Bid Tabulations
Letting of
04/10/2013
LA DOTD Headquarters
| Lead Project: H.009422.6 | |
| Parish: St. James | |
| Routes: LA 70 | |
| Description: LA 70: CLOSEMED, DRIVES/SIGNAL/UPGRD/RESTR | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, EXCAVATION AND EMBANKMENT, SUPERASPHALTIC CONCRETE PAVEMENT, ANDRELATED WORK. | |
| Estimated Construction Cost: $754,889.09 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00481 | Coastal Bridge Co., L.L.C. | $684,649.28 |
| 2 | 06276 | Barriere Construction Co., LLC | $849,889.46 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $889,955.88 |
| 4 | 00935 | Fleming Construction Co., LLC | $904,189.91 |
| 5 | 00046 | Barber Bros. Contracting Co., L.L.C | $975,755.10 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Coastal Bridge Co., L.L.C. |
- 2 - Barriere Construction Co., LLC |
- 3 - Byron E. Talbot Contractor, Inc. |
- 4 - Fleming Construction Co., LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06040 | Removal of Concrete Box Headwall STA 501+33, STA 504+00 | 2 | EACH | 1,500.00 | 3,000.00 | 5,500.00 | 11,000.00 | 450.00 | 900.00 | 1,500.00 | 3,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 35 | SQYD | 11.00 | 385.00 | 30.00 | 1,050.00 | 10.00 | 350.00 | 20.00 | 700.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) STA 12+00 | 52 | LNFT | 20.00 | 1,040.00 | 38.00 | 1,976.00 | 6.50 | 338.00 | 15.00 | 780.00 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,916.2 | SQYD | 35.00 | 67,067.00 | 6.50 | 12,455.30 | 15.00 | 28,743.00 | 10.00 | 19,162.00 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 18,000.00 | 18,000.00 | 40,000.00 | 40,000.00 | 47,000.00 | 47,000.00 |
| 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,975 | CUYD | 1.00 | 4,975.00 | 25.00 | 124,375.00 | 16.30 | 81,092.50 | 20.00 | 99,500.00 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 15 | EACH | 25.00 | 375.00 | 100.00 | 1,500.00 | 30.00 | 450.00 | 20.00 | 300.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 1,500 | LNFT | 1.00 | 1,500.00 | 1.00 | 1,500.00 | 2.00 | 3,000.00 | 2.00 | 3,000.00 |
| 0009 | 302-02-06100 | Class II Base Course (12" Thick) (Stone) | 4,870 | SQYD | 30.00 | 146,100.00 | 7.00 | 34,090.00 | 29.00 | 141,230.00 | 25.00 | 121,750.00 |
| 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 75 | CUYD | 25.00 | 1,875.00 | 75.00 | 5,625.00 | 70.00 | 5,250.00 | 40.00 | 3,000.00 |
| 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 2,119.5 | TON | 88.00 | 186,516.00 | 115.00 | 243,742.50 | 120.00 | 254,340.00 | 120.00 | 254,340.00 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 1,294 | SQYD | 6.00 | 7,764.00 | 7.00 | 9,058.00 | 5.50 | 7,117.00 | 10.00 | 12,940.00 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -72 | CUYD | 0.01 | -0.72 | 5.00 | -360.00 | 1.00 | -72.00 | 1.00 | -72.00 |
| 0014 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 64 | LNFT | 85.00 | 5,440.00 | 152.00 | 9,728.00 | 125.00 | 8,000.00 | 150.00 | 9,600.00 |
| 0015 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 80 | LNFT | 45.00 | 3,600.00 | 152.00 | 12,160.00 | 85.00 | 6,800.00 | 150.00 | 12,000.00 |
| 0016 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 48 | LNFT | 80.00 | 3,840.00 | 148.00 | 7,104.00 | 125.00 | 6,000.00 | 200.00 | 9,600.00 |
| 0017 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,000.00 | 2,000.00 | 1,800.00 | 3,600.00 | 450.00 | 900.00 | 3,000.00 | 6,000.00 |
| 0018 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 2,500.00 | 5,000.00 | 3,300.00 | 6,600.00 | 3,500.00 | 7,000.00 | 3,500.00 | 7,000.00 |
| 0019 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,000.00 | 2,000.00 | 3,500.00 | 3,500.00 | 500.00 | 500.00 | 2,750.00 | 2,750.00 |
