Bid Tabulations
Letting of
02/29/2012
LA DOTD Headquarters
| Lead Project: H.009324.6 | |
| Parish: St. Tammany | |
| Routes: | |
| Description: NORTH TOLL PLAZA LANE MODIFICATIONS | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $1,675,741.50 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,149,171.21 |
| 2 | 49356 | Kort's Trucking Inc. | $1,251,864.35 |
| 3 | 36961 | Cycle Construction Co. L.L.C. | $1,313,938.95 |
| 4 | 12198 | Byron E. Talbot Contractor, Inc. | $1,440,914.67 |
| 5 | 34567 | James Construction Group LLC | $1,449,702.74 |
| 6 | 48896 | Command Construction Industries LLC | $1,461,883.60 |
| 7 | 38325 | Great Southern Dredging Inc | $1,461,960.01 |
| 8 | 02179 | Boh Bros. Construction Co., LLC. | $1,720,203.71 |
| 9 | 39462 | Jb James Construction Llc | $1,725,616.25 |
| 10 | 38610 | Three C's Properties Inc | $1,935,836.76 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Kort's Trucking Inc. |
- 3 - Cycle Construction Co. L.L.C. |
- 4 - Byron E. Talbot Contractor, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 1,600.00 | 1,600.00 | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 | 6,500.00 | 6,500.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,500.00 | 1,500.00 | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 |
| 0003 | 202-02-00010 | Removal of Raised Reinforced Concrete Median | 5 | EACH | 600.00 | 3,000.00 | 2,500.00 | 12,500.00 | 800.00 | 4,000.00 | 3,500.00 | 17,500.00 |
| 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 600.00 | 600.00 | 350.00 | 350.00 |
| 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 1,855 | LNFT | 10.00 | 18,550.00 | 7.00 | 12,985.00 | 1.00 | 1,855.00 | 7.35 | 13,634.25 |
| 0006 | 202-02-26300 | Removal of Median / Island | 887 | SQYD | 1.00 | 887.00 | 10.00 | 8,870.00 | 10.00 | 8,870.00 | 14.25 | 12,639.75 |
| 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) (15"x15' RCP, Sta. 12+89, 87.79' Rt.) | 15 | LNFT | 70.00 | 1,050.00 | 10.00 | 150.00 | 35.00 | 525.00 | 20.00 | 300.00 |
| 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,827 | SQYD | 14.00 | 25,578.00 | 12.00 | 21,924.00 | 9.00 | 16,443.00 | 9.90 | 18,087.30 |
| 0009 | 202-02-38200 | Removal of Signs | 4 | EACH | 35.00 | 140.00 | 40.00 | 160.00 | 40.00 | 160.00 | 37.10 | 148.40 |
| 0010 | 202-02-38240 | Removal of Signs and Supports | 9 | EACH | 100.00 | 900.00 | 125.00 | 1,125.00 | 100.00 | 900.00 | 106.00 | 954.00 |
| 0011 | 202-03-00010 | Relocation of Guard Rail (1 at 90 L.F., 1 at 40 L.F.) | 2 | EACH | 1,900.00 | 3,800.00 | 2,000.00 | 4,000.00 | 2,100.00 | 4,200.00 | 2,000.00 | 4,000.00 |
| 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 |
| 0013 | 204-06-00100 | Temporary Silt Fencing | 910 | LNFT | 1.90 | 1,729.00 | 2.50 | 2,275.00 | 2.00 | 1,820.00 | 3.00 | 2,730.00 |
| 0014 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 153.6 | SQYD | 13.50 | 2,073.60 | 12.00 | 1,843.20 | 25.00 | 3,840.00 | 18.00 | 2,764.80 |
| 0015 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 3,746.3 | SQYD | 14.00 | 52,448.20 | 15.00 | 56,194.50 | 28.00 | 104,896.40 | 23.90 | 89,536.57 |
| 0016 | 304-05-00100 | Lime Treatment (Type E) (12" Thick) (9% by Volume) (To be Used as Directed by the Project Engineer) | 54 | TON | 5.00 | 270.00 | 320.00 | 17,280.00 | 50.00 | 2,700.00 | 1.00 | 54.00 |
| 0017 | 502-03-00100 | Superpave Asphaltic Concrete (2" Thick) | 153.6 | SQYD | 15.00 | 2,304.00 | 40.00 | 6,144.00 | 40.00 | 6,144.00 | 50.00 | 7,680.00 |
| 0018 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 3,507.2 | SQYD | 64.00 | 224,460.80 | 65.00 | 227,968.00 | 67.00 | 234,982.40 | 83.00 | 291,097.60 |
| 0019 | 602-01-00100 | Cleaning and Filling Existing Longitudinal Pavement Joints | 250 | LNFT | 32.15 | 8,037.50 | 5.00 | 1,250.00 | 15.00 | 3,750.00 | 3.15 | 787.50 |
| 0020 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 250 | LNFT | 10.70 | 2,675.00 | 5.00 | 1,250.00 | 12.00 | 3,000.00 | 3.15 | 787.50 |
| 0021 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 58 | SQYD | 250.00 | 14,500.00 | 100.00 | 5,800.00 | 175.00 | 10,150.00 | 200.00 | 11,600.00 |
| 0022 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 70 | SQYD | 230.00 | 16,100.00 | 100.00 | 7,000.00 | 170.00 | 11,900.00 | 160.00 | 11,200.00 |
| 0023 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 39 | LNFT | 70.00 | 2,730.00 | 50.00 | 1,950.00 | 100.00 | 3,900.00 | 80.00 | 3,120.00 |
| 0024 | 701-12-01000 | Corrugated Metal Pipe (Extension) (12") | 9 | LNFT | 130.00 | 1,170.00 | 50.00 | 450.00 | 100.00 | 900.00 | 200.00 | 1,800.00 |
| 0025 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,000.00 | 3,000.00 | 2,250.00 | 2,250.00 | 3,200.00 | 3,200.00 | 1,800.00 | 1,800.00 |
| 0026 | 702-03-00500 | Catch Basins (CB-06) | 5 | EACH | 4,200.00 | 21,000.00 | 2,500.00 | 12,500.00 | 4,800.00 | 24,000.00 | 2,800.00 | 14,000.00 |
| 0027 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 7,200.00 | 7,200.00 | 4,500.00 | 4,500.00 | 9,800.00 | 9,800.00 | 5,200.00 | 5,200.00 |
| 0028 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 15.1 | SQYD | 49.50 | 747.45 | 65.00 | 981.50 | 57.00 | 860.70 | 36.00 | 543.60 |
| 0029 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 36 | SQYD | 51.30 | 1,846.80 | 65.00 | 2,340.00 | 60.00 | 2,160.00 | 60.00 | 2,160.00 |
| 0030 | 707-01-00100 | Concrete Curb (Type "A", 12" Barrier) | 154.9 | LNFT | 19.65 | 3,043.79 | 25.00 | 3,872.50 | 24.00 | 3,717.60 | 30.00 | 4,647.00 |
