Bid Tabulations
Letting of
04/10/2013
LA DOTD Headquarters
| Lead Project: H.009667.6 | |
| Parish: East Baton Rouge, East Feliciana | |
| Routes: LA 67, LA 412 | |
| Description: LA 67 & LA 412: INTERSECTION IMPROVEMENTS | |
| Type Const: GRADING, CLASS II BASE COURSE, COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE, DRAINAGE STRUCTURES, CONCRETE CURB & GUTTER and RELATED WORK. | |
| Estimated Construction Cost: $425,267.07 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05693 | Industrial Enterprises, Inc. | $447,915.34 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $485,164.80 |
| 37657 | Willis Construction Co. LLC | IRREGULAR |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Industrial Enterprises, Inc. |
- 2 - Barber Bros. Contracting Co., L.L.C |
Willis Construction Co. LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions End-of-Roadway Installation | 1 | LUMP | 12,242.50 | 12,242.50 | 10,000.00 | 10,000.00 | 500.00 | 500.00 |
| 0002 | 202-02-00020 | Removal of Aggregate Drive | 31 | SQYD | 5.75 | 178.25 | 60.00 | 1,860.00 | 15.00 | 465.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 212 | SQYD | 13.80 | 2,925.60 | 20.00 | 4,240.00 | 13.50 | 2,862.00 |
| 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" | 40 | LNFT | 6.90 | 276.00 | 25.00 | 1,000.00 | 10.00 | 400.00 |
| 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" | 40 | LNFT | 6.90 | 276.00 | 50.00 | 2,000.00 | 10.00 | 400.00 |
| 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 18" | 8 | LNFT | 6.90 | 55.20 | 60.00 | 480.00 | 20.00 | 160.00 |
| 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 12" | 50 | LNFT | 6.90 | 345.00 | 20.00 | 1,000.00 | 10.00 | 500.00 |
| 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,245 | SQYD | 8.34 | 10,383.30 | 20.00 | 24,900.00 | 13.50 | 16,807.50 |
| 0009 | 202-02-38240 | Removal of Signs and Supports | 4 | EACH | 28.75 | 115.00 | 250.00 | 1,000.00 | 100.00 | 400.00 |
| 0010 | 202-02-38500 | Removal of Surfacing and Stablized Base | 599.1 | SQYD | 5.75 | 3,444.83 | 10.00 | 5,991.00 | 13.50 | 8,087.85 |
| 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 41,225.00 | 41,225.00 | 15,000.00 | 15,000.00 | 3,000.00 | 3,000.00 |
| 0012 | 203-07-00100 | Borrow (Vehicular Measurement) | 150 | CUYD | 13.80 | 2,070.00 | 30.00 | 4,500.00 | 22.50 | 3,375.00 |
| 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 121.00 | 726.00 | 250.00 | 1,500.00 | 140.00 | 840.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 2,700 | LNFT | 1.71 | 4,617.00 | 2.20 | 5,940.00 | 2.00 | 5,400.00 |
| 0015 | 302-02-03100 | Class II Base Course (8" Thick) (Stone) | 887.9 | SQYD | 41.40 | 36,759.06 | 30.00 | 26,637.00 | 15.50 | 13,762.45 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 512.7 | TON | 103.00 | 52,808.10 | 95.00 | 48,706.50 | 143.00 | 73,316.10 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 25 | TON | 143.75 | 3,593.75 | 150.00 | 3,750.00 | 220.00 | 5,500.00 |
| 0018 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,219.8 | SQYD | 4.12 | 9,145.58 | 4.00 | 8,879.20 | 7.70 | 17,092.46 |
| 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -49 | CUYD | 0.12 | -5.88 | 0.00 | 0.00 | 10.00 | -490.00 |
| 0020 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 111 | SQYD | 124.20 | 13,786.20 | 90.00 | 9,990.00 | 132.00 | 14,652.00 |
| 0021 | 602-10-00100 | Longitudinal Shoulder Joints | 1,269.1 | LNFT | 2.30 | 2,918.93 | 2.00 | 2,538.20 | 2.50 | 3,172.75 |
| 0022 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 108 | LNFT | 84.59 | 9,135.72 | 150.00 | 16,200.00 | 92.45 | 9,984.60 |
| 0023 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 238 | LNFT | 48.53 | 11,550.14 | 75.00 | 17,850.00 | 45.61 | 10,855.18 |
| 0024 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 279 | LNFT | 59.64 | 16,639.56 | 100.00 | 27,900.00 | 51.89 | 14,477.31 |
| 0025 | 702-03-00100 | Catch Basins (CB-01) TYPE C GRATE | 6 | EACH | 2,300.00 | 13,800.00 | 2,500.00 | 15,000.00 | 2,755.00 | 16,530.00 |
