Bid Tabulations
Letting of
01/09/2013
LA DOTD Headquarters
| Lead Project: H.009528.6 | |
| Parish: Richland | |
| Routes: LA 609 | |
| Description: LA 609: 3 MILES SOUTH OF I-20 TO US 80 | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $2,292,964.42 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $2,011,305.51 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $2,268,927.69 |
| 3 | 05789 | D & J Construction Co., Inc. | $2,709,320.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - D & J Construction Co., Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 99 | SQYD | 5.75 | 569.25 | 29.00 | 2,871.00 | 18.00 | 1,782.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 406.3 | LNFT | 12.00 | 4,875.60 | 6.00 | 2,437.80 | 50.00 | 20,315.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" RCP) | 96 | LNFT | 22.00 | 2,112.00 | 8.00 | 768.00 | 25.00 | 2,400.00 |
| 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) (24"CMP) | 40 | LNFT | 22.00 | 880.00 | 10.00 | 400.00 | 25.00 | 1,000.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 354 | CUYD | 35.00 | 12,390.00 | 40.00 | 14,160.00 | 30.00 | 10,620.00 |
| 0006 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,389 | CUYD | 17.00 | 23,613.00 | 20.00 | 27,780.00 | 20.00 | 27,780.00 |
| 0007 | 304-05-00100 | Lime Treatment (Type E) | 89.38 | TON | 475.00 | 42,455.50 | 535.00 | 47,818.30 | 500.00 | 44,690.00 |
| 0008 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 42,036 | SQYD | 10.00 | 420,360.00 | 10.00 | 420,360.00 | 12.50 | 525,450.00 |
| 0009 | 308-02-00100 | Removal of Existing Patches | 2,271 | SQYD | 12.00 | 27,252.00 | 20.00 | 45,420.00 | 12.00 | 27,252.00 |
| 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 803.4 | CUYD | 42.00 | 33,742.80 | 34.00 | 27,315.60 | 75.00 | 60,255.00 |
| 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 25.7 | CUYD | 75.00 | 1,927.50 | 100.00 | 2,570.00 | 75.00 | 1,927.50 |
| 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 10,909 | TON | 91.25 | 995,446.25 | 103.00 | 1,123,627.00 | 116.00 | 1,265,444.00 |
| 0013 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 967.7 | TON | 139.00 | 134,510.30 | 200.00 | 193,540.00 | 116.00 | 112,253.20 |
| 0014 | 509-01-00100 | Cold Planing Asphaltic Pavement | 53,324 | SQYD | 2.65 | 141,308.60 | 1.00 | 53,324.00 | 3.50 | 186,634.00 |
| 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -4,972 | CUYD | 15.00 | -74,580.00 | 0.01 | -49.72 | 0.10 | -497.20 |
| 0016 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 40 | LNFT | 100.00 | 4,000.00 | 150.00 | 6,000.00 | 100.00 | 4,000.00 |
| 0017 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 96 | LNFT | 155.00 | 14,880.00 | 168.00 | 16,128.00 | 150.00 | 14,400.00 |
| 0018 | 704-03-00100 | Blocked Out Guard Rail | 237.5 | LNFT | 22.00 | 5,225.00 | 23.00 | 5,462.50 | 21.00 | 4,987.50 |
| 0019 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 65.00 | 6,500.00 | 73.00 | 7,300.00 | 65.00 | 6,500.00 |
| 0020 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,550.00 | 10,200.00 | 2,400.00 | 9,600.00 | 2,500.00 | 10,000.00 |
| 0021 | 706-02-00200 | Concrete Drive (6" Thick) | 39.6 | SQYD | 72.00 | 2,851.20 | 195.00 | 7,722.00 | 80.00 | 3,168.00 |
| 0022 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 43 | SQYD | 115.00 | 4,945.00 | 107.00 | 4,601.00 | 125.00 | 5,375.00 |
| 0023 | 711-04-00100 | Geotextile Fabric | 43 | SQYD | 3.00 | 129.00 | 1.25 | 53.75 | 4.00 | 172.00 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 100,000.00 | 100,000.00 |
| 0025 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 804 | LNFT | 0.25 | 201.00 | 0.30 | 241.20 | 0.25 | 201.00 |
| 0026 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 1,274 | LNFT | 0.35 | 445.90 | 0.55 | 700.70 | 0.50 | 637.00 |
