LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.009641.6
Parish: Vermilion
Routes: LA 14
Description: LA 14: CAMERON P/L - ZWAN RD.
Type Const: COLD PLANING, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE and RELATED WORK.
Estimated Construction Cost: $939,302.90


RankLicenseBidderConstruction Bid
1 33663 Glenn Lege Construction Inc $772,989.31
2 00183 R. E. Heidt Construction Co., LLC $780,252.30
3 00481 Coastal Bridge Co., L.L.C. $818,694.23
4 12487 Diamond B Construction Co., L.L.C. $830,339.55
5 51821 Elliott Construction, LLC $887,671.45


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Glenn Lege Construction Inc
- 2 -
R. E. Heidt Construction Co., LLC
- 3 -
Coastal Bridge Co., L.L.C.
- 4 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 204-05-00100 Temporary Sediment Check Dams (Hay) 12      EACH 174.60 2,095.20 35.35 424.20 10.00 120.00 170.00 2,040.00
0002 303-01-00200 In-Place Cement Stabilized Base Course (8 1/2" Thick) 16,371      SQYD 7.70 126,056.70 8.34 136,534.14 7.00 114,597.00 6.50 106,411.50
0003 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 606      CUYD 32.00 19,392.00 20.00 12,120.00 30.00 18,180.00 40.00 24,240.00
0004 502-01-00100 Superpave Asphaltic Concrete 4,419      TON 83.10 367,218.90 93.00 410,967.00 90.00 397,710.00 90.50 399,919.50
0005 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 595.4    TON 108.84 64,803.34 94.00 55,967.60 5.00 2,977.00 165.00 98,241.00
0006 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 11,630      GAL 4.46 51,869.80 3.55 41,286.50 4.00 46,520.00 4.50 52,335.00
0007 507-02-00200 Aggregate (S2) 17,103      SQYD 1.34 22,918.02 1.48 25,312.44 1.20 20,523.60 1.32 22,575.96
0008 507-02-00300 Aggregate (S3) 17,103      SQYD 1.17 20,010.51 1.26 21,549.78 1.05 17,958.15 1.20 20,523.60
0009 509-01-00100 Cold Planing Asphaltic Pavement 15,759      SQYD 1.73 27,263.07 1.10 17,334.90 2.40 37,821.60 2.70 42,549.30
0010 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -1,067      CUYD 0.10 -106.70 1.73 -1,845.91 0.01 -10.67 10.00 -10,670.00
0011 713-01-00100 Temporary Signs and Barricades 1      LUMP 9,378.70 9,378.70 3,182.00 3,182.00 35,000.00 35,000.00 6,000.00 6,000.00
0012 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 2.048  MILE 698.42 1,430.36 1,000.00 2,048.00 400.00 819.20 170.00 348.16
0013 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 2.192  MILE 529.14 1,159.87 202.00 442.78 350.00 767.20 225.00 493.20
0014 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 4.527  MILE 612.68 2,773.60 404.00 1,828.91 400.00 1,810.80 425.00 1,923.98
0015 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 295      EACH 1.40 413.00 2.00 590.00 1.25 368.75 1.25 368.75
0016 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 5,500.00 5,500.00 2,020.00 2,020.00 5,000.00 5,000.00 6,000.00 6,000.00
0017 727-01-00100 Mobilization 1      LUMP 35,276.00 35,276.00 33,040.00 33,040.00 80,000.00 80,000.00 45,000.00 45,000.00
0018 731-02-00100 Reflectorized Raised Pavement Markers 148      EACH 5.57 824.36 5.05 747.40 5.00 740.00 5.50 814.00
0019 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.12   MILE 2,784.93 5,904.05 3,030.00 6,423.60 2,500.00 5,300.00 3,200.00 6,784.00
0020 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.096  MILE 946.87 1,037.77 1,010.00 1,106.96 850.00 931.60 1,100.00 1,205.60
0021 735-01-00100 Mailboxes 6      EACH 13.37 80.22 28.00 168.00 10.00 60.00 1.00 6.00
0022 735-02-00100 Mailbox Supports (Single) 6      EACH 142.59 855.54 84.00 504.00 250.00 1,500.00 255.00 1,530.00
0023 740-01-00100 Construction Layout 1      LUMP 6,835.00 6,835.00 8,500.00 8,500.00 30,000.00 30,000.00 1,700.00 1,700.00
                         
    CONTRACTOR TOTAL       772,989.31   780,252.30   818,694.23   830,339.55



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Elliott Construction, LLC
Unit PriceTotal
Amount
0001 204-05-00100 Temporary Sediment Check Dams (Hay) 12      EACH 75.00 900.00
0002 303-01-00200 In-Place Cement Stabilized Base Course (8 1/2" Thick) 16,371      SQYD 7.85 128,512.35
0003 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 606      CUYD 30.00 18,180.00
0004 502-01-00100 Superpave Asphaltic Concrete 4,419      TON 95.00 419,805.00
0005 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 595.4    TON 133.00 79,188.20
0006 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 11,630      GAL 4.75 55,242.50
0007 507-02-00200 Aggregate (S2) 17,103      SQYD 1.65 28,219.95
0008 507-02-00300 Aggregate (S3) 17,103      SQYD 1.65 28,219.95
0009 509-01-00100 Cold Planing Asphaltic Pavement 15,759      SQYD 1.95 30,730.05
0010 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -1,067      CUYD 0.01 -10.67
0011 713-01-00100 Temporary Signs and Barricades 1      LUMP 10,000.00 10,000.00
0012 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 2.048  MILE 475.00 972.80
0013 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 2.192  MILE 220.00 482.24
0014 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 4.527  MILE 440.00 1,991.88
0015 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 295      EACH 2.00 590.00
0016 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 12,000.00 12,000.00
0017 727-01-00100 Mobilization 1      LUMP 60,000.00 60,000.00
0018 731-02-00100 Reflectorized Raised Pavement Markers 148      EACH 5.50 814.00
0019 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.12   MILE 3,300.00 6,996.00
0020 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.096  MILE 1,100.00 1,205.60
0021 735-01-00100 Mailboxes 6      EACH 1.10 6.60
0022 735-02-00100 Mailbox Supports (Single) 6      EACH 275.00 1,650.00
0023 740-01-00100 Construction Layout 1      LUMP 1,975.00 1,975.00
             
    CONTRACTOR TOTAL       887,671.45