| 0026 | 702-03-00500 | Catch Basins (CB-06) | 4 | EACH | 3,162.50 | 12,650.00 | 3,500.00 | 14,000.00 | 3,150.50 | 12,602.00 |
| 0027 | 702-03-00800 | Catch Basins (CB-09) TYPE C GRATE | 2 | EACH | 4,370.00 | 8,740.00 | 4,000.00 | 8,000.00 | 4,717.00 | 9,434.00 |
| 0028 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 575.00 | 575.00 | 2,500.00 | 2,500.00 | 1,000.00 | 1,000.00 |
| 0029 | 706-02-00200 | Concrete Drive (6" Thick) | 160 | SQYD | 80.50 | 12,880.00 | 85.00 | 13,600.00 | 100.00 | 16,000.00 |
| 0030 | 706-04-00100 | Handicapped Curb Ramps | 7 | EACH | 795.00 | 5,565.00 | 1,200.00 | 8,400.00 | 1,200.00 | 8,400.00 |
| 0031 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,269.1 | LNFT | 38.16 | 48,428.86 | 35.00 | 44,418.50 | 25.00 | 31,727.50 |
| 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 9,775.00 | 9,775.00 | 20,000.00 | 20,000.00 | 21,220.00 | 21,220.00 |
| 0033 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 375 | LNFT | 0.23 | 86.25 | 0.30 | 112.50 | 0.50 | 187.50 |
| 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,509 | LNFT | 0.80 | 1,207.20 | 1.00 | 1,509.00 | 1.00 | 1,509.00 |
| 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.967 | MILE | 583.00 | 1,146.76 | 700.00 | 1,376.90 | 1,100.00 | 2,163.70 |
| 0036 | 726-01-00100 | Bedding Material | 314.5 | CUYD | 57.50 | 18,083.75 | 50.00 | 15,725.00 | 70.00 | 22,015.00 |
| 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 27,250.00 | 27,250.00 | 20,000.00 | 20,000.00 | 34,137.00 | 34,137.00 |
| 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 369 | EACH | 5.57 | 2,055.33 | 6.00 | 2,214.00 | 5.50 | 2,029.50 |
| 0039 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 375 | LNFT | 1.43 | 536.25 | 2.00 | 750.00 | 1.10 | 412.50 |
| 0040 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 599 | LNFT | 4.77 | 2,857.23 | 6.00 | 3,594.00 | 3.30 | 1,976.70 |
| 0041 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 304 | LNFT | 5.30 | 1,611.20 | 6.00 | 1,824.00 | 4.95 | 1,504.80 |
| 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.071 | MILE | 3,710.00 | 3,973.41 | 3,000.00 | 3,213.00 | 11,000.00 | 11,781.00 |
| 0043 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.027 | MILE | 1,325.00 | 35.78 | 6,000.00 | 162.00 | 2,750.00 | 74.25 |
| 0044 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.028 | MILE | 3,710.00 | 103.88 | 12,000.00 | 336.00 | 5,500.00 | 154.00 |
| 0045 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 227.90 | 455.80 | 300.00 | 600.00 | 275.00 | 550.00 |
| 0046 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 227.90 | 455.80 | 300.00 | 600.00 | 275.00 | 550.00 |
| 0047 | 732-05-00100 | Removal of Existing Markings | 0.254 | MILE | 5,300.00 | 1,346.20 | 4,000.00 | 1,016.00 | 2,200.00 | 558.80 |
| 0048 | 735-01-00100 | Mailboxes | 4 | EACH | 10.80 | 43.20 | 12.00 | 48.00 | 12.00 | 48.00 |
| 0049 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 237.60 | 950.40 | 250.00 | 1,000.00 | 245.00 | 980.00 |
| 0050 | 739-01-00100 | Hydro-Seeding | 3 | ACRE | 1,242.00 | 3,726.00 | 2,000.00 | 6,000.00 | 2,365.00 | 7,095.00 |
| 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,650.00 | 12,650.00 | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 |
| 0052 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 2 | EACH | 1,725.00 | 3,450.00 | 5,000.00 | 10,000.00 | 2,000.00 | 4,000.00 |
| 0053 | NS-500-00300 | Traffic Maintenance Superpave Asphaltic Concrete | 16.5 | TON | 115.00 | 1,897.50 | 250.00 | 4,125.00 | 200.00 | 3,300.00 |
| 0054 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,320 | INLF | 0.63 | 1,461.60 | 2.20 | 5,104.00 | 1.00 | 2,320.00 |
| 0055 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,230 | INLF | 1.27 | 2,832.10 | 2.50 | 5,575.00 | 1.00 | 2,230.00 |
| 0056 | NS-MSC-00120 | Drainage Structure CAP EXISTING CATCH BASIN | 1 | EACH | 575.00 | 575.00 | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 |
| 0057 | NS-MSC-00120 | Drainage Structure PG-01 | 4 | EACH | 2,875.00 | 11,500.00 | 5,000.00 | 20,000.00 | 1,100.00 | 4,400.00 |