248.25 |
| 0004 | 202-02-38200 | Removal of Signs | 20 | EACH | 350.00 | 7,000.00 | 150.00 | 3,000.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 65 | CUYD | 80.00 | 5,200.00 | 50.00 | 3,250.00 |
| 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 28 | EACH | 46.00 | 1,288.00 | 15.00 | 420.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 1,800 | LNFT | 2.10 | 3,780.00 | 1.00 | 1,800.00 |
| 0008 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 25 | CUYD | 50.00 | 1,250.00 | 50.00 | 1,250.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 8,876.8 | TON | 105.00 | 932,064.00 | 100.00 | 887,680.00 |
| 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 60 | TON | 112.00 | 6,720.00 | 100.00 | 6,000.00 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 65,751.9 | SQYD | 2.50 | 164,379.75 | 3.00 | 197,255.70 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,653 | CUYD | 17.00 | -62,101.00 | 10.00 | -36,530.00 |
| 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 100 | SQYD | 138.00 | 13,800.00 | 150.00 | 15,000.00 |
| 0014 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 11,700 | LNFT | 1.65 | 19,305.00 | 2.00 | 23,400.00 |
| 0015 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 250 | SQYD | 217.00 | 54,250.00 | 350.00 | 87,500.00 |
| 0016 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 5 | EACH | 500.00 | 2,500.00 | 250.00 | 1,250.00 |
| 0017 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 480 | LNFT | 47.00 | 22,560.00 | 50.00 | 24,000.00 |
| 0018 | 704-03-00100 | Blocked Out Guard Rail | 62.5 | LNFT | 22.00 | 1,375.00 | 20.00 | 1,250.00 |
| 0019 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 25 | LNFT | 48.00 | 1,200.00 | 50.00 | 1,250.00 |
| 0020 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 1 | EACH | 2,600.00 | 2,600.00 | 2,400.00 | 2,400.00 |
| 0021 | 707-03-00100 | Combination Concrete Curb and Gutter | 200 | LNFT | 42.00 | 8,400.00 | 38.00 | 7,600.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 140,000.00 | 140,000.00 | 125,000.00 | 125,000.00 |
| 0023 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 872 | LNFT | 0.25 | 218.00 | 0.23 | 200.56 |
| 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 634 | LNFT | 0.35 | 221.90 | 0.78 | 494.52 |
| 0025 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 3.58 | MILE | 200.00 | 716.00 | 2,000.00 | 7,160.00 |
| 0026 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 4.297 | MILE | 150.00 | 644.55 | 1,250.00 | 5,371.25 |
| 0027 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 8.593 | MILE | 300.00 | 2,577.90 | 4,500.00 | 38,668.50 |
| 0028 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 42 | EACH | 20.00 | 840.00 | 45.00 | 1,890.00 |
| 0029 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 10.00 | 40.00 | 45.00 | 180.00 |
| 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 140,000.00 | 140,000.00 | 200,000.00 | 200,000.00 |
| 0031 | 729-01-00100 | Sign (Type A) | 69 | SQFT | 20.00 | 1,380.00 | 19.00 | 1,311.00 |
| 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 1 | EACH | 85.00 | 85.00 | 75.00 | 75.00 |
| 0033 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 640 | EACH | 11.00 | 7,040.00 | 10.00 | 6,400.00 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,262 | EACH | 5.50 | 17,941.00 | 5.50 | 17,941.00 |
| 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 872 | LNFT | 1.45 | 1,264.40 | 1.50 | 1,308.00 |
| 0036 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 400 | LNFT | 3.00 | 1,200.00 | 2.50 | 1,000.00 |
| 0037 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 165 | LNFT | 4.75 | 783.75 | 4.50 | 742.50 |
| 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 70 | LNFT | 5.50 | 385.00 | 5.25 | 367.50 |
| 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.405 | MILE | 3,300.00 | 27,736.50 | 2,600.00 | 21,853.00 |
| 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.017 | MILE | 855.00 | 3,434.54 | 850.00 | 3,414.45 |
| 0041 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 7 | EACH | 225.00 | 1,575.00 | 225.00 | 1,575.00 |
| 0042 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 225.00 | 450.00 | 225.00 | 450.00 |
| 0043 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 220.00 | 880.00 | 225.00 | 900.00 |
| 0044 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 230.00 | 1,150.00 | 250.00 | 1,250.00 |
| 0045 | 732-05-00100 | Removal of Existing Markings | 0.31 | MILE | 6,200.00 | 1,922.00 | 5,000.00 | 1,550.00 |
| 0046 | 733-01-00200 | Concrete Roadway Barrier (Double Faced) | 200 | LNFT | 258.00 | 51,600.00 | 500.00 | 100,000.00 |
| 0047 | 736-09-00100 | Loop Detector | 200 | LNFT | 17.00 | 3,400.00 | 15.00 | 3,000.00 |
| 0048 | 739-01-00100 | Hydro-Seeding | 0.2 | ACRE | 6,500.00 | 1,300.00 | 5,200.00 | 1,040.00 |
| 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 |
| 0050 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 37,800 | LNFT | 2.00 | 75,600.00 | 2.00 | 75,600.00 |
| 0051 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 25,200 | LNFT | 2.50 | 63,000.00 | 2.00 | 50,400.00 |
| 0052 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,920 | INLF | 1.25 | 2,400.00 | 1.50 | 2,880.00 |
| 0053 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 960 | INLF | 1.25 | 1,200.00 | 1.50 | 1,440.00 |
| 0054 | NS-602-00001 | Milling Concrete Pavement | 330 | SQYD | 20.00 | 6,600.00 | 20.00 | 6,600.00 |
| 0055 | NS-700-00140 | Flexible Post Traffic Delineators | 105 | EACH | 70.00 | 7,350.00 | 60.00 | 6,300.00 |
| 0056 | NS-705-00001 | Wire Mesh Fence | 3,100 | LF | 40.00 | 124,000.00 | 40.00 | 124,000.00 |
| 0057 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 2,500.00 | 5,000.00 | 7,000.00 | 14,000.00 |
| CONTRACTOR TOTAL | 1,936,086.79 | 2,083,386.23 | ||||||