| 0031 | 707-01-00100 | Concrete Curb (Retention Curb, See Sheet 2e) | 32 | LNFT | 34.25 | 1,096.00 | 30.00 | 960.00 | 40.00 | 1,280.00 | 30.00 | 960.00 |
| 0032 | 707-01-00200 | Concrete Curb (Barrier) | 3,309.2 | LNFT | 13.95 | 46,163.34 | 11.00 | 36,401.20 | 18.00 | 59,565.60 | 11.25 | 37,228.50 |
| 0033 | 707-01-00300 | Concrete Curb (Mountable) | 46 | LNFT | 18.60 | 855.60 | 12.00 | 552.00 | 38.00 | 1,748.00 | 12.40 | 570.40 |
| 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 65,000.00 | 65,000.00 | 31,000.00 | 31,000.00 | 55,000.00 | 55,000.00 |
| 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 6,000 | LNFT | 0.15 | 900.00 | 0.18 | 1,080.00 | 0.15 | 900.00 | 0.15 | 900.00 |
| 0036 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 150 | LNFT | 0.25 | 37.50 | 0.30 | 45.00 | 0.25 | 37.50 | 0.25 | 37.50 |
| 0037 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 64 | EACH | 330.00 | 21,120.00 | 900.00 | 57,600.00 | 550.00 | 35,200.00 | 225.00 | 14,400.00 |
| 0038 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 56 | EACH | 150.00 | 8,400.00 | 450.00 | 25,200.00 | 60.00 | 3,360.00 | 225.00 | 12,600.00 |
| 0039 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 1,410 | SQYD | 7.00 | 9,870.00 | 5.00 | 7,050.00 | 7.00 | 9,870.00 | 4.80 | 6,768.00 |
| 0040 | 716-01-00100 | Mulch (Vegetative) | 0.33 | TON | 1,700.00 | 561.00 | 4,000.00 | 1,320.00 | 1,700.00 | 561.00 | 90.00 | 29.70 |
| 0041 | 717-01-00100 | Seeding | 5 | LB | 23.00 | 115.00 | 30.00 | 150.00 | 25.00 | 125.00 | 79.50 | 397.50 |
| 0042 | 718-01-00100 | Fertilizer | 165 | LB | 1.00 | 165.00 | 5.00 | 825.00 | 1.00 | 165.00 | 0.70 | 115.50 |
| 0043 | 725-01-00100 | Temporary Detour Roads | 9.3 | SQYD | 180.00 | 1,674.00 | 125.00 | 1,162.50 | 140.00 | 1,302.00 | 100.00 | 930.00 |
| 0044 | 726-01-00100 | Bedding Material | 9 | CUYD | 95.00 | 855.00 | 25.00 | 225.00 | 72.00 | 648.00 | 50.00 | 450.00 |
| 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 |
| 0046 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 9 | SQFT | 18.00 | 162.00 | 19.00 | 171.00 | 20.00 | 180.00 | 19.10 | 171.90 |
| 0047 | 729-01-00103 | Sign (Type A)(Relocate) | 74 | SQFT | 12.00 | 888.00 | 13.00 | 962.00 | 13.00 | 962.00 | 12.75 | 943.50 |
| 0048 | 729-04-00103 | Sign (Type D)(Relocate) | 291 | SQFT | 15.50 | 4,510.50 | 15.00 | 4,365.00 | 17.00 | 4,947.00 | 15.90 | 4,626.90 |
| 0049 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 236 | SQFT | 30.00 | 7,080.00 | 30.00 | 7,080.00 | 32.00 | 7,552.00 | 30.75 | 7,257.00 |
| 0050 | 730-01-00100 | Trenching and Backfilling | 1,700 | LNFT | 4.30 | 7,310.00 | 5.00 | 8,500.00 | 5.00 | 8,500.00 | 4.50 | 7,650.00 |
| 0051 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(4#8, 1#10G) | 160 | LNFT | 9.00 | 1,440.00 | 8.80 | 1,408.00 | 8.00 | 1,280.00 | 9.35 | 1,496.00 |
| 0052 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(4#10, 2#10G) | 180 | LNFT | 7.00 | 1,260.00 | 6.80 | 1,224.00 | 10.00 | 1,800.00 | 7.25 | 1,305.00 |
| 0053 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(2#8, 1#10G) | 1,520 | LNFT | 6.00 | 9,120.00 | 5.60 | 8,512.00 | 6.00 | 9,120.00 | 6.00 | 9,120.00 |
| 0054 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(19#8, 4#10, 1#2G, 7#8G, 1#10G) | 100 | LNFT | 39.00 | 3,900.00 | 38.00 | 3,800.00 | 43.00 | 4,300.00 | 40.30 | 4,030.00 |
| 0055 | 730-02-02040 | Conduit with Conductors (Rigid Aluminum) (1") (2#10, 1#10G) | 80 | LNFT | 26.00 | 2,080.00 | 25.00 | 2,000.00 | 28.00 | 2,240.00 | 26.50 | 2,120.00 |
| 0056 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") (19#8, 4#10, 1#2G, 7#8G, 1#10G) | 5 | LNFT | 51.00 | 255.00 | 50.00 | 250.00 | 57.00 | 285.00 | 53.00 | 265.00 |
| 0057 | 730-04-00100 | Jacked or Bored Casing (4" Diameter) (PVC/HDPE) | 360 | LNFT | 21.00 | 7,560.00 | 21.35 | 7,686.00 | 25.00 | 9,000.00 | 22.65 | 8,154.00 |
| 0058 | 730-05-10000 | Light Pole (30')(Aluminum) | 8 | EACH | 3,300.00 | 26,400.00 | 3,356.25 | 26,850.00 | 3,800.00 | 30,400.00 | 3,600.00 | 28,800.00 |
| 0059 | 730-05-10000 | Light Pole (30')(Aluminum)(Twin Arm) | 3 | EACH | 3,500.00 | 10,500.00 | 3,570.00 | 10,710.00 | 4,000.00 | 12,000.00 | 3,800.00 | 11,400.00 |
| 0060 | 730-05-12200 | Light Pole (40') (Aluminum) (Twin Arm) | 1 | EACH | 3,800.00 | 3,800.00 | 3,882.50 | 3,882.50 | 4,400.00 | 4,400.00 | 4,200.00 | 4,200.00 |
| 0061 | 730-07-04000 | Luminaire (150 Watt) (High PressureSodium) (Low Mast) | 2 | EACH | 670.00 | 1,340.00 | 650.00 | 1,300.00 | 740.00 | 1,480.00 | 700.00 | 1,400.00 |
| 0062 | 730-07-05000 | Luminaire (250 Watt) (High PressureSodium) (Low Mast) | 14 | EACH | 670.00 | 9,380.00 | 650.00 | 9,100.00 | 740.00 | 10,360.00 | 700.00 | 9,800.00 |
| 0063 | 730-07-06000 | Luminaire (400 Watt) (High PressureSodium) (Install)(Under Canopy) | 4 | EACH | 160.00 | 640.00 | 160.00 | 640.00 | 180.00 | 720.00 | 200.00 | 800.00 |
| 0064 | 730-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 6,400.00 | 6,400.00 | 6,230.00 | 6,230.00 | 7,100.00 | 7,100.00 | 6,600.00 | 6,600.00 |
| 0065 | 730-09-00100 | Electrical System | 1 | LUMP | 19,000.00 | 19,000.00 | 25,000.00 | 25,000.00 | 21,000.00 | 21,000.00 | 20,000.00 | 20,000.00 |
| 0066 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 1,980.00 | 1,980.00 | 3,500.00 | 3,500.00 | 2,200.00 | 2,200.00 | 2,100.00 | 2,100.00 |
