Bid Tabulations
Letting of
12/12/2012
LA DOTD Headquarters
| Lead Project: H.009446.6 | |
| Parish: Tangipahoa | |
| Routes: US 190 | |
| Description: US 190: WESTIN OAKS – CHURCH ST. | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $736,441.49 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC. | $885,225.00 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,258,846.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC. |
- 2 - Diamond B Construction Co., L.L.C. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-00010 | Removal of Crepe Myrtle Trees | 5 | EACH | 120.00 | 600.00 | 200.00 | 1,000.00 |
| 0002 | 202-02-06060 | Removal of Concrete Catch Basin CB-06 | 1 | EACH | 1,800.00 | 1,800.00 | 5,000.00 | 5,000.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 291 | LNFT | 17.00 | 4,947.00 | 25.00 | 7,275.00 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 3,766 | LNFT | 16.00 | 60,256.00 | 13.00 | 48,958.00 |
| 0005 | 202-02-26300 | Removal of Median / Island | 230.7 | SQYD | 16.00 | 3,691.20 | 20.00 | 4,614.00 |
| 0006 | 203-01-00100 | General Excavation | 234 | CUYD | 25.00 | 5,850.00 | 15.00 | 3,510.00 |
| 0007 | 204-02-00100 | Temporary Hay or Straw Bales | 12 | EACH | 15.00 | 180.00 | 110.00 | 1,320.00 |
| 0008 | 302-02-06000 | Class II Base Course (12" Thick) | 702.9 | SQYD | 35.00 | 24,601.50 | 85.00 | 59,746.50 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 2,965.8 | TON | 108.00 | 320,306.40 | 115.00 | 341,067.00 |
| 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 220.3 | TON | 140.00 | 30,842.00 | 189.00 | 41,636.70 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 25,379 | SQYD | 2.00 | 50,758.00 | 5.00 | 126,895.00 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,409.9 | CUYD | 25.00 | -35,247.50 | 0.01 | -14.10 |
| 0013 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 6,000.00 | 6,000.00 | 11,200.00 | 11,200.00 |
| 0014 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 2,335.8 | SQYD | 40.00 | 93,432.00 | 50.00 | 116,790.00 |
| 0015 | 707-03-00100 | Combination Concrete Curb and Gutter | 5,465 | LNFT | 25.00 | 136,625.00 | 25.00 | 136,625.00 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 200,000.00 | 200,000.00 |
| 0017 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 20,680 | LNFT | 0.13 | 2,688.40 | 0.10 | 2,068.00 |
| 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 150 | LNFT | 0.90 | 135.00 | 0.90 | 135.00 |
| 0019 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 10 | EACH | 40.00 | 400.00 | 31.00 | 310.00 |
| 0020 | 726-01-00100 | Bedding Material | 1.6 | CUYD | 60.00 | 96.00 | 45.00 | 72.00 |
| 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 95,500.00 | 95,500.00 |
| 0022 | 729-01-00100 | Sign (Type A) | 23 | SQFT | 50.00 | 1,150.00 | 45.00 | 1,035.00 |
| 0023 | 729-21-00100 | U-Channel Post | 2 | EACH | 120.00 | 240.00 | 120.00 | 240.00 |
| 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 328 | EACH | 6.00 | 1,968.00 | 6.00 | 1,968.00 |
| 0025 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 20,680 | LNFT | 0.55 | 11,374.00 | 0.55 | 11,374.00 |
| 0026 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 150 | LNFT | 5.50 | 825.00 | 6.00 | 900.00 |
| 0027 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 7 | EACH | 300.00 | 2,100.00 | 250.00 | 1,750.00 |
| 0028 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 275.00 | 550.00 | 250.00 | 500.00 |
| 0029 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 1 | EACH | 300.00 | 300.00 | 300.00 | 300.00 |
| 0030 | 737-05-00001 | Painted Curbs and Islands STA 29+83.14 to STA 30+70.57 (Located on Church St.) | 102.5 | LNFT | 10.00 | 1,025.00 | 10.00 | 1,025.00 |
| 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 21,500.00 | 21,500.00 |
| 0032 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 72,732 | INLF | 1.00 | 72,732.00 | 0.20 | 14,546.40 |
| CONTRACTOR TOTAL | 885,225.00 | 1,258,846.50 | ||||||