Bid Tabulations
Letting of
06/12/2013
LA DOTD Headquarters
| Lead Project: H.009622.6 | |
| Parish: Acadia | |
| Routes: LA 1111 | |
| Description: LA 1111: RT TURN LN ONTO LA 13 | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, IN-PLACE STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK | |
| Estimated Construction Cost: $682,830.02 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 51821 | Elliott Construction, LLC | $660,193.85 |
| 2 | 33663 | Glenn Lege Construction Inc | $788,603.11 |
| 3 | 30774 | Progressive Construction Co., LLC | $828,563.37 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Elliott Construction, LLC |
- 2 - Glenn Lege Construction Inc |
- 3 - Progressive Construction Co., LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02000 | Removal of Asphalt Drives | 106 | SQYD | 20.00 | 2,120.00 | 8.65 | 916.90 | 7.50 | 795.00 |
| 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 1,000.00 | 2,000.00 | 350.00 | 700.00 | 788.00 | 1,576.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 129.7 | LNFT | 20.00 | 2,594.00 | 7.00 | 907.90 | 10.50 | 1,361.85 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 459 | SQYD | 20.00 | 9,180.00 | 8.65 | 3,970.35 | 9.00 | 4,131.00 |
| 0005 | 202-02-26000 | Removal of Manholes | 1 | EACH | 1,000.00 | 1,000.00 | 350.00 | 350.00 | 850.00 | 850.00 |
| 0006 | 202-02-32000 | Removal of Paved Ditches | 35 | SQYD | 50.00 | 1,750.00 | 8.65 | 302.75 | 22.00 | 770.00 |
| 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 4 | LNFT | 50.00 | 200.00 | 14.00 | 56.00 | 102.00 | 408.00 |
| 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (18" RCP-36" RCP) | 240 | LNFT | 20.00 | 4,800.00 | 15.00 | 3,600.00 | 23.00 | 5,520.00 |
| 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) 36" RCP | 120 | LNFT | 22.00 | 2,640.00 | 16.00 | 1,920.00 | 31.00 | 3,720.00 |
| 0010 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 2,525.00 | 2,525.00 | 2,900.00 | 2,900.00 | 2,550.00 | 2,550.00 |
| 0011 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 1,083.00 | 1,083.00 | 1,250.00 | 1,250.00 | 1,100.00 | 1,100.00 |
| 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 27,000.00 | 27,000.00 | 50,500.00 | 50,500.00 |
| 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 40 | CUYD | 30.00 | 1,200.00 | 25.00 | 1,000.00 | 34.00 | 1,360.00 |
| 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 125.00 | 625.00 | 235.00 | 1,175.00 | 240.00 | 1,200.00 |
| 0015 | 204-06-00100 | Temporary Silt Fencing | 900 | LNFT | 1.65 | 1,485.00 | 2.00 | 1,800.00 | 3.00 | 2,700.00 |
| 0016 | 303-01-00200 | In-Place Cement Stabilized Base Course (8 1/2" Thick) | 1,325 | SQYD | 9.50 | 12,587.50 | 10.80 | 14,310.00 | 14.50 | 19,212.50 |
| 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 44 | CUYD | 75.00 | 3,300.00 | 47.00 | 2,068.00 | 75.00 | 3,300.00 |
| 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 90 | CUYD | 85.00 | 7,650.00 | 84.00 | 7,560.00 | 75.00 | 6,750.00 |
| 0019 | 502-01-00100 | Superpave Asphaltic Concrete | 444.1 | TON | 123.00 | 54,624.30 | 125.50 | 55,734.55 | 144.00 | 63,950.40 |
| 0020 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 135.2 | TON | 130.00 | 17,576.00 | 135.50 | 18,319.60 | 152.25 | 20,584.20 |
| 0021 | 507-02-00200 | Aggregate (S2) | 1,269 | SQYD | 9.90 | 12,563.10 | 10.85 | 13,768.65 | 9.90 | 12,563.10 |
| 0022 | 507-02-00300 | Aggregate (S3) | 1,269 | SQYD | 8.80 | 11,167.20 | 10.58 | 13,426.02 | 8.80 | 11,167.20 |
| 0023 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,316 | SQYD | 4.50 | 10,422.00 | 4.17 | 9,657.72 | 1.65 | 3,821.40 |
| 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -129 | CUYD | 0.01 | -1.29 | 1.00 | -129.00 | 0.01 | -1.29 |
| 0025 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 15 | SQYD | 265.00 | 3,975.00 | 170.00 | 2,550.00 | 183.00 | 2,745.00 |
| 0026 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 88 | LNFT | 63.00 | 5,544.00 | 60.60 | 5,332.80 | 58.60 | 5,156.80 |