| 0067 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 10 | EACH | 517.00 | 5,170.00 | 500.00 | 5,000.00 | 200.00 | 2,000.00 | 550.00 | 5,500.00 |
| 0068 | 730-14-00100 | Removal and Disposal of Luminaires | 12 | EACH | 87.00 | 1,044.00 | 85.00 | 1,020.00 | 96.00 | 1,152.00 | 95.00 | 1,140.00 |
| 0069 | 730-16-00300 | Underground Junction Box (13" x 24") | 6 | EACH | 485.00 | 2,910.00 | 468.75 | 2,812.50 | 500.00 | 3,000.00 | 500.00 | 3,000.00 |
| 0070 | 730-19-00010 | Modular Breakaway Cable System | 12 | EACH | 1,900.00 | 22,800.00 | 1,867.50 | 22,410.00 | 2,100.00 | 25,200.00 | 2,000.00 | 24,000.00 |
| 0071 | 730-21-00020 | Duct Marker (Concrete) | 6 | EACH | 280.00 | 1,680.00 | 275.00 | 1,650.00 | 300.00 | 1,800.00 | 300.00 | 1,800.00 |
| 0072 | 730-22-00220 | Underground Marker Tape (3")(Detectable) | 1,470 | LNFT | 0.45 | 661.50 | 0.40 | 588.00 | 0.45 | 661.50 | 0.50 | 735.00 |
| 0073 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 4 | EACH | 10.50 | 42.00 | 20.00 | 80.00 | 11.00 | 44.00 | 10.60 | 42.40 |
| 0074 | 731-02-00100 | Reflectorized Raised Pavement Markers | 327 | EACH | 9.00 | 2,943.00 | 5.10 | 1,667.70 | 6.00 | 1,962.00 | 5.60 | 1,831.20 |
| 0075 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 10,543 | LNFT | 0.61 | 6,431.23 | 0.70 | 7,380.10 | 0.75 | 7,907.25 | 0.65 | 6,852.95 |
| 0076 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 4,315 | LNFT | 1.40 | 6,041.00 | 1.20 | 5,178.00 | 1.50 | 6,472.50 | 1.45 | 6,256.75 |
| 0077 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 55 | LNFT | 5.00 | 275.00 | 10.00 | 550.00 | 5.00 | 275.00 | 5.30 | 291.50 |
| 0078 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.071 | MILE | 8,000.00 | 568.00 | 12,000.00 | 852.00 | 8,400.00 | 596.40 | 7,950.00 | 564.45 |
| 0079 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.102 | MILE | 1,300.00 | 132.60 | 2,000.00 | 204.00 | 1,400.00 | 142.80 | 1,325.00 | 135.15 |
| 0080 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.05 | MILE | 3,000.00 | 150.00 | 2,500.00 | 125.00 | 3,400.00 | 170.00 | 3,180.00 | 159.00 |
| 0081 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.059 | MILE | 3,100.00 | 182.90 | 3,000.00 | 177.00 | 3,400.00 | 200.60 | 3,180.00 | 187.62 |
| 0082 | 732-03-04000 | Plastic Pavement Striping (Broken Line) (7" Width) (Preformed Tape) (Retroreflectivity Level I) Contrast | 1.069 | MILE | 6,000.00 | 6,414.00 | 9,600.00 | 10,262.40 | 6,800.00 | 7,269.20 | 6,360.00 | 6,798.84 |
| 0083 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 1 | EACH | 260.00 | 260.00 | 300.00 | 300.00 | 300.00 | 300.00 | 265.00 | 265.00 |
| 0084 | 732-04-19030 | Plastic Pavement Legends and Symbols (Number) (Preformed Heat Applied Retroreflective Thermoplastic) | 5 | EACH | 410.00 | 2,050.00 | 250.00 | 1,250.00 | 450.00 | 2,250.00 | 424.00 | 2,120.00 |
| 0085 | 732-05-00100 | Removal of Existing Markings | 1.069 | MILE | 3,600.00 | 3,848.40 | 5,000.00 | 5,345.00 | 4,000.00 | 4,276.00 | 3,710.00 | 3,965.99 |
| 0086 | 733-01-00100 | Concrete Roadway Barrier (Single Faced) | 253 | LNFT | 310.00 | 78,430.00 | 145.00 | 36,685.00 | 100.00 | 25,300.00 | 290.00 | 73,370.00 |
| 0087 | 737-05-00001 | Painted Curbs and Islands | 293 | LNFT | 2.00 | 586.00 | 3.00 | 879.00 | 6.00 | 1,758.00 | 5.00 | 1,465.00 |
| 0088 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 30,000.00 | 30,000.00 | 27,000.00 | 27,000.00 | 25,000.00 | 25,000.00 |
| 0089 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 480 | LNFT | 45.00 | 21,600.00 | 12.00 | 5,760.00 | 32.00 | 15,360.00 | 77.00 | 36,960.00 |
| 0090 | 805-01-00100 | Class A Concrete (Base Pedestals for Sign Supports) | 3 | CUYD | 1,700.00 | 5,100.00 | 2,000.00 | 6,000.00 | 980.00 | 2,940.00 | 1,765.00 | 5,295.00 |
| 0091 | 805-02-00100 | Class A(M) Concrete (Canopy) | 65 | CUYD | 800.00 | 52,000.00 | 625.00 | 40,625.00 | 900.00 | 58,500.00 | 1,250.00 | 81,250.00 |
| 0092 | 806-01-00100 | Deformed Reinforcing Steel | 14,363 | LB | 2.50 | 35,907.50 | 0.75 | 10,772.25 | 1.50 | 21,544.50 | 1.55 | 22,262.65 |
| 0093 | 807-08-00100 | Structural Metalwork (Maximum Clearance Warning Structure & Tag / Cash Sign Support) | 1 | LUMP | 14,500.00 | 14,500.00 | 40,000.00 | 40,000.00 | 16,000.00 | 16,000.00 | 32,000.00 | 32,000.00 |
| 0094 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 1,000.00 | 2,000.00 | 6,500.00 | 13,000.00 | 24,000.00 | 48,000.00 | 4,300.00 | 8,600.00 |
| 0095 | NS-700-00220 | Impact Attenuator (Kinetic) | 4 | EACH | 11,000.00 | 44,000.00 | 15,500.00 | 62,000.00 | 12,000.00 | 48,000.00 | 15,500.00 | 62,000.00 |
| 0096 | NS-701-00001 | Slotted Drain | 173 | LNFT | 250.00 | 43,250.00 | 200.00 | 34,600.00 | 225.00 | 38,925.00 | 350.00 | 60,550.00 |
| 0097 | NS-MSC-00120 | Drainage Structure (CB-Cap) | 6 | EACH | 1,000.00 | 6,000.00 | 1,000.00 | 6,000.00 | 850.00 | 5,100.00 | 700.00 | 4,200.00 |
| 0098 | NS-MSC-00120 | Drainage Structure (CB-Adjust) | 3 | EACH | 2,000.00 | 6,000.00 | 1,000.00 | 3,000.00 | 2,000.00 | 6,000.00 | 1,600.00 | 4,800.00 |
| 0099 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | 25.5 | SQYD | 70.00 | 1,785.00 | 125.00 | 3,187.50 | 240.00 | 6,120.00 | 125.00 | 3,187.50 |
| 0100 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,800 | INLF | 3.75 | 14,250.00 | 1.50 | 5,700.00 | 0.75 | 2,850.00 | 1.60 | 6,080.00 |
| CONTRACTOR TOTAL | 1,149,171.21 | 1,251,864.35 | 1,313,938.95 | 1,440,914.67 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - James Construction Group LLC |
