Bid Tabulations
Letting of
06/26/2013
LA DOTD Headquarters
| Lead Project: H.009524.6 | |
| Parish: Lincoln | |
| Routes: US 80, LA 63, LA 150 | |
| Description: US167, US80, LA150 & US63: 0.23 MI S US 80 TO N RUSTON C/L | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE, PAVEMENT PATCHING, AND RELATED WORK. | |
| Estimated Construction Cost: $1,920,301.76 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05789 | D & J Construction Co., Inc. | $2,124,881.40 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,395,530.34 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - D & J Construction Co., Inc. |
- 2 - Diamond B Construction Co., L.L.C. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 2,000.00 | 4,000.00 | 3,000.00 | 6,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 17 | SQYD | 30.00 | 510.00 | 35.00 | 595.00 |
| 0003 | 202-02-32140 | Removal of Pipe (Storm Drain) 15" CLAY STORM DRAIN PIPE | 35 | LNFT | 25.00 | 875.00 | 30.00 | 1,050.00 |
| 0004 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" STORM DRAIN PIPE | 24 | LNFT | 50.00 | 1,200.00 | 56.00 | 1,344.00 |
| 0005 | 202-02-38260 | Removal of Sign Support Footings Sta. 370+79 Left | 1 | EACH | 600.00 | 600.00 | 4,000.00 | 4,000.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 5,446.1 | TON | 119.00 | 648,085.90 | 125.00 | 680,762.50 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 506.4 | TON | 172.00 | 87,100.80 | 250.00 | 126,600.00 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 49,507 | SQYD | 3.50 | 173,274.50 | 4.75 | 235,158.25 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,057 | CUYD | 1.00 | -2,057.00 | 1.00 | -2,057.00 |
| 0010 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 1,550 | SQYD | 150.00 | 232,500.00 | 140.00 | 217,000.00 |
| 0011 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 1,700 | LNFT | 2.00 | 3,400.00 | 2.30 | 3,910.00 |
| 0012 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,350 | LNFT | 3.00 | 4,050.00 | 2.00 | 2,700.00 |
| 0013 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 8.7 | SQYD | 250.00 | 2,175.00 | 200.00 | 1,740.00 |
| 0014 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 428 | SQYD | 200.00 | 85,600.00 | 175.00 | 74,900.00 |
| 0015 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 644 | SQYD | 175.00 | 112,700.00 | 175.00 | 112,700.00 |
| 0016 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 83 | LNFT | 115.00 | 9,545.00 | 150.00 | 12,450.00 |
| 0017 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 24 | LNFT | 175.00 | 4,200.00 | 220.00 | 5,280.00 |
| 0018 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,000.00 | 3,000.00 | 900.00 | 2,700.00 |
| 0019 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 3,500.00 | 7,000.00 | 3,500.00 | 7,000.00 |
| 0020 | 702-03-00800 | Catch Basins (CB-09) | 2 | EACH | 5,000.00 | 10,000.00 | 4,500.00 | 9,000.00 |
| 0021 | 702-04-00100 | Adjusting Manholes | 58 | EACH | 1,500.00 | 87,000.00 | 1,250.00 | 72,500.00 |
| 0022 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 120 | SQYD | 90.00 | 10,800.00 | 60.00 | 7,200.00 |
| 0023 | 706-04-00100 | Handicapped Curb Ramps Type 1 | 17 | EACH | 1,200.00 | 20,400.00 | 1,200.00 | 20,400.00 |
| 0024 | 706-04-00100 | Handicapped Curb Ramps Type 14 | 3 | EACH | 1,500.00 | 4,500.00 | 1,500.00 | 4,500.00 |
| 0025 | 706-04-00100 | Handicapped Curb Ramps Type 4 | 63 | EACH | 1,200.00 | 75,600.00 | 1,200.00 | 75,600.00 |
| 0026 | 706-04-00100 | Handicapped Curb Ramps Type 6 | 1 | EACH | 1,200.00 | 1,200.00 | 1,300.00 | 1,300.00 |