| 0027 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 638 | LNFT | 72.50 | 46,255.00 | 87.71 | 55,958.98 | 80.00 | 51,040.00 |
| 0028 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 798 | LNFT | 94.00 | 75,012.00 | 115.23 | 91,953.54 | 119.50 | 95,361.00 |
| 0029 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 128 | LNFT | 125.00 | 16,000.00 | 158.18 | 20,247.04 | 128.00 | 16,384.00 |
| 0030 | 701-07-00100 | Yard Drain Pipe (4") | 6 | LNFT | 50.00 | 300.00 | 28.72 | 172.32 | 51.00 | 306.00 |
| 0031 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 10 | LNFT | 150.00 | 1,500.00 | 73.31 | 733.10 | 90.25 | 902.50 |
| 0032 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,425.00 | 1,425.00 | 400.00 | 400.00 | 1,000.00 | 1,000.00 |
| 0033 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,950.00 | 3,950.00 | 2,840.00 | 2,840.00 | 4,200.00 | 4,200.00 |
| 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 357.577 | SQYD | 60.00 | 21,454.62 | 49.00 | 17,521.27 | 60.50 | 21,633.41 |
| 0035 | 707-03-00100 | Combination Concrete Curb and Gutter | 860 | LNFT | 19.50 | 16,770.00 | 18.00 | 15,480.00 | 24.00 | 20,640.00 |
| 0036 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 60 | SQYD | 65.00 | 3,900.00 | 49.00 | 2,940.00 | 61.00 | 3,660.00 |
| 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 15,100.00 | 15,100.00 | 9,000.00 | 9,000.00 |
| 0038 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 450 | LNFT | 0.22 | 99.00 | 0.33 | 148.50 | 0.30 | 135.00 |
| 0039 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 57 | LNFT | 0.66 | 37.62 | 0.84 | 47.88 | 0.80 | 45.60 |
| 0040 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.305 | MILE | 500.00 | 152.50 | 1,000.00 | 305.00 | 5,800.00 | 1,769.00 |
| 0041 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.626 | MILE | 550.00 | 344.30 | 1,171.05 | 733.08 | 1,050.00 | 657.30 |
| 0042 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 55.00 | 110.00 | 67.11 | 134.22 | 27.50 | 55.00 |
| 0043 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 55.00 | 110.00 | 67.11 | 134.22 | 27.50 | 55.00 |
| 0044 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 6,125.00 | 6,125.00 | 10,000.00 | 10,000.00 |
| 0045 | 726-01-00100 | Bedding Material | 190 | CUYD | 88.50 | 16,815.00 | 98.50 | 18,715.00 | 75.00 | 14,250.00 |
| 0046 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 80,800.00 | 80,800.00 | 55,000.00 | 55,000.00 |
| 0047 | 729-01-00100 | Sign (Type A) | 20 | SQFT | 51.00 | 1,020.00 | 52.00 | 1,040.00 | 50.00 | 1,000.00 |
| 0048 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 200.00 | 400.00 | 275.00 | 550.00 | 175.00 | 350.00 |
| 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 119 | EACH | 5.50 | 654.50 | 5.75 | 684.25 | 8.40 | 999.60 |
| 0050 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 450 | LNFT | 1.65 | 742.50 | 2.25 | 1,012.50 | 2.50 | 1,125.00 |
| 0051 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 57 | LNFT | 4.95 | 282.15 | 6.67 | 380.19 | 15.75 | 897.75 |
| 0052 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.626 | MILE | 5,500.00 | 3,443.00 | 4,900.00 | 3,067.40 | 4,200.00 | 2,629.20 |
| 0053 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.013 | MILE | 2,750.00 | 35.75 | 4,450.00 | 57.85 | 21,000.00 | 273.00 |
| 0054 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.079 | MILE | 4,400.00 | 347.60 | 3,339.00 | 263.78 | 8,400.00 | 663.60 |
| 0055 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 220.00 | 440.00 | 270.00 | 540.00 | 370.00 | 740.00 |
| 0056 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 220.00 | 440.00 | 253.00 | 506.00 | 262.00 | 524.00 |
| 0057 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 220.00 | 440.00 | 265.00 | 530.00 | 475.00 | 950.00 |
| 0058 | 735-01-00100 | Mailboxes | 2 | EACH | 20.00 | 40.00 | 50.00 | 100.00 | 20.00 | 40.00 |
| 0059 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 250.00 | 250.00 | 300.00 | 300.00 | 200.00 | 200.00 |