- 6 - Command Construction Industries LLC |
- 7 - Great Southern Dredging Inc |
- 8 - Boh Bros. Construction Co., LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 6,610.00 | 6,610.00 | 5,000.00 | 5,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,150.00 | 5,150.00 | 25,000.00 | 25,000.00 | 4,123.00 | 4,123.00 | 63,500.00 | 63,500.00 |
| 0003 | 202-02-00010 | Removal of Raised Reinforced Concrete Median | 5 | EACH | 1,500.00 | 7,500.00 | 250.00 | 1,250.00 | 1,200.00 | 6,000.00 | 3,800.00 | 19,000.00 |
| 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 830.00 | 830.00 | 250.00 | 250.00 | 683.00 | 683.00 | 600.00 | 600.00 |
| 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 1,855 | LNFT | 3.00 | 5,565.00 | 25.00 | 46,375.00 | 6.00 | 11,130.00 | 5.00 | 9,275.00 |
| 0006 | 202-02-26300 | Removal of Median / Island | 887 | SQYD | 5.00 | 4,435.00 | 5.00 | 4,435.00 | 12.00 | 10,644.00 | 10.00 | 8,870.00 |
| 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) (15"x15' RCP, Sta. 12+89, 87.79' Rt.) | 15 | LNFT | 55.00 | 825.00 | 5.00 | 75.00 | 45.00 | 675.00 | 20.00 | 300.00 |
| 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,827 | SQYD | 14.00 | 25,578.00 | 25.00 | 45,675.00 | 13.00 | 23,751.00 | 12.00 | 21,924.00 |
| 0009 | 202-02-38200 | Removal of Signs | 4 | EACH | 35.00 | 140.00 | 1.00 | 4.00 | 46.00 | 184.00 | 42.00 | 168.00 |
| 0010 | 202-02-38240 | Removal of Signs and Supports | 9 | EACH | 100.00 | 900.00 | 1.00 | 9.00 | 132.00 | 1,188.00 | 14.00 | 126.00 |
| 0011 | 202-03-00010 | Relocation of Guard Rail (1 at 90 L.F., 1 at 40 L.F.) | 2 | EACH | 1,850.00 | 3,700.00 | 1,400.00 | 2,800.00 | 2,439.00 | 4,878.00 | 2,200.00 | 4,400.00 |
| 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 29,559.00 | 29,559.00 | 17,000.00 | 17,000.00 |
| 0013 | 204-06-00100 | Temporary Silt Fencing | 910 | LNFT | 3.00 | 2,730.00 | 5.00 | 4,550.00 | 2.40 | 2,184.00 | 3.00 | 2,730.00 |
| 0014 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 153.6 | SQYD | 18.00 | 2,764.80 | 20.00 | 3,072.00 | 12.00 | 1,843.20 | 19.00 | 2,918.40 |
| 0015 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 3,746.3 | SQYD | 27.00 | 101,150.10 | 25.00 | 93,657.50 | 21.00 | 78,672.30 | 20.00 | 74,926.00 |
| 0016 | 304-05-00100 | Lime Treatment (Type E) (12" Thick) (9% by Volume) (To be Used as Directed by the Project Engineer) | 54 | TON | 375.00 | 20,250.00 | 100.00 | 5,400.00 | 150.00 | 8,100.00 | 200.00 | 10,800.00 |
| 0017 | 502-03-00100 | Superpave Asphaltic Concrete (2" Thick) | 153.6 | SQYD | 25.00 | 3,840.00 | 40.00 | 6,144.00 | 26.00 | 3,993.60 | 37.00 | 5,683.20 |
| 0018 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 3,507.2 | SQYD | 80.00 | 280,576.00 | 60.00 | 210,432.00 | 67.00 | 234,982.40 | 65.00 | 227,968.00 |
| 0019 | 602-01-00100 | Cleaning and Filling Existing Longitudinal Pavement Joints | 250 | LNFT | 25.00 | 6,250.00 | 10.00 | 2,500.00 | 48.00 | 12,000.00 | 3.50 | 875.00 |
| 0020 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 250 | LNFT | 5.00 | 1,250.00 | 10.00 | 2,500.00 | 48.00 | 12,000.00 | 3.50 | 875.00 |
| 0021 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 58 | SQYD | 400.00 | 23,200.00 | 175.00 | 10,150.00 | 158.00 | 9,164.00 | 225.00 | 13,050.00 |
| 0022 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 70 | SQYD | 300.00 | 21,000.00 | 150.00 | 10,500.00 | 152.00 | 10,640.00 | 210.00 | 14,700.00 |
| 0023 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 39 | LNFT | 65.00 | 2,535.00 | 80.00 | 3,120.00 | 67.00 | 2,613.00 | 100.00 | 3,900.00 |
| 0024 | 701-12-01000 | Corrugated Metal Pipe (Extension) (12") | 9 | LNFT | 110.00 | 990.00 | 80.00 | 720.00 | 103.00 | 927.00 | 90.00 | 810.00 |
| 0025 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,600.00 | 3,600.00 | 2,500.00 | 2,500.00 | 2,759.00 | 2,759.00 | 4,500.00 | 4,500.00 |
| 0026 | 702-03-00500 | Catch Basins (CB-06) | 5 | EACH | 5,000.00 | 25,000.00 | 3,500.00 | 17,500.00 | 4,514.00 | 22,570.00 | 6,800.00 | 34,000.00 |
| 0027 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 7,800.00 | 7,800.00 | 6,500.00 | 6,500.00 | 5,433.00 | 5,433.00 | 12,500.00 | 12,500.00 |
| 0028 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 15.1 | SQYD | 75.00 | 1,132.50 | 75.00 | 1,132.50 | 77.00 | 1,162.70 | 50.00 | 755.00 |
| 0029 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 36 | SQYD | 70.00 | 2,520.00 | 80.00 | 2,880.00 | 93.00 | 3,348.00 | 60.00 | 2,160.00 |
| 0030 | 707-01-00100 | Concrete Curb (Type "A", 12" Barrier) | 154.9 | LNFT | 25.00 | 3,872.50 | 20.00 | 3,098.00 | 24.00 | 3,717.60 | 47.00 | 7,280.30 |
| 0031 | 707-01-00100 | Concrete Curb (Retention Curb, See Sheet 2e) | 32 | LNFT | 23.00 | 736.00 | 20.00 | 640.00 | 20.00 | 640.00 | 15.00 | 480.00 |
| 0032 | 707-01-00200 | Concrete Curb (Barrier) | 3,309.2 | LNFT | 17.00 | 56,256.40 | 10.00 | 33,092.00 | 11.00 | 36,401.20 | 18.00 | 59,565.60 |
| 0033 | 707-01-00300 | Concrete Curb (Mountable) | 46 | LNFT | 34.00 | 1,564.00 | 10.00 | 460.00 | 17.00 | 782.00 | 15.00 | 690.00 |
| 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 118,937.00 | 118,937.00 | 125,000.00 | 125,000.00 |
| 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 6,000 | LNFT | 0.13 | 780.00 | 0.10 | 600.00 | 0.20 | 1,200.00 | 0.16 | 960.00 |
| 0036 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 150 | LNFT | 0.22 | 33.00 | 1.00 | 150.00 | 0.40 | 60.00 | 0.26 | 39.00 |
