LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.009643.6
Parish: St. Mary
Routes: LA 87
Description: LA 87: LA 670 - LA 324
Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost: $2,842,603.89


RankLicenseBidderConstruction Bid
1 33663 Glenn Lege Construction Inc $2,675,858.48
2 12487 Diamond B Construction Co., L.L.C. $2,714,548.69
3 00481 Coastal Bridge Co., L.L.C. $2,878,511.71


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Glenn Lege Construction Inc
- 2 -
Diamond B Construction Co., L.L.C.
- 3 -
Coastal Bridge Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-06100 Removal of Concrete Walks and Drives 53      SQYD 10.00 530.00 55.00 2,915.00 20.00 1,060.00
0002 202-02-32100 Removal of Pipe (Cross Drain) (APPROX. STA. 55+77) 50      LNFT 15.00 750.00 15.00 750.00 50.00 2,500.00
0003 203-07-00100 Borrow (Vehicular Measurement) 200      CUYD 20.00 4,000.00 23.00 4,600.00 35.00 7,000.00
0004 204-05-00100 Temporary Sediment Check Dams (Hay) 46      EACH 140.00 6,440.00 115.00 5,290.00 110.00 5,060.00
0005 303-01-00200 In-Place Cement Stabilized Base Course (8 1/2" Thick) 56,462      SQYD 4.75 268,194.50 7.00 395,234.00 5.50 310,541.00
0006 305-01-03020 Subgrade Layer (10" Thick) (Treated) 9,240      SQYD 10.30 95,172.00 15.00 138,600.00 10.00 92,400.00
0007 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 2,773.4    CUYD 30.50 84,588.70 47.00 130,349.80 30.00 83,202.00
0008 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 200      CUYD 30.50 6,100.00 51.00 10,200.00 30.00 6,000.00
0009 502-01-00100 Superpave Asphaltic Concrete 15,623      TON 84.00 1,312,332.00 84.00 1,312,332.00 75.00 1,171,725.00
0010 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,419.4    TON 80.00 113,552.00 143.00 202,974.20 1.00 1,419.40
0011 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 37,182      GAL 3.75 139,432.50 3.50 130,137.00 3.50 130,137.00
0012 507-02-00200 Aggregate (S2) 54,680      SQYD 1.00 54,680.00 0.95 51,946.00 0.90 49,212.00
0013 507-02-00300 Aggregate (S3) 54,680      SQYD 0.80 43,744.00 0.72 39,369.60 0.70 38,276.00
0014 509-01-00100 Cold Planing Asphaltic Pavement 55,986      SQYD 2.25 125,968.50 1.00 55,986.00 4.00 223,944.00
0015 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -5,054      CUYD 0.10 -505.40 10.00 -50,540.00 0.01 -50.54
0016 510-01-00200 Pavement Patching (12" Minimum Thickness) 450      SQYD 82.70 37,215.00 82.00 36,900.00 50.00 22,500.00
0017 701-01-01081 Cross Drain Pipe (48" RCP) 50      LNFT 290.00 14,500.00 330.00 16,500.00 230.00 11,500.00
0018 701-08-00100 Relaying Pipe 4      LNFT 160.00 640.00 130.00 520.00 400.00 1,600.00
0019 701-15-00100 Concrete Collar 1      EACH 475.00 475.00 775.00 775.00 1,500.00 1,500.00
0020 706-02-00200 Concrete Drive (6" Thick) 25      SQYD 70.00 1,750.00 115.00 2,875.00 70.00 1,750.00
0021 713-01-00100 Temporary Signs and Barricades 1      LUMP 41,200.00 41,200.00 16,000.00 16,000.00 125,000.00 125,000.00
0022 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 8.642  MILE 300.00 2,592.60 170.00 1,469.14 165.00 1,425.93
0023 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 4.981  MILE 220.00 1,095.82 200.00 996.20 410.00 2,042.21
0024 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 27.871  MILE 440.00 12,263.24 400.00 11,148.40 510.00 14,214.21
0025 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 1,149      EACH 1.65 1,895.85 1.50 1,723.50 1.50 1,723.50
0026 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 8,000.00 8,000.00 3,000.00 3,000.00 5,000.00 5,000.00
0027 726-01-00100 Bedding Material 10      CUYD 125.00 1,250.00 105.00 1,050.00 120.00 1,200.00
0028 727-01-00100 Mobilization 1      LUMP 165,000.00 165,000.00 88,600.00 88,600.00 275,000.00 275,000.00
0029 729-16-00300 Object Marker Assembly (Type 3) 76      EACH 100.00 7,600.00 80.00 6,080.00 65.00 4,940.00
0030 731-02-00100 Reflectorized Raised Pavement Markers 1,132      EACH 5.00 5,660.00 4.75 5,377.00 5.50 6,226.00
0031 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 13.936  MILE 2,620.00 36,512.32 2,400.00 33,446.40 2,500.00 34,840.00
0032 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.49   MILE 765.00 1,904.85 705.00 1,755.45 900.00 2,241.00
0033 735-01-00100 Mailboxes 29      EACH 1.00 29.00 1.00 29.00 15.00 435.00
0034 735-02-00100 Mailbox Supports (Single) 37      EACH 140.00 5,180.00 130.00 4,810.00 130.00 4,810.00
0035 740-01-00100 Construction Layout 1      LUMP 10,100.00 10,100.00 6,000.00 6,000.00 100,000.00 100,000.00
0036 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 1,148      INLF 1.25 1,435.00 2.00 2,296.00 1.00 1,148.00
0037 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 3,914      CUYD 16.50 64,581.00 11.00 43,054.00 35.00 136,990.00
                     
    CONTRACTOR TOTAL       2,675,858.48   2,714,548.69   2,878,511.71