Bid Tabulations
Letting of
03/14/2012
LA DOTD Headquarters
| Lead Project: H.009519.6 | |
| Parish: East Feliciana | |
| Routes: LA 432 | |
| Description: LA 432: THIN ASPHALTIC CONCRETE OVERLAY | |
| Type Const: PAVEMENT PATCHING, THIN ASPHALTIC CONCRETE OVERLAY, STRIPING AND RELATED WORK | |
| Estimated Construction Cost: $695,776.98 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $595,590.60 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $709,763.65 |
| 3 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $723,673.65 |
| 4 | 00481 | Coastal Bridge Co., L.L.C. | $755,473.20 |
| 5 | 06276 | Barriere Construction Co., LLC. | $768,023.80 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barber Bros. Contracting Co., L.L.C |
- 2 - Diamond B Construction Co., L.L.C. |
- 3 - F.G. Sullivan, Jr. Contractor LLC |
- 4 - Coastal Bridge Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 204-02-00100 | Temporary Hay or Straw Bales | 16 | EACH | 25.00 | 400.00 | 17.00 | 272.00 | 15.00 | 240.00 | 12.00 | 192.00 |
| 0002 | 204-06-00100 | Temporary Silt Fencing | 1,845 | LNFT | 2.00 | 3,690.00 | 5.00 | 9,225.00 | 1.45 | 2,675.25 | 1.60 | 2,952.00 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 683 | CUYD | 5.00 | 3,415.00 | 82.00 | 56,006.00 | 35.00 | 23,905.00 | 40.00 | 27,320.00 |
| 0005 | 501-02-00001 | Tack Coat QUANTITY IS FOR THIN ASPHALTIC CONCRETE LAYER ONLY | 9,022 | GAL | 4.00 | 36,088.00 | 4.00 | 36,088.00 | 3.75 | 33,832.50 | 6.25 | 56,387.50 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 825 | SQYD | 75.00 | 61,875.00 | 100.00 | 82,500.00 | 85.00 | 70,125.00 | 80.00 | 66,000.00 |
| 0007 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | 10,000.00 | 10,000.00 |
| 0008 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.66 | MILE | 500.00 | 2,330.00 | 180.00 | 838.80 | 500.00 | 2,330.00 | 200.00 | 932.00 |
| 0009 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.554 | MILE | 100.00 | 1,455.40 | 325.00 | 4,730.05 | 100.00 | 1,455.40 | 500.00 | 7,277.00 |
| 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 | 58,000.00 | 58,000.00 | 50,000.00 | 50,000.00 |
| 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 616 | EACH | 6.50 | 4,004.00 | 6.00 | 3,696.00 | 4.75 | 2,926.00 | 6.00 | 3,696.00 |
| 0012 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.554 | MILE | 3,000.00 | 43,662.00 | 3,500.00 | 50,939.00 | 2,600.00 | 37,840.40 | 2,750.00 | 40,023.50 |
| 0013 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.216 | MILE | 1,000.00 | 3,216.00 | 2,000.00 | 6,432.00 | 850.00 | 2,733.60 | 950.00 | 3,055.20 |
| 0014 | 732-05-00100 | Removal of Existing Markings Removal of Raised Pavement Markers Only | 4.66 | MILE | 300.00 | 1,398.00 | 400.00 | 1,864.00 | 325.00 | 1,514.50 | 4,000.00 | 18,640.00 |
| 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 18,300.00 | 18,300.00 | 5,500.00 | 5,500.00 | 10,000.00 | 10,000.00 |
| 0016 | NS-500-00280 | Surface Preparation | 1 | LUMP | 75,000.00 | 75,000.00 | 70,000.00 | 70,000.00 | 45,000.00 | 45,000.00 | 25,000.00 | 25,000.00 |
| 0017 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 44,928 | INLF | 0.15 | 6,739.20 | 0.10 | 4,492.80 | 0.50 | 22,464.00 | 1.00 | 44,928.00 |
| 0018 | 501-01-00005 | Thin Asphaltic Concrete (Coarse Mix) | 2,593.8 | TON | 110.00 | 285,318.00 | 100.00 | 259,380.00 | 140.00 | 363,132.00 | 150.00 | 389,070.00 |
| CONTRACTOR TOTAL | 595,590.60 | 709,763.65 | 723,673.65 | 755,473.20 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Barriere Construction Co., LLC. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 204-02-00100 | Temporary Hay or Straw Bales | 16 | EACH | 30.00 | 480.00 |
| 0002 | 204-06-00100 | Temporary Silt Fencing | 1,845 | LNFT | 1.50 | 2,767.50 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 683 | CUYD | 1.00 | 683.00 |
| 0005 | 501-02-00001 | Tack Coat QUANTITY IS FOR THIN ASPHALTIC CONCRETE LAYER ONLY | 9,022 | GAL | 4.00 | 36,088.00 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 825 | SQYD | 75.00 | 61,875.00 |
| 0007 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 |
| 0008 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.66 | MILE | 120.00 | 559.20 |
| 0009 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.554 | MILE | 330.00 | 4,802.82 |
| 0010 | 727-01-00100 | Mobilization | 1 | LUMP | 66,000.00 | 66,000.00 |
| 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 616 | EACH | 10.00 | 6,160.00 |
| 0012 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.554 | MILE | 2,750.00 | 40,023.50 |
| 0013 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.216 | MILE | 900.00 | 2,894.40 |
| 0014 | 732-05-00100 | Removal of Existing Markings Removal of Raised Pavement Markers Only | 4.66 | MILE | 1,200.00 | 5,592.00 |
| 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 |
| 0016 | NS-500-00280 | Surface Preparation | 1 | LUMP | 42,000.00 | 42,000.00 |
| 0017 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 44,928 | INLF | 0.01 | 449.28 |
| 0018 | 501-01-00005 | Thin Asphaltic Concrete (Coarse Mix) | 2,593.8 | TON | 169.50 | 439,649.10 |
| CONTRACTOR TOTAL | 768,023.80 | |||||