| 0037 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 64 | EACH | 1,000.00 | 64,000.00 | 1,015.00 | 64,960.00 | 773.00 | 49,472.00 | 500.00 | 32,000.00 |
| 0038 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 56 | EACH | 150.00 | 8,400.00 | 115.00 | 6,440.00 | 44.00 | 2,464.00 | 150.00 | 8,400.00 |
| 0039 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 1,410 | SQYD | 5.95 | 8,389.50 | 4.00 | 5,640.00 | 2.60 | 3,666.00 | 6.50 | 9,165.00 |
| 0040 | 716-01-00100 | Mulch (Vegetative) | 0.33 | TON | 1,500.00 | 495.00 | 1,000.00 | 330.00 | 5,274.00 | 1,740.42 | 13.21 | 4.36 |
| 0041 | 717-01-00100 | Seeding | 5 | LB | 22.00 | 110.00 | 30.00 | 150.00 | 40.00 | 200.00 | 27.00 | 135.00 |
| 0042 | 718-01-00100 | Fertilizer | 165 | LB | 0.95 | 156.75 | 2.00 | 330.00 | 6.00 | 990.00 | 1.50 | 247.50 |
| 0043 | 725-01-00100 | Temporary Detour Roads | 9.3 | SQYD | 250.00 | 2,325.00 | 500.00 | 4,650.00 | 380.00 | 3,534.00 | 65.00 | 604.50 |
| 0044 | 726-01-00100 | Bedding Material | 9 | CUYD | 150.00 | 1,350.00 | 50.00 | 450.00 | 41.00 | 369.00 | 60.00 | 540.00 |
| 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 140,000.00 | 140,000.00 | 150,000.00 | 150,000.00 | 87,800.00 | 87,800.00 | 170,000.00 | 170,000.00 |
| 0046 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 9 | SQFT | 18.00 | 162.00 | 105.00 | 945.00 | 24.00 | 216.00 | 22.00 | 198.00 |
| 0047 | 729-01-00103 | Sign (Type A)(Relocate) | 74 | SQFT | 12.00 | 888.00 | 35.00 | 2,590.00 | 16.00 | 1,184.00 | 15.00 | 1,110.00 |
| 0048 | 729-04-00103 | Sign (Type D)(Relocate) | 291 | SQFT | 15.00 | 4,365.00 | 25.00 | 7,275.00 | 20.00 | 5,820.00 | 18.00 | 5,238.00 |
| 0049 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 236 | SQFT | 29.00 | 6,844.00 | 30.00 | 7,080.00 | 39.00 | 9,204.00 | 45.00 | 10,620.00 |
| 0050 | 730-01-00100 | Trenching and Backfilling | 1,700 | LNFT | 4.25 | 7,225.00 | 4.00 | 6,800.00 | 9.00 | 15,300.00 | 5.10 | 8,670.00 |
| 0051 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(4#8, 1#10G) | 160 | LNFT | 8.80 | 1,408.00 | 10.00 | 1,600.00 | 10.66 | 1,705.60 | 11.00 | 1,760.00 |
| 0052 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(4#10, 2#10G) | 180 | LNFT | 6.80 | 1,224.00 | 8.00 | 1,440.00 | 8.30 | 1,494.00 | 8.25 | 1,485.00 |
| 0053 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(2#8, 1#10G) | 1,520 | LNFT | 5.60 | 8,512.00 | 6.00 | 9,120.00 | 6.30 | 9,576.00 | 6.75 | 10,260.00 |
| 0054 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(19#8, 4#10, 1#2G, 7#8G, 1#10G) | 100 | LNFT | 38.00 | 3,800.00 | 40.00 | 4,000.00 | 50.00 | 5,000.00 | 45.50 | 4,550.00 |
| 0055 | 730-02-02040 | Conduit with Conductors (Rigid Aluminum) (1") (2#10, 1#10G) | 80 | LNFT | 25.00 | 2,000.00 | 25.00 | 2,000.00 | 31.00 | 2,480.00 | 30.00 | 2,400.00 |
| 0056 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") (19#8, 4#10, 1#2G, 7#8G, 1#10G) | 5 | LNFT | 50.00 | 250.00 | 60.00 | 300.00 | 103.00 | 515.00 | 60.00 | 300.00 |
| 0057 | 730-04-00100 | Jacked or Bored Casing (4" Diameter) (PVC/HDPE) | 360 | LNFT | 21.35 | 7,686.00 | 40.00 | 14,400.00 | 50.00 | 18,000.00 | 26.00 | 9,360.00 |
| 0058 | 730-05-10000 | Light Pole (30')(Aluminum) | 8 | EACH | 3,350.00 | 26,800.00 | 3,500.00 | 28,000.00 | 4,986.00 | 39,888.00 | 4,025.00 | 32,200.00 |
| 0059 | 730-05-10000 | Light Pole (30')(Aluminum)(Twin Arm) | 3 | EACH | 3,570.00 | 10,710.00 | 4,000.00 | 12,000.00 | 5,264.00 | 15,792.00 | 4,300.00 | 12,900.00 |
| 0060 | 730-05-12200 | Light Pole (40') (Aluminum) (Twin Arm) | 1 | EACH | 3,890.00 | 3,890.00 | 5,000.00 | 5,000.00 | 5,579.00 | 5,579.00 | 4,700.00 | 4,700.00 |
| 0061 | 730-07-04000 | Luminaire (150 Watt) (High PressureSodium) (Low Mast) | 2 | EACH | 650.00 | 1,300.00 | 700.00 | 1,400.00 | 1,090.00 | 2,180.00 | 800.00 | 1,600.00 |
| 0062 | 730-07-05000 | Luminaire (250 Watt) (High PressureSodium) (Low Mast) | 14 | EACH | 650.00 | 9,100.00 | 700.00 | 9,800.00 | 1,085.00 | 15,190.00 | 800.00 | 11,200.00 |
| 0063 | 730-07-06000 | Luminaire (400 Watt) (High PressureSodium) (Install)(Under Canopy) | 4 | EACH | 160.00 | 640.00 | 200.00 | 800.00 | 834.00 | 3,336.00 | 200.00 | 800.00 |
| 0064 | 730-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 6,230.00 | 6,230.00 | 7,500.00 | 7,500.00 | 4,794.00 | 4,794.00 | 7,500.00 | 7,500.00 |
| 0065 | 730-09-00100 | Electrical System | 1 | LUMP | 18,575.00 | 18,575.00 | 25,000.00 | 25,000.00 | 8,874.00 | 8,874.00 | 22,500.00 | 22,500.00 |
| 0066 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 1,900.00 | 1,900.00 | 2,000.00 | 2,000.00 | 5,479.00 | 5,479.00 | 2,300.00 | 2,300.00 |
| 0067 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 10 | EACH | 500.00 | 5,000.00 | 2,000.00 | 20,000.00 | 1,401.00 | 14,010.00 | 600.00 | 6,000.00 |
| 0068 | 730-14-00100 | Removal and Disposal of Luminaires | 12 | EACH | 85.00 | 1,020.00 | 50.00 | 600.00 | 650.00 | 7,800.00 | 100.00 | 1,200.00 |
| 0069 | 730-16-00300 | Underground Junction Box (13" x 24") | 6 | EACH | 470.00 | 2,820.00 | 750.00 | 4,500.00 | 634.00 | 3,804.00 | 575.00 | 3,450.00 |
| 0070 | 730-19-00010 | Modular Breakaway Cable System | 12 | EACH | 1,865.00 | 22,380.00 | 2,000.00 | 24,000.00 | 2,427.00 | 29,124.00 | 2,250.00 | 27,000.00 |
| 0071 | 730-21-00020 | Duct Marker (Concrete) | 6 | EACH | 275.00 | 1,650.00 | 250.00 | 1,500.00 | 470.00 | 2,820.00 | 330.00 | 1,980.00 |