| 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 66 | LNFT | 0.75 | 49.50 | 0.85 | 56.10 | 0.75 | 49.50 |
| 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.772 | MILE | 175.00 | 2,060.10 | 220.00 | 2,589.84 | 250.00 | 2,943.00 |
| 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.536 | MILE | 225.00 | 1,020.60 | 220.00 | 997.92 | 200.00 | 907.20 |
| 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 36.3 | MILE | 475.00 | 17,242.50 | 310.00 | 11,253.00 | 1.00 | 36.30 |
| 0031 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 10 | EACH | 22.00 | 220.00 | 25.00 | 250.00 | 20.00 | 200.00 |
| 0032 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 10 | EACH | 22.00 | 220.00 | 40.00 | 400.00 | 35.00 | 350.00 |
| 0033 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 60.00 | 360.00 | 55.00 | 330.00 | 50.00 | 300.00 |
| 0034 | 716-01-00100 | Mulch (Vegetative) | 14.6 | TON | 550.00 | 8,030.00 | 525.00 | 7,665.00 | 500.00 | 7,300.00 |
| 0035 | 717-01-00100 | Seeding | 439 | LB | 11.00 | 4,829.00 | 8.25 | 3,621.75 | 8.00 | 3,512.00 |
| 0036 | 718-01-00100 | Fertilizer | 7,310 | LB | 0.50 | 3,655.00 | 0.55 | 4,020.50 | 0.50 | 3,655.00 |
| 0037 | 726-01-00100 | Bedding Material | 59.2 | CUYD | 100.00 | 5,920.00 | 125.00 | 7,400.00 | 100.00 | 5,920.00 |
| 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 75,000.00 | 75,000.00 | 137,000.00 | 137,000.00 | 150,000.00 | 150,000.00 |
| 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 5 | EACH | 88.00 | 440.00 | 90.00 | 450.00 | 100.00 | 500.00 |
| 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 95.00 | 380.00 | 100.00 | 400.00 | 100.00 | 400.00 |
| 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,273 | EACH | 5.50 | 7,001.50 | 6.00 | 7,638.00 | 8.00 | 10,184.00 |
| 0042 | 732-01-04080 | Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 22 | LNFT | 11.00 | 242.00 | 17.00 | 374.00 | 15.00 | 330.00 |
| 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.444 | MILE | 2,600.00 | 32,354.40 | 2,575.00 | 32,043.30 | 3,200.00 | 39,820.80 |
| 0044 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.062 | MILE | 5,700.00 | 353.40 | 9,200.00 | 570.40 | 9,000.00 | 558.00 |
| 0045 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.121 | MILE | 15,500.00 | 1,875.50 | 23,000.00 | 2,783.00 | 25,000.00 | 3,025.00 |
| 0046 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.512 | MILE | 955.00 | 1,443.96 | 650.00 | 982.80 | 1,600.00 | 2,419.20 |
| 0047 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 210.00 | 420.00 | 200.00 | 400.00 | 300.00 | 600.00 |
| 0048 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 210.00 | 420.00 | 200.00 | 400.00 | 300.00 | 600.00 |
| 0049 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 210.00 | 840.00 | 325.00 | 1,300.00 | 500.00 | 2,000.00 |
| 0050 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 420.00 | 840.00 | 425.00 | 850.00 | 500.00 | 1,000.00 |
| 0051 | 732-05-00100 | Removal of Existing Markings | 0.336 | MILE | 2,500.00 | 840.00 | 3,800.00 | 1,276.80 | 5,000.00 | 1,680.00 |
| 0052 | 735-01-00100 | Mailboxes | 23 | EACH | 1.00 | 23.00 | 14.00 | 322.00 | 5.00 | 115.00 |
| 0053 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 125.00 | 2,375.00 | 111.00 | 2,109.00 | 125.00 | 2,375.00 |
| 0054 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 175.00 | 350.00 | 140.00 | 280.00 | 250.00 | 500.00 |
| 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 7,900.00 | 7,900.00 | 27,000.00 | 27,000.00 |
| 0056 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,147 | INLF | 2.45 | 5,260.15 | 1.45 | 3,113.15 | 2.00 | 4,294.00 |
| CONTRACTOR TOTAL | 2,011,305.51 | 2,268,927.69 | 2,709,320.00 | |||||||