LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.009528.6
Parish: Richland
Routes: LA 609
Description: LA 609: 3 MILES SOUTH OF I-20 TO US 80
Type Const: DRAINAGE STRUCTURES, COLD PLANING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost: $2,292,964.42


RankLicenseBidderConstruction Bid
1 12487 Diamond B Construction Co., L.L.C. $2,011,305.51
2 12312 Gilchrist Construction Co. LLC $2,268,927.69
3 05789 D & J Construction Co., Inc. $2,709,320.00


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
Gilchrist Construction Co. LLC
- 3 -
D & J Construction Co., Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-06100 Removal of Concrete Walks and Drives 99      SQYD 5.75 569.25 29.00 2,871.00 18.00 1,782.00
0002 202-02-14500 Removal of Guard Rail 406.3    LNFT 12.00 4,875.60 6.00 2,437.80 50.00 20,315.00
0003 202-02-32100 Removal of Pipe (Cross Drain) (30" RCP) 96      LNFT 22.00 2,112.00 8.00 768.00 25.00 2,400.00
0004 202-02-32100 Removal of Pipe (Cross Drain) (24"CMP) 40      LNFT 22.00 880.00 10.00 400.00 25.00 1,000.00
0005 203-07-00100 Borrow (Vehicular Measurement) 354      CUYD 35.00 12,390.00 40.00 14,160.00 30.00 10,620.00
0006 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 1,389      CUYD 17.00 23,613.00 20.00 27,780.00 20.00 27,780.00
0007 304-05-00100 Lime Treatment (Type E) 89.38   TON 475.00 42,455.50 535.00 47,818.30 500.00 44,690.00
0008 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 42,036      SQYD 10.00 420,360.00 10.00 420,360.00 12.50 525,450.00
0009 308-02-00100 Removal of Existing Patches 2,271      SQYD 12.00 27,252.00 20.00 45,420.00 12.00 27,252.00
0010 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 803.4    CUYD 42.00 33,742.80 34.00 27,315.60 75.00 60,255.00
0011 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 25.7    CUYD 75.00 1,927.50 100.00 2,570.00 75.00 1,927.50
0012 502-01-00100 Superpave Asphaltic Concrete 10,909      TON 91.25 995,446.25 103.00 1,123,627.00 116.00 1,265,444.00
0013 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 967.7    TON 139.00 134,510.30 200.00 193,540.00 116.00 112,253.20
0014 509-01-00100 Cold Planing Asphaltic Pavement 53,324      SQYD 2.65 141,308.60 1.00 53,324.00 3.50 186,634.00
0015 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -4,972      CUYD 15.00 -74,580.00 0.01 -49.72 0.10 -497.20
0016 701-01-01001 Cross Drain Pipe (24" RCP) 40      LNFT 100.00 4,000.00 150.00 6,000.00 100.00 4,000.00
0017 701-01-01041 Cross Drain Pipe (36" RCP) 96      LNFT 155.00 14,880.00 168.00 16,128.00 150.00 14,400.00
0018 704-03-00100 Blocked Out Guard Rail 237.5    LNFT 22.00 5,225.00 23.00 5,462.50 21.00 4,987.50
0019 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 65.00 6,500.00 73.00 7,300.00 65.00 6,500.00
0020 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,550.00 10,200.00 2,400.00 9,600.00 2,500.00 10,000.00
0021 706-02-00200 Concrete Drive (6" Thick) 39.6    SQYD 72.00 2,851.20 195.00 7,722.00 80.00 3,168.00
0022 711-01-04000 Riprap (55 lb, 18" Thick) 43      SQYD 115.00 4,945.00 107.00 4,601.00 125.00 5,375.00
0023 711-04-00100 Geotextile Fabric 43      SQYD 3.00 129.00 1.25 53.75 4.00 172.00
0024 713-01-00100 Temporary Signs and Barricades 1      LUMP 15,000.00 15,000.00 10,000.00 10,000.00 100,000.00 100,000.00
0025 713-02-00300 Temporary Pavement Markings (8" Width) 804      LNFT 0.25 201.00 0.30 241.20 0.25 201.00
0026 713-02-00400 Temporary Pavement Markings (12" Width) 1,274      LNFT 0.35 445.90 0.55 700.70 0.50 637.00