| 0072 | 730-22-00220 | Underground Marker Tape (3")(Detectable) | 1,470 | LNFT | 0.40 | 588.00 | 0.50 | 735.00 | 1.19 | 1,749.30 | 0.50 | 735.00 |
| 0073 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 4 | EACH | 10.00 | 40.00 | 10.00 | 40.00 | 16.00 | 64.00 | 12.00 | 48.00 |
| 0074 | 731-02-00100 | Reflectorized Raised Pavement Markers | 327 | EACH | 5.25 | 1,716.75 | 6.00 | 1,962.00 | 6.00 | 1,962.00 | 6.50 | 2,125.50 |
| 0075 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 10,543 | LNFT | 0.60 | 6,325.80 | 1.00 | 10,543.00 | 1.00 | 10,543.00 | 0.75 | 7,907.25 |
| 0076 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 4,315 | LNFT | 1.35 | 5,825.25 | 1.50 | 6,472.50 | 1.30 | 5,609.50 | 1.65 | 7,119.75 |
| 0077 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 55 | LNFT | 5.00 | 275.00 | 5.00 | 275.00 | 7.00 | 385.00 | 6.00 | 330.00 |
| 0078 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.071 | MILE | 7,395.00 | 525.05 | 8,000.00 | 568.00 | 13,908.00 | 987.47 | 9,000.00 | 639.00 |
| 0079 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.102 | MILE | 1,225.00 | 124.95 | 1,300.00 | 132.60 | 10,600.00 | 1,081.20 | 1,500.00 | 153.00 |
| 0080 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.05 | MILE | 3,000.00 | 150.00 | 3,000.00 | 150.00 | 6,592.00 | 329.60 | 3,600.00 | 180.00 |
| 0081 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.059 | MILE | 2,545.00 | 150.16 | 3,500.00 | 206.50 | 5,600.00 | 330.40 | 3,600.00 | 212.40 |
| 0082 | 732-03-04000 | Plastic Pavement Striping (Broken Line) (7" Width) (Preformed Tape) (Retroreflectivity Level I) Contrast | 1.069 | MILE | 5,950.00 | 6,360.55 | 6,000.00 | 6,414.00 | 27,845.00 | 29,766.31 | 7,200.00 | 7,696.80 |
| 0083 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 1 | EACH | 250.00 | 250.00 | 500.00 | 500.00 | 330.00 | 330.00 | 300.00 | 300.00 |
| 0084 | 732-04-19030 | Plastic Pavement Legends and Symbols (Number) (Preformed Heat Applied Retroreflective Thermoplastic) | 5 | EACH | 400.00 | 2,000.00 | 500.00 | 2,500.00 | 670.00 | 3,350.00 | 480.00 | 2,400.00 |
| 0085 | 732-05-00100 | Removal of Existing Markings | 1.069 | MILE | 3,470.00 | 3,709.43 | 10,000.00 | 10,690.00 | 13,203.00 | 14,114.01 | 4,200.00 | 4,489.80 |
| 0086 | 733-01-00100 | Concrete Roadway Barrier (Single Faced) | 253 | LNFT | 155.00 | 39,215.00 | 250.00 | 63,250.00 | 59.00 | 14,927.00 | 335.00 | 84,755.00 |
| 0087 | 737-05-00001 | Painted Curbs and Islands | 293 | LNFT | 8.75 | 2,563.75 | 2.00 | 586.00 | 7.00 | 2,051.00 | 17.25 | 5,054.25 |
| 0088 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 35,820.00 | 35,820.00 | 28,000.00 | 28,000.00 |
| 0089 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 480 | LNFT | 25.00 | 12,000.00 | 15.00 | 7,200.00 | 42.00 | 20,160.00 | 14.50 | 6,960.00 |
| 0090 | 805-01-00100 | Class A Concrete (Base Pedestals for Sign Supports) | 3 | CUYD | 800.00 | 2,400.00 | 750.00 | 2,250.00 | 2,200.00 | 6,600.00 | 1,800.00 | 5,400.00 |
| 0091 | 805-02-00100 | Class A(M) Concrete (Canopy) | 65 | CUYD | 1,200.00 | 78,000.00 | 1,000.00 | 65,000.00 | 925.00 | 60,125.00 | 1,520.00 | 98,800.00 |
| 0092 | 806-01-00100 | Deformed Reinforcing Steel | 14,363 | LB | 1.50 | 21,544.50 | 1.00 | 14,363.00 | 1.40 | 20,108.20 | 1.70 | 24,417.10 |
| 0093 | 807-08-00100 | Structural Metalwork (Maximum Clearance Warning Structure & Tag / Cash Sign Support) | 1 | LUMP | 24,000.00 | 24,000.00 | 5,000.00 | 5,000.00 | 35,596.00 | 35,596.00 | 17,000.00 | 17,000.00 |
| 0094 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 10,000.00 | 20,000.00 | 11,250.00 | 22,500.00 | 17,402.00 | 34,804.00 | 11,800.00 | 23,600.00 |
| 0095 | NS-700-00220 | Impact Attenuator (Kinetic) | 4 | EACH | 12,000.00 | 48,000.00 | 18,250.00 | 73,000.00 | 15,240.00 | 60,960.00 | 14,400.00 | 57,600.00 |
| 0096 | NS-701-00001 | Slotted Drain | 173 | LNFT | 250.00 | 43,250.00 | 150.00 | 25,950.00 | 169.00 | 29,237.00 | 630.00 | 108,990.00 |
| 0097 | NS-MSC-00120 | Drainage Structure (CB-Cap) | 6 | EACH | 2,100.00 | 12,600.00 | 1,000.00 | 6,000.00 | 776.00 | 4,656.00 | 4,800.00 | 28,800.00 |
| 0098 | NS-MSC-00120 | Drainage Structure (CB-Adjust) | 3 | EACH | 2,610.00 | 7,830.00 | 1,000.00 | 3,000.00 | 663.00 | 1,989.00 | 5,800.00 | 17,400.00 |
| 0099 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | 25.5 | SQYD | 800.00 | 20,400.00 | 150.00 | 3,825.00 | 200.00 | 5,100.00 | 70.00 | 1,785.00 |
| 0100 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,800 | INLF | 1.00 | 3,800.00 | 5.00 | 19,000.00 | 1.65 | 6,270.00 | 2.00 | 7,600.00 |
| CONTRACTOR TOTAL | 1,449,702.74 | 1,461,883.60 | 1,461,960.01 | 1,720,203.71 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Jb James Construction Llc |
- 10 - Three C's Properties Inc |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 6,816.97 | 6,816.97 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 52,281.34 | 52,281.34 |
| 0003 | 202-02-00010 | Removal of Raised Reinforced Concrete Median | 5 | EACH | 1,000.00 | 5,000.00 | 221.50 | 1,107.50 |
| 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 700.00 | 700.00 | 2,161.43 | 2,161.43 |
| 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 1,855 | LNFT | 3.00 | 5,565.00 | 10.03 | 18,605.65 |
| 0006 | 202-02-26300 | Removal of Median / Island | 887 | SQYD | 11.00 | 9,757.00 | 9.39 | 8,328.93 |
