LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.009642.6
Parish: Vermilion
Routes: LA 14
Description: LA 14: E. C/L GUEYDAN - LA 3093
Type Const: GRADING, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, DRAINAGE STRUCTURES, and RELATED WORK.
Estimated Construction Cost: $3,301,430.34


RankLicenseBidderConstruction Bid
1 00481 Coastal Bridge Co., L.L.C. $3,191,997.57
2 33663 Glenn Lege Construction Inc $3,240,947.94
3 12487 Diamond B Construction Co., L.L.C. $3,657,986.15


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Coastal Bridge Co., L.L.C.
- 2 -
Glenn Lege Construction Inc
- 3 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-32120 Removal of Pipe (Side Drain) (48" x 24') 24      LNFT 50.00 1,200.00 20.00 480.00 52.00 1,248.00
0002 203-01-00100 General Excavation 50      CUYD 25.00 1,250.00 10.00 500.00 27.00 1,350.00
0003 203-07-00100 Borrow (Vehicular Measurement) 225      CUYD 30.00 6,750.00 16.00 3,600.00 35.00 7,875.00
0004 204-05-00100 Temporary Sediment Check Dams (Hay) 58      EACH 1.00 58.00 40.00 2,320.00 140.00 8,120.00
0005 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 4,147.3    CUYD 1.00 4,147.30 35.00 145,155.50 85.00 352,520.50
0006 502-01-00100 Superpave Asphaltic Concrete 20,089      TON 90.00 1,808,010.00 83.00 1,667,387.00 87.00 1,747,743.00
0007 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,334.5    TON 5.00 6,672.50 116.00 154,802.00 233.00 310,938.50
0008 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 63,357      GAL 3.50 221,749.50 3.75 237,588.75 4.25 269,267.25
0009 507-02-00200 Aggregate (S2) 93,174      SQYD 1.00 93,174.00 1.05 97,832.70 1.00 93,174.00
0010 507-02-00300 Aggregate (S3) 93,174      SQYD 0.75 69,880.50 0.81 75,470.94 0.80 74,539.20
0011 509-01-00100 Cold Planing Asphaltic Pavement 92,415      SQYD 1.50 138,622.50 1.00 92,415.00 2.50 231,037.50
0012 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -3,846      CUYD 0.01 -38.46 0.10 -384.60 15.00 -57,690.00
0013 510-01-00200 Pavement Patching (12" Minimum Thickness) 4,492      SQYD 60.00 269,520.00 85.00 381,820.00 75.00 336,900.00
0014 510-03-00100 Pavement Joint Repair 35      TON 160.00 5,600.00 400.00 14,000.00 350.00 12,250.00
0015 701-05-02140 Side Drain Pipe (Erosion) (48" PP/CMP) 60      LNFT 170.00 10,200.00 112.00 6,720.00 170.00 10,200.00
0016 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 450      LNFT 40.00 18,000.00 44.70 20,115.00 45.00 20,250.00
0017 704-03-00100 Blocked Out Guard Rail 543.75   LNFT 20.00 10,875.00 26.50 14,409.38 25.00 13,593.75
0018 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 214      LNFT 70.00 14,980.00 71.00 15,194.00 70.00 14,980.00
0019 704-11-00200 Guard Rail End Treatment (Tangent) 7      EACH 2,600.00 18,200.00 3,024.00 21,168.00 2,500.00 17,500.00
0020 713-01-00100 Temporary Signs and Barricades 1      LUMP 100,000.00 100,000.00 39,600.00 39,600.00 22,000.00 22,000.00
0021 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 12.72   MILE 400.00 5,088.00 700.00 8,904.00 170.00 2,162.40
0022 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 10.932  MILE 200.00 2,186.40 218.00 2,383.18 210.25 2,298.45
0023 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 31.605  MILE 225.00 7,111.13 436.00 13,779.78 400.00 12,642.00
0024 726-01-00100 Bedding Material 20      CUYD 90.00 1,800.00 75.00 1,500.00 105.00 2,100.00
0025 727-01-00100 Mobilization 1      LUMP 300,000.00 300,000.00 163,932.00 163,932.00 95,000.00 95,000.00
0026 729-16-00200 Object Marker Assembly (Type 2) 5      EACH 50.00 250.00 82.00 410.00 77.00 385.00
0027 729-16-00300 Object Marker Assembly (Type 3) 8      EACH 75.00 600.00 93.00 744.00 87.00 696.00
0028 731-02-00100 Reflectorized Raised Pavement Markers 841      EACH 5.00 4,205.00 4.90 4,120.90 4.50 3,784.50
0029 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 15.802  MILE 2,500.00 39,505.00 2,287.00 36,139.17 2,400.00 37,924.80
0030 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 5.466  MILE 700.00 3,826.20 654.00 3,574.76 650.00 3,552.90
0031 732-05-00100 Removal of Existing Markings 0.042  MILE 5,000.00 210.00 2,178.00 91.48 5,200.00 218.40
0032 735-01-00100 Mailboxes 10      EACH 1.00 10.00 16.50 165.00 10.00 100.00
0033 735-02-00100 Mailbox Supports (Single) 8      EACH 200.00 1,600.00 118.00 944.00 175.00 1,400.00
0034 735-03-00100 Mailbox Supports (Double) 1      EACH 255.00 255.00 146.00 146.00 225.00 225.00
0035 740-01-00100 Construction Layout 1      LUMP 25,000.00 25,000.00 12,285.00 12,285.00 6,200.00 6,200.00
0036 NS-700-00240 Special Guard Rail Anchor Section 1      EACH 1,500.00 1,500.00 1,635.00 1,635.00 1,500.00 1,500.00
                     
    CONTRACTOR TOTAL       3,191,997.57   3,240,947.94   3,657,986.15