Bid Tabulations
Letting of
12/12/2012
LA DOTD Headquarters
| Lead Project: H.009642.6 | |
| Parish: Vermilion | |
| Routes: LA 14 | |
| Description: LA 14: E. C/L GUEYDAN - LA 3093 | |
| Type Const: GRADING, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, DRAINAGE STRUCTURES, and RELATED WORK. | |
| Estimated Construction Cost: $3,301,430.34 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00481 | Coastal Bridge Co., L.L.C. | $3,191,997.57 |
| 2 | 33663 | Glenn Lege Construction Inc | $3,240,947.94 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $3,657,986.15 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Coastal Bridge Co., L.L.C. |
- 2 - Glenn Lege Construction Inc |
- 3 - Diamond B Construction Co., L.L.C. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-32120 | Removal of Pipe (Side Drain) (48" x 24') | 24 | LNFT | 50.00 | 1,200.00 | 20.00 | 480.00 | 52.00 | 1,248.00 |
| 0002 | 203-01-00100 | General Excavation | 50 | CUYD | 25.00 | 1,250.00 | 10.00 | 500.00 | 27.00 | 1,350.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 225 | CUYD | 30.00 | 6,750.00 | 16.00 | 3,600.00 | 35.00 | 7,875.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 58 | EACH | 1.00 | 58.00 | 40.00 | 2,320.00 | 140.00 | 8,120.00 |
| 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4,147.3 | CUYD | 1.00 | 4,147.30 | 35.00 | 145,155.50 | 85.00 | 352,520.50 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 20,089 | TON | 90.00 | 1,808,010.00 | 83.00 | 1,667,387.00 | 87.00 | 1,747,743.00 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,334.5 | TON | 5.00 | 6,672.50 | 116.00 | 154,802.00 | 233.00 | 310,938.50 |
| 0008 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 63,357 | GAL | 3.50 | 221,749.50 | 3.75 | 237,588.75 | 4.25 | 269,267.25 |
| 0009 | 507-02-00200 | Aggregate (S2) | 93,174 | SQYD | 1.00 | 93,174.00 | 1.05 | 97,832.70 | 1.00 | 93,174.00 |
| 0010 | 507-02-00300 | Aggregate (S3) | 93,174 | SQYD | 0.75 | 69,880.50 | 0.81 | 75,470.94 | 0.80 | 74,539.20 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 92,415 | SQYD | 1.50 | 138,622.50 | 1.00 | 92,415.00 | 2.50 | 231,037.50 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,846 | CUYD | 0.01 | -38.46 | 0.10 | -384.60 | 15.00 | -57,690.00 |
| 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 4,492 | SQYD | 60.00 | 269,520.00 | 85.00 | 381,820.00 | 75.00 | 336,900.00 |
| 0014 | 510-03-00100 | Pavement Joint Repair | 35 | TON | 160.00 | 5,600.00 | 400.00 | 14,000.00 | 350.00 | 12,250.00 |
| 0015 | 701-05-02140 | Side Drain Pipe (Erosion) (48" PP/CMP) | 60 | LNFT | 170.00 | 10,200.00 | 112.00 | 6,720.00 | 170.00 | 10,200.00 |
| 0016 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 450 | LNFT | 40.00 | 18,000.00 | 44.70 | 20,115.00 | 45.00 | 20,250.00 |
| 0017 | 704-03-00100 | Blocked Out Guard Rail | 543.75 | LNFT | 20.00 | 10,875.00 | 26.50 | 14,409.38 | 25.00 | 13,593.75 |
| 0018 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 214 | LNFT | 70.00 | 14,980.00 | 71.00 | 15,194.00 | 70.00 | 14,980.00 |
| 0019 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 7 | EACH | 2,600.00 | 18,200.00 | 3,024.00 | 21,168.00 | 2,500.00 | 17,500.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 39,600.00 | 39,600.00 | 22,000.00 | 22,000.00 |
| 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.72 | MILE | 400.00 | 5,088.00 | 700.00 | 8,904.00 | 170.00 | 2,162.40 |
| 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.932 | MILE | 200.00 | 2,186.40 | 218.00 | 2,383.18 | 210.25 | 2,298.45 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 31.605 | MILE | 225.00 | 7,111.13 | 436.00 | 13,779.78 | 400.00 | 12,642.00 |
| 0024 | 726-01-00100 | Bedding Material | 20 | CUYD | 90.00 | 1,800.00 | 75.00 | 1,500.00 | 105.00 | 2,100.00 |
| 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 163,932.00 | 163,932.00 | 95,000.00 | 95,000.00 |
| 0026 | 729-16-00200 | Object Marker Assembly (Type 2) | 5 | EACH | 50.00 | 250.00 | 82.00 | 410.00 | 77.00 | 385.00 |
| 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 75.00 | 600.00 | 93.00 | 744.00 | 87.00 | 696.00 |
| 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 841 | EACH | 5.00 | 4,205.00 | 4.90 | 4,120.90 | 4.50 | 3,784.50 |
| 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.802 | MILE | 2,500.00 | 39,505.00 | 2,287.00 | 36,139.17 | 2,400.00 | 37,924.80 |
| 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.466 | MILE | 700.00 | 3,826.20 | 654.00 | 3,574.76 | 650.00 | 3,552.90 |
| 0031 | 732-05-00100 | Removal of Existing Markings | 0.042 | MILE | 5,000.00 | 210.00 | 2,178.00 | 91.48 | 5,200.00 | 218.40 |
| 0032 | 735-01-00100 | Mailboxes | 10 | EACH | 1.00 | 10.00 | 16.50 | 165.00 | 10.00 | 100.00 |
| 0033 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 200.00 | 1,600.00 | 118.00 | 944.00 | 175.00 | 1,400.00 |
| 0034 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 255.00 | 255.00 | 146.00 | 146.00 | 225.00 | 225.00 |
| 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 12,285.00 | 12,285.00 | 6,200.00 | 6,200.00 |
| 0036 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 1,500.00 | 1,500.00 | 1,635.00 | 1,635.00 | 1,500.00 | 1,500.00 |
| CONTRACTOR TOTAL | 3,191,997.57 | 3,240,947.94 | 3,657,986.15 | |||||||