0027 713-02-00500 Temporary Pavement Markings (24" Width) 66      LNFT 0.75 49.50 0.85 56.10 0.75 49.50
0028 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 11.772  MILE 175.00 2,060.10 220.00 2,589.84 250.00 2,943.00
0029 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 4.536  MILE 225.00 1,020.60 220.00 997.92 200.00 907.20
0030 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 36.3    MILE 475.00 17,242.50 310.00 11,253.00 1.00 36.30
0031 713-05-00100 Temporary Pavement Legends & Symbols (Arrow) 10      EACH 22.00 220.00 25.00 250.00 20.00 200.00
0032 713-05-00300 Temporary Pavement Legends & Symbols (ONLY) 10      EACH 22.00 220.00 40.00 400.00 35.00 350.00
0033 713-05-00400 Temporary Pavement Legends & Symbols (RR Crossing) 6      EACH 60.00 360.00 55.00 330.00 50.00 300.00
0034 716-01-00100 Mulch (Vegetative) 14.6    TON 550.00 8,030.00 525.00 7,665.00 500.00 7,300.00
0035 717-01-00100 Seeding 439      LB 11.00 4,829.00 8.25 3,621.75 8.00 3,512.00
0036 718-01-00100 Fertilizer 7,310      LB 0.50 3,655.00 0.55 4,020.50 0.50 3,655.00
0037 726-01-00100 Bedding Material 59.2    CUYD 100.00 5,920.00 125.00 7,400.00 100.00 5,920.00
0038 727-01-00100 Mobilization 1      LUMP 75,000.00 75,000.00 137,000.00 137,000.00 150,000.00 150,000.00
0039 729-16-00200 Object Marker Assembly (Type 2) 5      EACH 88.00 440.00 90.00 450.00 100.00 500.00
0040 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 95.00 380.00 100.00 400.00 100.00 400.00
0041 731-02-00100 Reflectorized Raised Pavement Markers 1,273      EACH 5.50 7,001.50 6.00 7,638.00 8.00 10,184.00
0042 732-01-04080 Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) 22      LNFT 11.00 242.00 17.00 374.00 15.00 330.00
0043 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 12.444  MILE 2,600.00 32,354.40 2,575.00 32,043.30 3,200.00 39,820.80
0044 732-02-02040 Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) 0.062  MILE 5,700.00 353.40 9,200.00 570.40 9,000.00 558.00
0045 732-02-02080 Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) 0.121  MILE 15,500.00 1,875.50 23,000.00 2,783.00 25,000.00 3,025.00
0046 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.512  MILE 955.00 1,443.96 650.00 982.80 1,600.00 2,419.20
0047 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 2      EACH 210.00 420.00 200.00 400.00 300.00 600.00
0048 732-04-01100 Plastic Pavement Legends and Symbols (Arrow - Right Turn) 2      EACH 210.00 420.00 200.00 400.00 300.00 600.00
0049 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 4      EACH 210.00 840.00 325.00 1,300.00 500.00 2,000.00
0050 732-04-18000 Plastic Pavement Legends and Symbols (RR Crossing) 2      EACH 420.00 840.00 425.00 850.00 500.00 1,000.00
0051 732-05-00100 Removal of Existing Markings 0.336  MILE 2,500.00 840.00 3,800.00 1,276.80 5,000.00 1,680.00
0052 735-01-00100 Mailboxes 23      EACH 1.00 23.00 14.00 322.00 5.00 115.00
0053 735-02-00100 Mailbox Supports (Single) 19      EACH 125.00 2,375.00 111.00 2,109.00 125.00 2,375.00
0054 735-03-00100 Mailbox Supports (Double) 2      EACH 175.00 350.00 140.00 280.00 250.00 500.00
0055 740-01-00100 Construction Layout 1      LUMP 6,000.00 6,000.00 7,900.00 7,900.00 27,000.00 27,000.00
0056 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 2,147      INLF 2.45 5,260.15 1.45 3,113.15 2.00 4,294.00
                     
    CONTRACTOR TOTAL       2,011,305.51   2,268,927.69   2,709,320.00