Bid Tabulations
Letting of
07/10/2013
LA DOTD Headquarters
| Lead Project: H.009540.6-R1 | |
| Parish: Sabine | |
| Routes: LA 1218 | |
| Description: LA 1218: US 171 - LA 191 | |
| Type Const: SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, COLD PLANING, DRAINAGE STRUCTURES, AND RELATED WORK. | |
| Estimated Construction Cost: $967,029.16 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $1,000,272.40 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $1,091,214.09 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Gilchrist Construction Co. LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 1,400.00 | 1,400.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 25.00 | 12,500.00 | 25.00 | 12,500.00 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 908 | CUYD | 70.00 | 63,560.00 | 100.00 | 90,800.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 6,995.8 | TON | 90.00 | 629,622.00 | 94.00 | 657,605.20 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 422.1 | TON | 50.00 | 21,105.00 | 150.00 | 63,315.00 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 888 | SQYD | 6.50 | 5,772.00 | 10.00 | 8,880.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -22 | CUYD | 0.01 | -0.22 | 0.10 | -2.20 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,000 | SQYD | 75.00 | 75,000.00 | 85.00 | 85,000.00 |
| 0009 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 96 | LNFT | 200.00 | 19,200.00 | 170.00 | 16,320.00 |
| 0010 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 72 | LNFT | 250.00 | 18,000.00 | 195.00 | 14,040.00 |
| 0011 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,250.00 | 2,500.00 | 1,400.00 | 2,800.00 |
| 0012 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 35 | SQYD | 100.00 | 3,500.00 | 70.00 | 2,450.00 |
| 0013 | 711-04-00100 | Geotextile Fabric | 35 | SQYD | 3.00 | 105.00 | 10.00 | 350.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 48,000.00 | 48,000.00 | 9,000.00 | 9,000.00 |
| 0015 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 15 | LNFT | 0.01 | 0.15 | 1.00 | 15.00 |
| 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.547 | MILE | 325.00 | 1,802.78 | 200.00 | 1,109.40 |
| 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 11.093 | MILE | 1.00 | 11.09 | 1.00 | 11.09 |
| 0018 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 1.00 | 2.00 | 1.00 | 2.00 |
| 0019 | 716-01-00100 | Mulch (Vegetative) | 3.4 | TON | 1,000.00 | 3,400.00 | 800.00 | 2,720.00 |
| 0020 | 717-01-00100 | Seeding | 51 | LB | 15.00 | 765.00 | 13.00 | 663.00 |
| 0021 | 718-01-00100 | Fertilizer | 1,700 | LB | 1.00 | 1,700.00 | 0.55 | 935.00 |
| 0022 | 726-01-00100 | Bedding Material | 35.1 | CUYD | 100.00 | 3,510.00 | 100.00 | 3,510.00 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 48,000.00 | 48,000.00 | 80,000.00 | 80,000.00 |
| 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 100.00 | 1,000.00 | 76.00 | 760.00 |
| 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 732 | EACH | 4.00 | 2,928.00 | 5.25 | 3,843.00 |
| 0026 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 33 | LNFT | 3.00 | 99.00 | 13.00 | 429.00 |
| 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.547 | MILE | 2,200.00 | 12,203.40 | 2,800.00 | 15,531.60 |
| 0028 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 375.00 | 750.00 | 625.00 | 1,250.00 |
| 0029 | 735-01-00100 | Mailboxes | 12 | EACH | 1.00 | 12.00 | 1.00 | 12.00 |
| 0030 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 200.00 | 1,400.00 | 110.00 | 770.00 |
| 0031 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 200.00 | 200.00 | 185.00 | 185.00 |
| 0032 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 250.00 | 250.00 | 400.00 | 400.00 |
| 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 1,400.00 | 1,400.00 |
| 0034 | NS-200-00020 | Cleaning Existing Ditches | 130 | LNFT | 10.00 | 1,300.00 | 15.00 | 1,950.00 |
| 0035 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 7,520 | INLF | 0.01 | 75.20 | 0.50 | 3,760.00 |
| 0036 | NS-724-00003 | Rumble Strips (Intersection Ground-In) | 1 | EACH | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 |
| CONTRACTOR TOTAL | 1,000,272.40 | 1,091,214.09 | ||||||