Bid Tabulations
Letting of
09/12/2012
LA DOTD Headquarters
| Lead Project: H.009640.6 | |
| Parish: Vermilion | |
| Routes: LA 14 | |
| Description: LA 14: JEFFERSON DAVIS PARISH LINE -- CAMERON PARISH LINE | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $1,351,905.51 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 33663 | Glenn Lege Construction Inc | $1,229,209.53 |
| 2 | 51821 | Elliott Construction, LLC | $1,447,599.52 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Glenn Lege Construction Inc |
- 2 - Elliott Construction, LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 26 | EACH | 100.00 | 2,600.00 | 100.00 | 2,600.00 |
| 0002 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,275 | CUYD | 37.00 | 84,175.00 | 56.50 | 128,537.50 |
| 0003 | 502-01-00100 | Superpave Asphaltic Concrete | 8,169.5 | TON | 80.50 | 657,644.75 | 110.00 | 898,645.00 |
| 0004 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 120 | TON | 117.50 | 14,100.00 | 145.00 | 17,400.00 |
| 0005 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 19,015 | GAL | 3.91 | 74,348.65 | 3.91 | 74,348.65 |
| 0006 | 507-02-00200 | Aggregate (S2) | 27,963 | SQYD | 1.16 | 32,437.08 | 1.16 | 32,437.08 |
| 0007 | 507-02-00300 | Aggregate (S3) | 27,963 | SQYD | 0.94 | 26,285.22 | 0.94 | 26,285.22 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 27,963 | SQYD | 0.60 | 16,777.80 | 1.25 | 34,953.75 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,165 | CUYD | 0.10 | -116.50 | 0.01 | -11.65 |
| 0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,600 | SQYD | 82.00 | 131,200.00 | 90.00 | 144,000.00 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,449.44 | 8,449.44 | 10,000.00 | 10,000.00 |
| 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.494 | MILE | 297.33 | 1,336.20 | 450.00 | 2,022.30 |
| 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.297 | MILE | 523.02 | 2,247.42 | 220.00 | 945.34 |
| 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 10.425 | MILE | 605.61 | 6,313.48 | 440.00 | 4,587.00 |
| 0015 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 315 | EACH | 1.65 | 519.75 | 1.65 | 519.75 |
| 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 145,650.00 | 145,650.00 | 50,000.00 | 50,000.00 |
| 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 300 | EACH | 5.79 | 1,737.00 | 4.95 | 1,485.00 |
| 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.213 | MILE | 2,752.75 | 14,350.09 | 2,640.00 | 13,762.32 |
| 0019 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.148 | MILE | 935.94 | 2,010.40 | 770.00 | 1,653.96 |
| 0020 | 735-01-00100 | Mailboxes | 3 | EACH | 1.10 | 3.30 | 1.10 | 3.30 |
| 0021 | 735-02-00100 | Mailbox Supports (Single) | 5 | EACH | 88.09 | 440.45 | 385.00 | 1,925.00 |
| 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,700.00 | 6,700.00 | 1,500.00 | 1,500.00 |
| CONTRACTOR TOTAL | 1,229,209.53 | 1,447,599.52 | ||||||