| 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) (15"x15' RCP, Sta. 12+89, 87.79' Rt.) | 15 | LNFT | 30.00 | 450.00 | 130.52 | 1,957.80 |
| 0008 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,827 | SQYD | 10.00 | 18,270.00 | 6.08 | 11,108.16 |
| 0009 | 202-02-38200 | Removal of Signs | 4 | EACH | 150.00 | 600.00 | 75.70 | 302.80 |
| 0010 | 202-02-38240 | Removal of Signs and Supports | 9 | EACH | 250.00 | 2,250.00 | 129.42 | 1,164.78 |
| 0011 | 202-03-00010 | Relocation of Guard Rail (1 at 90 L.F., 1 at 40 L.F.) | 2 | EACH | 8,000.00 | 16,000.00 | 2,242.27 | 4,484.54 |
| 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,000.00 | 50,000.00 | 10,733.98 | 10,733.98 |
| 0013 | 204-06-00100 | Temporary Silt Fencing | 910 | LNFT | 3.00 | 2,730.00 | 3.21 | 2,921.10 |
| 0014 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 153.6 | SQYD | 20.00 | 3,072.00 | 21.12 | 3,244.03 |
| 0015 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 3,746.3 | SQYD | 24.00 | 89,911.20 | 21.34 | 79,946.04 |
| 0016 | 304-05-00100 | Lime Treatment (Type E) (12" Thick) (9% by Volume) (To be Used as Directed by the Project Engineer) | 54 | TON | 150.00 | 8,100.00 | 375.58 | 20,281.32 |
| 0017 | 502-03-00100 | Superpave Asphaltic Concrete (2" Thick) | 153.6 | SQYD | 50.00 | 7,680.00 | 51.53 | 7,915.01 |
| 0018 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 3,507.2 | SQYD | 70.00 | 245,504.00 | 90.84 | 318,594.05 |
| 0019 | 602-01-00100 | Cleaning and Filling Existing Longitudinal Pavement Joints | 250 | LNFT | 6.00 | 1,500.00 | 4.01 | 1,002.50 |
| 0020 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 250 | LNFT | 6.00 | 1,500.00 | 3.40 | 850.00 |
| 0021 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 58 | SQYD | 200.00 | 11,600.00 | 266.55 | 15,459.90 |
| 0022 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 70 | SQYD | 180.00 | 12,600.00 | 399.54 | 27,967.80 |
| 0023 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 39 | LNFT | 65.00 | 2,535.00 | 260.71 | 10,167.69 |
| 0024 | 701-12-01000 | Corrugated Metal Pipe (Extension) (12") | 9 | LNFT | 60.00 | 540.00 | 313.94 | 2,825.46 |
| 0025 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,300.00 | 3,300.00 | 5,646.69 | 5,646.69 |
| 0026 | 702-03-00500 | Catch Basins (CB-06) | 5 | EACH | 6,000.00 | 30,000.00 | 7,025.29 | 35,126.45 |
| 0027 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 7,000.00 | 7,000.00 | 8,752.94 | 8,752.94 |
| 0028 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 15.1 | SQYD | 65.00 | 981.50 | 59.04 | 891.50 |
| 0029 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 36 | SQYD | 75.00 | 2,700.00 | 94.56 | 3,404.16 |
| 0030 | 707-01-00100 | Concrete Curb (Type "A", 12" Barrier) | 154.9 | LNFT | 22.00 | 3,407.80 | 49.20 | 7,621.08 |
| 0031 | 707-01-00100 | Concrete Curb (Retention Curb, See Sheet 2e) | 32 | LNFT | 16.00 | 512.00 | 196.73 | 6,295.36 |
| 0032 | 707-01-00200 | Concrete Curb (Barrier) | 3,309.2 | LNFT | 5.00 | 16,546.00 | 30.68 | 101,526.26 |
| 0033 | 707-01-00300 | Concrete Curb (Mountable) | 46 | LNFT | 15.00 | 690.00 | 92.72 | 4,265.12 |
| 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 21,598.57 | 21,598.57 |
| 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 6,000 | LNFT | 0.25 | 1,500.00 | 0.15 | 900.00 |
| 0036 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 150 | LNFT | 0.35 | 52.50 | 0.25 | 37.50 |
| 0037 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 64 | EACH | 850.00 | 54,400.00 | 795.95 | 50,940.80 |
| 0038 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 56 | EACH | 240.00 | 13,440.00 | 52.63 | 2,947.28 |
| 0039 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 1,410 | SQYD | 8.00 | 11,280.00 | 6.64 | 9,362.40 |
| 0040 | 716-01-00100 | Mulch (Vegetative) | 0.33 | TON | 2,000.00 | 660.00 | 5,114.01 | 1,687.62 |
| 0041 | 717-01-00100 | Seeding | 5 | LB | 15.00 | 75.00 | 34.03 | 170.15 |
| 0042 | 718-01-00100 | Fertilizer | 165 | LB | 1.00 | 165.00 | 2.27 | 374.55 |
| 0043 | 725-01-00100 | Temporary Detour Roads | 9.3 | SQYD | 150.00 | 1,395.00 | 513.16 | 4,772.39 |
| 0044 | 726-01-00100 | Bedding Material | 9 | CUYD | 76.00 | 684.00 | 78.71 | 708.39 |
| 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 170,000.00 | 170,000.00 | 67,350.07 | 67,350.07 |
| 0046 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 9 | SQFT | 210.00 | 1,890.00 | 20.42 | 183.78 |
| 0047 | 729-01-00103 | Sign (Type A)(Relocate) | 74 | SQFT | 220.00 | 16,280.00 | 16.30 | 1,206.20 |
| 0048 | 729-04-00103 | Sign (Type D)(Relocate) | 291 | SQFT | 84.00 | 24,444.00 | 19.07 | 5,549.37 |
| 0049 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 236 | SQFT | 70.00 | 16,520.00 | 41.33 | 9,753.88 |
| 0050 | 730-01-00100 | Trenching and Backfilling | 1,700 | LNFT | 4.50 | 7,650.00 | 8.94 | 15,198.00 |
| 0051 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(4#8, 1#10G) | 160 | LNFT | 7.00 | 1,120.00 | 12.98 | 2,076.80 |
| 0052 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(4#10, 2#10G) | 180 | LNFT | 6.25 | 1,125.00 | 10.47 | 1,884.60 |
| 0053 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(2#8, 1#10G) | 1,520 | LNFT | 5.00 | 7,600.00 | 6.04 | 9,180.80 |
| 0054 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (Schedule 40)(19#8, 4#10, 1#2G, 7#8G, 1#10G) | 100 | LNFT | 35.00 | 3,500.00 | 42.53 | 4,253.00 |
| 0055 | 730-02-02040 | Conduit with Conductors (Rigid Aluminum) (1") (2#10, 1#10G) | 80 | LNFT | 11.00 | 880.00 | 26.77 | 2,141.60 |