| 0020 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 887.2 | SQYD | 50.00 | 44,360.00 | 47.50 | 42,142.00 | 55.50 | 49,239.60 | 70.00 | 62,104.00 |
| 0021 | 707-01-00300 | Concrete Curb (Mountable) | 2,427 | LNFT | 25.00 | 60,675.00 | 22.00 | 53,394.00 | 22.00 | 53,394.00 | 20.00 | 48,540.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 87,000.00 | 87,000.00 | 42,500.00 | 42,500.00 | 20,000.00 | 20,000.00 |
| 0023 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,950 | LNFT | 0.25 | 487.50 | 0.28 | 546.00 | 0.25 | 487.50 | 0.22 | 429.00 |
| 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 300 | LNFT | 0.75 | 225.00 | 0.90 | 270.00 | 0.80 | 240.00 | 0.75 | 225.00 |
| 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.309 | MILE | 550.00 | 169.95 | 525.00 | 162.23 | 2,650.00 | 818.85 | 475.00 | 146.78 |
| 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.217 | MILE | 250.00 | 54.25 | 255.00 | 55.34 | 505.00 | 109.59 | 475.00 | 103.08 |
| 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.117 | MILE | 500.00 | 558.50 | 515.00 | 575.26 | 585.00 | 653.45 | 550.00 | 614.35 |
| 0028 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 9 | EACH | 25.00 | 225.00 | 26.00 | 234.00 | 50.00 | 450.00 | 45.00 | 405.00 |
| 0029 | 726-01-00100 | Bedding Material | 72.2 | CUYD | 1.00 | 72.20 | 128.00 | 9,241.60 | 75.00 | 5,415.00 | 80.00 | 5,776.00 |
| 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 60,000.00 | 60,000.00 | 50,000.00 | 50,000.00 | 80,000.00 | 80,000.00 |
| 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 120.00 | 960.00 | 130.00 | 1,040.00 | 145.00 | 1,160.00 | 120.00 | 960.00 |
| 0032 | 730-15-12200 | Relocate Light Poles (40') (Aluminum) (Twin Arm) | 1 | EACH | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | 5,300.00 | 5,300.00 | 5,000.00 | 5,000.00 |
| 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 270 | EACH | 5.00 | 1,350.00 | 6.00 | 1,620.00 | 5.65 | 1,525.50 | 5.25 | 1,417.50 |
| 0034 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,950 | LNFT | 1.50 | 2,925.00 | 1.75 | 3,412.50 | 1.45 | 2,827.50 | 1.35 | 2,632.50 |
| 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 300 | LNFT | 5.00 | 1,500.00 | 6.00 | 1,800.00 | 5.50 | 1,650.00 | 5.00 | 1,500.00 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.117 | MILE | 2,800.00 | 3,127.60 | 3,000.00 | 3,351.00 | 2,950.00 | 3,295.15 | 2,750.00 | 3,071.75 |
| 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.217 | MILE | 800.00 | 173.60 | 875.00 | 189.88 | 920.00 | 199.64 | 850.00 | 184.45 |
| 0038 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 225.00 | 450.00 | 245.00 | 490.00 | 290.00 | 580.00 | 265.00 | 530.00 |
| 0039 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 175.00 | 1,050.00 | 190.00 | 1,140.00 | 240.00 | 1,440.00 | 215.00 | 1,290.00 |
| 0040 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 175.00 | 525.00 | 190.00 | 570.00 | 240.00 | 720.00 | 215.00 | 645.00 |
| 0041 | 732-05-00100 | Removal of Existing Markings | 0.473 | MILE | 2,800.00 | 1,324.40 | 1,450.00 | 685.85 | 4,000.00 | 1,892.00 | 3,500.00 | 1,655.50 |
| 0042 | 739-01-00100 | Hydro-Seeding | 0.76 | ACRE | 1,850.00 | 1,406.00 | 1,850.00 | 1,406.00 | 1,960.00 | 1,489.60 | 2,000.00 | 1,520.00 |
| 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 | 6,000.00 | 6,000.00 |
| 0044 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 55,400 | INLF | 0.01 | 554.00 | 0.90 | 49,860.00 | 0.95 | 52,630.00 | 0.85 | 47,090.00 |
