Bid Tabulations
Letting of
09/25/2013
LA DOTD Headquarters
| Lead Project: H.009465.6 | |
| Parish: St. John | |
| Routes: US 61 | |
| Description: US 61: LEFT TURN LANE EXTENSION AT LA 54 | |
| Type Const: SUPERPAVE ASPHALTIC CONCRETE OVERLAY, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT WIDENING, AND RELATED WORK. | |
| Estimated Construction Cost: $162,856.39 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00935 | Fleming Construction Co., LLC | $137,886.65 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $159,432.25 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $254,340.40 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Fleming Construction Co., LLC |
- 2 - Barber Bros. Contracting Co., L.L.C |
- 3 - Byron E. Talbot Contractor, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06060 | Removal of Concrete Catch Basin BOTH ARE CB-01 | 2 | EACH | 350.00 | 700.00 | 600.00 | 1,200.00 | 600.00 | 1,200.00 |
| 0002 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" EQ RCPA | 14 | LNFT | 40.00 | 560.00 | 85.00 | 1,190.00 | 25.00 | 350.00 |
| 0003 | 203-03-00100 | Embankment | 78.11 | CUYD | 30.00 | 2,343.30 | 75.00 | 5,858.25 | 45.00 | 3,514.95 |
| 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 8 | EACH | 25.00 | 200.00 | 25.00 | 200.00 | 25.00 | 200.00 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 400 | LNFT | 2.00 | 800.00 | 2.00 | 800.00 | 4.50 | 1,800.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 159.3 | TON | 150.00 | 23,895.00 | 125.00 | 19,912.50 | 170.00 | 27,081.00 |
| 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 1,448 | SQYD | 7.00 | 10,136.00 | 5.00 | 7,240.00 | 5.50 | 7,964.00 |
| 0008 | 510-02-00100 | Pavement Widening | 670 | SQYD | 95.00 | 63,650.00 | 75.00 | 50,250.00 | 175.00 | 117,250.00 |
| 0009 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 16 | LNFT | 200.00 | 3,200.00 | 160.00 | 2,560.00 | 500.00 | 8,000.00 |
| 0010 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 4,000.00 | 8,000.00 | 2,500.00 | 5,000.00 | 4,000.00 | 8,000.00 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,000.00 | 6,000.00 | 25,000.00 | 25,000.00 | 19,000.00 | 19,000.00 |
| 0012 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,620 | LNFT | 0.13 | 210.60 | 0.30 | 486.00 | 0.15 | 243.00 |
| 0013 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 580 | LNFT | 0.25 | 145.00 | 0.60 | 348.00 | 0.30 | 174.00 |
| 0014 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 45.00 | 90.00 | 50.00 | 100.00 | 50.00 | 100.00 |
| 0015 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 500.00 | 250.00 | 1,200.00 | 600.00 | 1,550.00 | 775.00 |
| 0016 | 717-01-00100 | Seeding | 7.5 | LB | 20.00 | 150.00 | 12.00 | 90.00 | 32.00 | 240.00 |
| 0017 | 718-01-00100 | Fertilizer | 250 | LB | 2.00 | 500.00 | 2.50 | 625.00 | 2.25 | 562.50 |
| 0018 | 726-01-00100 | Bedding Material | 6.4 | CUYD | 80.00 | 512.00 | 125.00 | 800.00 | 140.00 | 896.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 43,500.00 | 43,500.00 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 29 | EACH | 10.00 | 290.00 | 25.00 | 725.00 | 10.80 | 313.20 |
| 0021 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 810 | LNFT | 1.00 | 810.00 | 1.75 | 1,417.50 | 1.10 | 891.00 |
| 0022 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 290 | LNFT | 2.50 | 725.00 | 3.50 | 1,015.00 | 2.70 | 783.00 |
| 0023 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.027 | MILE | 3,000.00 | 81.00 | 10,000.00 | 270.00 | 3,250.00 | 87.75 |
| 0024 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 215.00 | 430.00 | 400.00 | 800.00 | 235.00 | 470.00 |
| 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 8,000.00 | 8,000.00 |
| 0026 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,945 | INLF | 0.75 | 2,208.75 | 1.00 | 2,945.00 | 1.00 | 2,945.00 |
| CONTRACTOR TOTAL | 137,886.65 | 159,432.25 | 254,340.40 | |||||||