| 0056 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") (19#8, 4#10, 1#2G, 7#8G, 1#10G) | 5 | LNFT | 40.00 | 200.00 | 88.47 | 442.35 |
| 0057 | 730-04-00100 | Jacked or Bored Casing (4" Diameter) (PVC/HDPE) | 360 | LNFT | 20.00 | 7,200.00 | 45.43 | 16,354.80 |
| 0058 | 730-05-10000 | Light Pole (30')(Aluminum) | 8 | EACH | 3,800.00 | 30,400.00 | 4,506.89 | 36,055.12 |
| 0059 | 730-05-10000 | Light Pole (30')(Aluminum)(Twin Arm) | 3 | EACH | 3,600.00 | 10,800.00 | 4,747.34 | 14,242.02 |
| 0060 | 730-05-12200 | Light Pole (40') (Aluminum) (Twin Arm) | 1 | EACH | 4,000.00 | 4,000.00 | 5,019.55 | 5,019.55 |
| 0061 | 730-07-04000 | Luminaire (150 Watt) (High PressureSodium) (Low Mast) | 2 | EACH | 700.00 | 1,400.00 | 945.92 | 1,891.84 |
| 0062 | 730-07-05000 | Luminaire (250 Watt) (High PressureSodium) (Low Mast) | 14 | EACH | 700.00 | 9,800.00 | 941.39 | 13,179.46 |
| 0063 | 730-07-06000 | Luminaire (400 Watt) (High PressureSodium) (Install)(Under Canopy) | 4 | EACH | 125.00 | 500.00 | 723.62 | 2,894.48 |
| 0064 | 730-08-00200 | Electrical Service Point (Structure) | 1 | EACH | 5,600.00 | 5,600.00 | 4,157.98 | 4,157.98 |
| 0065 | 730-09-00100 | Electrical System | 1 | LUMP | 14,000.00 | 14,000.00 | 7,696.68 | 7,696.68 |
| 0066 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 1,500.00 | 1,500.00 | 4,752.30 | 4,752.30 |
| 0067 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 10 | EACH | 500.00 | 5,000.00 | 1,275.62 | 12,756.20 |
| 0068 | 730-14-00100 | Removal and Disposal of Luminaires | 12 | EACH | 60.00 | 720.00 | 344.80 | 4,137.60 |
| 0069 | 730-16-00300 | Underground Junction Box (13" x 24") | 6 | EACH | 400.00 | 2,400.00 | 749.28 | 4,495.68 |
| 0070 | 730-19-00010 | Modular Breakaway Cable System | 12 | EACH | 1,700.00 | 20,400.00 | 2,105.08 | 25,260.96 |
| 0071 | 730-21-00020 | Duct Marker (Concrete) | 6 | EACH | 450.00 | 2,700.00 | 406.04 | 2,436.24 |
| 0072 | 730-22-00220 | Underground Marker Tape (3")(Detectable) | 1,470 | LNFT | 0.50 | 735.00 | 3.74 | 5,497.80 |
| 0073 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 4 | EACH | 12.00 | 48.00 | 61.14 | 244.56 |
| 0074 | 731-02-00100 | Reflectorized Raised Pavement Markers | 327 | EACH | 5.00 | 1,635.00 | 7.78 | 2,544.06 |
| 0075 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 10,543 | LNFT | 0.60 | 6,325.80 | 0.77 | 8,118.11 |
| 0076 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 4,315 | LNFT | 1.00 | 4,315.00 | 1.67 | 7,206.05 |
| 0077 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 55 | LNFT | 7.00 | 385.00 | 3,694.00 | 203,170.00 |
| 0078 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.071 | MILE | 10,500.00 | 745.50 | 22,534.48 | 1,599.95 |
| 0079 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.102 | MILE | 5,000.00 | 510.00 | 5,323.58 | 543.01 |
| 0080 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.05 | MILE | 5,000.00 | 250.00 | 15,354.44 | 767.72 |
| 0081 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.059 | MILE | 5,100.00 | 300.90 | 13,531.28 | 798.35 |
| 0082 | 732-03-04000 | Plastic Pavement Striping (Broken Line) (7" Width) (Preformed Tape) (Retroreflectivity Level I) Contrast | 1.069 | MILE | 5,400.00 | 5,772.60 | 7,736.90 | 8,270.75 |
| 0083 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 1 | EACH | 255.00 | 255.00 | 283.55 | 283.55 |
| 0084 | 732-04-19030 | Plastic Pavement Legends and Symbols (Number) (Preformed Heat Applied Retroreflective Thermoplastic) | 5 | EACH | 505.00 | 2,525.00 | 493.52 | 2,467.60 |
| 0085 | 732-05-00100 | Removal of Existing Markings | 1.069 | MILE | 1,100.00 | 1,175.90 | 4,901.40 | 5,239.60 |
| 0086 | 733-01-00100 | Concrete Roadway Barrier (Single Faced) | 253 | LNFT | 65.00 | 16,445.00 | 376.43 | 95,236.79 |
| 0087 | 737-05-00001 | Painted Curbs and Islands | 293 | LNFT | 6.00 | 1,758.00 | 6.35 | 1,860.55 |
| 0088 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 5,699.92 | 5,699.92 |
| 0089 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 480 | LNFT | 32.00 | 15,360.00 | 84.30 | 40,464.00 |
| 0090 | 805-01-00100 | Class A Concrete (Base Pedestals for Sign Supports) | 3 | CUYD | 1,200.00 | 3,600.00 | 1,966.44 | 5,899.32 |
| 0091 | 805-02-00100 | Class A(M) Concrete (Canopy) | 65 | CUYD | 2,000.00 | 130,000.00 | 1,048.62 | 68,160.30 |
| 0092 | 806-01-00100 | Deformed Reinforcing Steel | 14,363 | LB | 1.35 | 19,390.05 | 2.36 | 33,896.68 |
| 0093 | 807-08-00100 | Structural Metalwork (Maximum Clearance Warning Structure & Tag / Cash Sign Support) | 1 | LUMP | 38,500.00 | 38,500.00 | 34,255.69 | 34,255.69 |
| 0094 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 10,500.00 | 21,000.00 | 16,342.26 | 32,684.52 |
| 0095 | NS-700-00220 | Impact Attenuator (Kinetic) | 4 | EACH | 15,000.00 | 60,000.00 | 24,408.03 | 97,632.12 |
| 0096 | NS-701-00001 | Slotted Drain | 173 | LNFT | 155.00 | 26,815.00 | 196.77 | 34,041.21 |
| 0097 | NS-MSC-00120 | Drainage Structure (CB-Cap) | 6 | EACH | 1,500.00 | 9,000.00 | 2,532.94 | 15,197.64 |
| 0098 | NS-MSC-00120 | Drainage Structure (CB-Adjust) | 3 | EACH | 2,000.00 | 6,000.00 | 715.36 | 2,146.08 |
| 0099 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | 25.5 | SQYD | 225.00 | 5,737.50 | 182.96 | 4,665.48 |
| 0100 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,800 | INLF | 1.25 | 4,750.00 | 17.22 | 65,436.00 |
| CONTRACTOR TOTAL | 1,725,616.25 | 1,935,836.76 | ||||||