| CONTRACTOR TOTAL | 684,649.28 | 849,889.46 | 889,955.88 | 904,189.91 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Barber Bros. Contracting Co., L.L.C |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-02-06040 | Removal of Concrete Box Headwall STA 501+33, STA 504+00 | 2 | EACH | 1,500.00 | 3,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 35 | SQYD | 25.00 | 875.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) STA 12+00 | 52 | LNFT | 20.00 | 1,040.00 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,916.2 | SQYD | 6.00 | 11,497.20 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,000.00 | 40,000.00 |
| 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,975 | CUYD | 25.00 | 124,375.00 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 15 | EACH | 150.00 | 2,250.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 1,500 | LNFT | 2.00 | 3,000.00 |
| 0009 | 302-02-06100 | Class II Base Course (12" Thick) (Stone) | 4,870 | SQYD | 35.00 | 170,450.00 |
| 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 75 | CUYD | 100.00 | 7,500.00 |
| 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 2,119.5 | TON | 110.00 | 233,145.00 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 1,294 | SQYD | 5.00 | 6,470.00 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -72 | CUYD | 0.00 | 0.00 |
| 0014 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 64 | LNFT | 110.00 | 7,040.00 |
| 0015 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 80 | LNFT | 100.00 | 8,000.00 |
| 0016 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 48 | LNFT | 200.00 | 9,600.00 |
| 0017 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,500.00 | 3,000.00 |
| 0018 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 2,500.00 | 5,000.00 |
| 0019 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 3,000.00 | 3,000.00 |
| 0020 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 887.2 | SQYD | 60.00 | 53,232.00 |
| 0021 | 707-01-00300 | Concrete Curb (Mountable) | 2,427 | LNFT | 12.00 | 29,124.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 |
| 0023 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,950 | LNFT | 0.40 | 780.00 |
| 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 300 | LNFT | 1.00 | 300.00 |
| 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.309 | MILE | 600.00 | 185.40 |
| 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.217 | MILE | 500.00 | 108.50 |
| 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.117 | MILE | 1,000.00 | 1,117.00 |
| 0028 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 9 | EACH | 100.00 | 900.00 |
| 0029 | 726-01-00100 | Bedding Material | 72.2 | CUYD | 65.00 | 4,693.00 |
| 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 |
| 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 90.00 | 720.00 |
| 0032 | 730-15-12200 | Relocate Light Poles (40') (Aluminum) (Twin Arm) | 1 | EACH | 6,000.00 | 6,000.00 |
| 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 270 | EACH | 6.00 | 1,620.00 |
| 0034 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,950 | LNFT | 1.25 | 2,437.50 |
| 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 300 | LNFT | 6.00 | 1,800.00 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.117 | MILE | 6,000.00 | 6,702.00 |
| 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.217 | MILE | 1,500.00 | 325.50 |
| 0038 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 350.00 | 700.00 |
| 0039 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 350.00 | 2,100.00 |
| 0040 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 350.00 | 1,050.00 |
| 0041 | 732-05-00100 | Removal of Existing Markings | 0.473 | MILE | 6,000.00 | 2,838.00 |
| 0042 | 739-01-00100 | Hydro-Seeding | 0.76 | ACRE | 1,500.00 | 1,140.00 |
| 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 |
| 0044 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 55,400 | INLF | 1.60 | 88,640.00 |
| CONTRACTOR TOTAL | 975,755.10 | |||||