| 0060 | 736-01-00100 | Trenching and Backfilling | 40 | LNFT | 8.00 | 320.00 | 8.20 | 328.00 | 8.00 | 320.00 |
| 0061 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 225 | LNFT | 12.00 | 2,700.00 | 12.12 | 2,727.00 | 11.00 | 2,475.00 |
| 0062 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 110 | LNFT | 16.00 | 1,760.00 | 16.25 | 1,787.50 | 15.50 | 1,705.00 |
| 0063 | 736-04-05010 | Signal Support (45'span, 30' span add-on arm) | 1 | EACH | 19,663.00 | 19,663.00 | 19,860.00 | 19,860.00 | 19,800.00 | 19,800.00 |
| 0064 | 736-04-05012 | Signal Support (45'span, 40' span add-on arm) | 1 | EACH | 20,894.00 | 20,894.00 | 21,105.00 | 21,105.00 | 21,000.00 | 21,000.00 |
| 0065 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 6 | EACH | 1,225.00 | 7,350.00 | 1,240.00 | 7,440.00 | 1,250.00 | 7,500.00 |
| 0066 | 736-05-02040 | Signal Heads (3 Section, 12" Led Lens, R, RT. Y, RT. G) | 1 | EACH | 1,225.00 | 1,225.00 | 1,240.00 | 1,240.00 | 1,250.00 | 1,250.00 |
| 0067 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,512.00 | 3,024.00 | 1,530.00 | 3,060.00 | 1,500.00 | 3,000.00 |
| 0068 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,798.00 | 3,596.00 | 1,820.00 | 3,640.00 | 1,800.00 | 3,600.00 |
| 0069 | 736-06-00600 | Signal Service (Existing Pole) | 1 | EACH | 4,009.00 | 4,009.00 | 4,050.00 | 4,050.00 | 4,000.00 | 4,000.00 |
| 0070 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 1 | EACH | 28,022.00 | 28,022.00 | 28,300.00 | 28,300.00 | 27,500.00 | 27,500.00 |
| 0071 | 736-10-00300 | Underground Junction Box (Type F) | 2 | EACH | 583.00 | 1,166.00 | 590.00 | 1,180.00 | 600.00 | 1,200.00 |
| 0072 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 1,081.00 | 1,081.00 | 1,100.00 | 1,100.00 | 1,080.00 | 1,080.00 |
| 0073 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 80 | LNFT | 5.25 | 420.00 | 5.50 | 440.00 | 5.40 | 432.00 |
| 0074 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 20 | LNFT | 9.00 | 180.00 | 9.30 | 186.00 | 9.00 | 180.00 |
| 0075 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 30 | LNFT | 3.50 | 105.00 | 3.50 | 105.00 | 3.40 | 102.00 |
| 0076 | 736-12-05000 | Conductor (7c, #12 awg) | 275 | LNFT | 3.50 | 962.50 | 3.65 | 1,003.75 | 3.50 | 962.50 |
| 0077 | 736-12-06000 | Conductor (10c, #14 awg) | 460 | LNFT | 3.50 | 1,610.00 | 3.40 | 1,564.00 | 3.30 | 1,518.00 |
| 0078 | 739-01-00100 | Hydro-Seeding | 0.5 | ACRE | 3,500.00 | 1,750.00 | 3,330.00 | 1,665.00 | 4,450.00 | 2,225.00 |
| 0079 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 35,000.00 | 35,000.00 | 6,200.00 | 6,200.00 |
| 0080 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 750 | INLF | 1.25 | 937.50 | 1.50 | 1,125.00 | 3.25 | 2,437.50 |
| 0081 | NS-736-00001 | GPS | 1 | EACH | 1,133.00 | 1,133.00 | 1,145.00 | 1,145.00 | 1,050.00 | 1,050.00 |
| 0082 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 5,346.00 | 5,346.00 | 5,400.00 | 5,400.00 | 5,400.00 | 5,400.00 |
| 0083 | NS-736-00006 | Video Detection Camera | 4 | EACH | 2,794.00 | 11,176.00 | 2,825.00 | 11,300.00 | 2,750.00 | 11,000.00 |
| 0084 | NS-MSC-00120 | Drainage Structure CB-SD02 | 8 | EACH | 7,750.00 | 62,000.00 | 10,000.00 | 80,000.00 | 17,000.00 | 136,000.00 |
| 0085 | NS-MSC-00120 | Drainage Structure PAVED GUTTER DRAIN(PG-DRAIN01) | 10 | EACH | 2,750.00 | 27,500.00 | 2,000.00 | 20,000.00 | 1,825.00 | 18,250.00 |
| SUBTOTAL GENERAL | 656,310 | 784,720 | 824,464 | |||||||
| Alternate AA1 | ||||||||||
| 0086 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 863 | GAL | 4.50 | 3,883.50 | 4.50 | 3,883.50 | 4.75 | 4,099.25 |
| SUBTOTAL ALT AA1 | 3,884 | 3,884 | 4,099 | |||||||
| Alternate AA2 | ||||||||||
| 0087 | 507-01-00200 | Asphaltic Material (PAC-15 Hot Application) | 673 | GAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| SUBTOTAL ALT AA2 | 0.00 | 0.00 | 0.00 | |||||||
| CONTRACTOR TOTAL | 660,193.85 | 788,603.11 | 828,563.37 | |||||||