Bid Tabulations
Letting of
05/09/2012
LA DOTD Headquarters
| Lead Project: H.009283.6 | |
| Parish: Lafourche | |
| Routes: US 90 | |
| Description: US 90 NEAR DES ALLEMANDS | |
| Type Const: GRADING AND PAVEMENT PATCHING | |
| Estimated Construction Cost: $276,302.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $143,678.80 |
| 2 | 48896 | Command Construction Industries LLC | $173,523.00 |
| 3 | 24901 | Hard Rock Construction LLC | $208,384.00 |
| 4 | 38590 | J.C. Patin Group, LLC | $266,498.40 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Byron E. Talbot Contractor, Inc. |
- 2 - Command Construction Industries LLC |
- 3 - Hard Rock Construction LLC |
- 4 - J.C. Patin Group, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02020 | Removal of Asphalt Pavement | 590 | SQYD | 11.00 | 6,490.00 | 10.00 | 5,900.00 | 20.00 | 11,800.00 | 7.00 | 4,130.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 341 | SQYD | 9.50 | 3,239.50 | 10.00 | 3,410.00 | 10.00 | 3,410.00 | 6.00 | 2,046.00 |
| 0003 | 202-02-32120 | Removal of Pipe (Side Drain) REMOVAL OF SIDE DRAIN 18" CMP | 82 | LNFT | 10.00 | 820.00 | 10.00 | 820.00 | 3.00 | 246.00 | 15.00 | 1,230.00 |
| 0004 | 203-02-00100 | Drainage Excavation | 40 | CUYD | 20.00 | 800.00 | 25.00 | 1,000.00 | 50.00 | 2,000.00 | 11.00 | 440.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 25 | CUYD | 50.00 | 1,250.00 | 30.00 | 750.00 | 15.00 | 375.00 | 78.00 | 1,950.00 |
| 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 20 | CUYD | 75.00 | 1,500.00 | 100.00 | 2,000.00 | 40.00 | 800.00 | 82.00 | 1,640.00 |
| 0007 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 590 | SQYD | 67.00 | 39,530.00 | 75.00 | 44,250.00 | 90.00 | 53,100.00 | 57.00 | 33,630.00 |
| 0008 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 648 | LNFT | 38.00 | 24,624.00 | 75.00 | 48,600.00 | 80.00 | 51,840.00 | 64.00 | 41,472.00 |
| 0009 | 702-03-00100 | Catch Basins (CB-01) | 6 | EACH | 1,800.00 | 10,800.00 | 2,250.00 | 13,500.00 | 2,200.00 | 13,200.00 | 3,641.00 | 21,846.00 |
| 0010 | 706-02-00200 | Concrete Drive (6" Thick) | 341 | SQYD | 48.50 | 16,538.50 | 45.00 | 15,345.00 | 65.00 | 22,165.00 | 71.00 | 24,211.00 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 1,000.00 | 1,000.00 | 5,600.00 | 5,600.00 | 27,393.00 | 27,393.00 |
| 0012 | 717-01-00100 | Seeding | 5 | LB | 50.00 | 250.00 | 10.00 | 50.00 | 10.00 | 50.00 | 258.00 | 1,290.00 |
| 0013 | 718-01-00100 | Fertilizer | 70 | LB | 7.00 | 490.00 | 10.00 | 700.00 | 1.00 | 70.00 | 14.00 | 980.00 |
| 0014 | 726-01-00100 | Bedding Material | 130 | CUYD | 55.00 | 7,150.00 | 75.00 | 9,750.00 | 40.00 | 5,200.00 | 80.00 | 10,400.00 |
| 0015 | 727-01-00100 | Mobilization | 1 | LUMP | 15,500.00 | 15,500.00 | 20,000.00 | 20,000.00 | 31,000.00 | 31,000.00 | 72,085.00 | 72,085.00 |
| 0016 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,600.00 | 3,600.00 | 1,000.00 | 1,000.00 | 3,000.00 | 3,000.00 | 16,563.00 | 16,563.00 |
| 0017 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 4,068 | INLF | 0.10 | 406.80 | 1.00 | 4,068.00 | 1.00 | 4,068.00 | 1.10 | 4,474.80 |
| 0018 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 460 | INLF | 1.50 | 690.00 | 3.00 | 1,380.00 | 1.00 | 460.00 | 1.56 | 717.60 |
| CONTRACTOR TOTAL | 143,678.80 | 173,523.00 | 208,384.00 | 266,498.40 | ||||||||