| 0027 | 707-01-00200 | Concrete Curb (Barrier) | 75 | LNFT | 30.00 | 2,250.00 | 25.00 | 1,875.00 |
| 0028 | 707-01-00300 | Concrete Curb (Mountable) | 197 | LNFT | 25.00 | 4,925.00 | 25.00 | 4,925.00 |
| 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 142,000.00 | 142,000.00 | 275,000.00 | 275,000.00 |
| 0030 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 4,192 | LNFT | 0.25 | 1,048.00 | 0.12 | 503.04 |
| 0031 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,520 | LNFT | 0.50 | 1,760.00 | 0.25 | 880.00 |
| 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 888 | LNFT | 0.75 | 666.00 | 0.65 | 577.20 |
| 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.964 | MILE | 250.00 | 1,741.00 | 175.00 | 1,218.70 |
| 0034 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.084 | MILE | 250.00 | 1,771.00 | 225.00 | 1,593.90 |
| 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 11.264 | MILE | 500.00 | 5,632.00 | 450.00 | 5,068.80 |
| 0036 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 150.00 | 600.00 | 30.00 | 120.00 |
| 0037 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 8 | EACH | 400.00 | 3,200.00 | 60.00 | 480.00 |
| 0038 | 726-01-00100 | Bedding Material | 30 | CUYD | 100.00 | 3,000.00 | 125.00 | 3,750.00 |
| 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 165,000.00 | 165,000.00 | 175,000.00 | 175,000.00 |
| 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 559 | EACH | 6.00 | 3,354.00 | 5.00 | 2,795.00 |
| 0041 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 6,328 | LNFT | 1.50 | 9,492.00 | 1.25 | 7,910.00 |
| 0042 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,599 | LNFT | 2.00 | 5,198.00 | 1.25 | 3,248.75 |
| 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 824 | LNFT | 9.00 | 7,416.00 | 5.50 | 4,532.00 |
| 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.632 | MILE | 3,000.00 | 16,896.00 | 2,500.00 | 14,080.00 |
| 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.542 | MILE | 1,000.00 | 3,542.00 | 700.00 | 2,479.40 |
| 0046 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 350.00 | 350.00 | 250.00 | 250.00 |
| 0047 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 53 | EACH | 300.00 | 15,900.00 | 250.00 | 13,250.00 |
| 0048 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 300.00 | 1,800.00 | 250.00 | 1,500.00 |
| 0049 | 732-04-08000 | Plastic Pavement Legends and Symbols (Handicap Markings) (4" Width - Blue) | 404 | LNFT | 2.00 | 808.00 | 1.25 | 505.00 |
| 0050 | 732-04-08040 | Plastic Pavement Legends and Symbols (Handicap Parking) | 2 | EACH | 500.00 | 1,000.00 | 250.00 | 500.00 |
| 0051 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 10 | EACH | 600.00 | 6,000.00 | 250.00 | 2,500.00 |
| 0052 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 600.00 | 2,400.00 | 250.00 | 1,000.00 |
| 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 13,500.00 | 13,500.00 |
| 0054 | 741-11-00100 | Adjusting Water Valve | 17 | EACH | 900.00 | 15,300.00 | 900.00 | 15,300.00 |
| 0055 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 18,670 | LNFT | 1.50 | 28,005.00 | 2.00 | 37,340.00 |
| 0056 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 12,110 | LNFT | 1.50 | 18,165.00 | 2.00 | 24,220.00 |
| 0057 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 30,780 | LNFT | 1.25 | 38,475.00 | 1.65 | 50,787.00 |
| 0058 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 25,046 | INLF | 0.30 | 7,513.80 | 1.00 | 25,046.00 |
| 0059 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 18,536 | INLF | 0.40 | 7,414.40 | 1.05 | 19,462.80 |
| CONTRACTOR TOTAL | 2,124,881.40 | 2,395,530.34 | ||||||